PWS 20260928.pdf
PDF 116 KB Posted
- Attached to
- Contingency Transportation Services BPA Federal contract opportunity
- Solicitation number
- FA5025-27-Q-A004
About this file
This is a Performance Work Statement (PWS) for Contingency Transportation Services established as a Blanket Purchase Agreement (BPA) by the 356th Expeditionary Theater Support Group (ETSG) at Andersen Air Force Base, Guam, dated September 28, 2026.
The contractor shall provide commercial line haul and heavy equipment transport services including vehicle hauling and freight cargo shipments to support defense operations, exercises, and logistical movements across military installations and port facilities on Guam. The contractor must supply all personnel, equipment, tools, materials, supervision, and services necessary to perform operations safely and in compliance with federal, military, territorial, and Department of Transportation regulations. This is a non-personal services contract where the contractor maintains full control over personnel management and operational methods. The Government will provide 96-hour advanced notice for scheduled transports, with emergency requests requiring mutual agreement. All contractor personnel require background checks, DBIDS credentials, and valid commercial driver's licenses (CDL) appropriate to the vehicle class. Primary operational locations include Andersen Air Force Base (including North Gate and biosecurity treatment zones), Naval Station Guam Port Operations, Jose D. Leon Guerrero Commercial Port in Piti, Antonio B. Won Pat International Airport, and designated maintenance facilities. Cargo securement must comply with FMCSA and DOT standards, utilizing Grade 70 or Grade 80 tie-down chains with ratchet binders, proper blocking and cribbing for tracked equipment, and adherence to equipment weight capacities. Performance standards require 100% compliance with safe cargo securement standards, 100% permit compliance, and 95% on-time arrival within scheduled transport windows. The contractor must submit DPW Oversized/Overweight Permits in digital PDF format prior to each oversized transport.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
PROJECT TITLE: Contingency Transportation Services BPA
USING AGENCY: 356th Expeditionary Theater Support Group (ETSG), Guam
DATE: 28 September 2026
1.0 GENERAL INFORMATION & SCOPE
1.1 Background and Objective
The 356th Expeditionary Theater Support Group (ETSG) requires reliable, responsive, and secure commercial line haul and heavy equipment transport services across various military installations and port facilities on the island of Guam. The objective of this contract is to safely transport heavy equipment, tactical and non-tactical vehicles, associated gear, and general freight cargo to support ongoing defense operations, exercises, and logistical movements.
1.2 Scope of Work
The Contractor shall provide all personnel, equipment, tools, materials, supervision, and non-personal services necessary to perform commercial line haul, heavy equipment transport, vehicle hauling, and freight cargo shipments as assigned by the 356th ETSG.
The Contractor shall ensure all operations are conducted safely, efficiently, and in strict compliance with federal, military, local territory, and Department of Transportation (DOT) laws and regulations.
1.3 Service Type
This is a non-personal services contract. The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under this contract, the Contractor shall manage, control, and supervise its personnel to ensure safe and compliant service delivery.
2.0 CONTRACTOR REQUIREMENTS &
PERSONNEL
2.1 General Performance
The Contractor shall perform commercial line haul of heavy equipment, vehicles, and freight cargo as directed by the Contracting Officer’s Representative (COR) or designated 356th ETSG representative.
2.2 Base Access, Security, and Credentials
Access Control: Contractor personnel without a military or Department of War (Dow) Common Access Card (CAC) must enter Andersen Air Force Base (AAFB) through the North Gate Visitor Control Center (VCC).
Background Checks: All Contractor personnel requiring base access must pass a background check and have an approved Government sponsor.
Defense Biometric Identification System (DBIDS): The Government will sponsor DBIDS credentials and base access passes for all qualified Contractor personnel. This access is restricted to official contract operations at designated treatment zones and transport locations on Andersen AFB and other joint region installations.
Compliance: The Contractor shall ensure all personnel maintain valid identification and follow all base security regulations.
2.3 Operator Licensing and Qualifications
Licensing: The Contractor shall ensure all vehicle and equipment operators are trained, qualified, and hold the proper commercial driver's licenses (CDL) and certifications required by the Territory of Guam and federal DOT standards for the specific class of vehicle being operated.
Safety: Operators must demonstrate the competency to safely load, transport, secure, and unload heavy machinery, tracked vehicles, and oversized cargo under diverse weather and terrain conditions.
3.0 PERFORMANCE REQUIREMENTS &
SPECIFIC TASKS
3.1 Notice and Scheduling
96-Hour Advanced Notice: The Government will provide the Contractor with no less than ninety-six (96) hours notice prior to any scheduled transport requirement.
Scheduling Adjustments: Any emergency transport requested with less than 96 hours notice must be mutually agreed upon by both the Contractor and the Contracting Officer (CO) or COR.
3.2 Equipment and Cargo Securement Standards
The Contractor shall properly secure all loads in accordance with Federal Motor Carrier Safety Administration (FMCSA) and Department of Transportation (DOT) standards.
Key cargo securement methods include, but are not limited to:
Shoring, Bracing, and Blocking: The Contractor shall secure, brace, or block oversized machinery and components on flatbeds or trailers to prevent lateral or longitudinal shifting during transit.
Tracked Equipment: Shoring must meet specific port authority and military requirements for tracked equipment (e.g., bulldozers, excavators) to protect trailer decks.
Weight Capacity Compliance: The Contractor must strictly adhere to the equipment's physical shipping or data plate weight to avoid overloading trailers, causing safety hazards, or incurring Port Authority weight fines.
Blocking and Cribbing: The Contractor shall utilize heavy-duty hardwood timbers or composite pads beneath machinery to distribute weight evenly and prevent direct metal-on-deck sliding.
Tie-Down Chains and Binders: The Contractor shall utilize Grade 70 or Grade 80 transport chains paired with ratchet binders. Lever binders are prohibited unless specifically authorized. All chains and binders must be rated for the specific Working Load Limit (WLL) of the equipment being transported.
4.0 KEY OPERATIONAL LOCATIONS
The Contractor shall perform transportation services to, from, and between the following primary locations on Guam:
Andersen Air Force Base (AAFB), Guam (including North Gate, cargo yards, and designated biosecurity treatment zones).
Naval Station (NAVSTA) Guam Port Operations, Apra Harbor.
Jose D. Leon Guerrero Commercial Port, Piti, Guam.
Antonio B. Won Pat International Airport (GUM), Tamuning, Guam.
Designated Maintenance Facilities (both military and commercial maintenance yards as directed by the COR).
5.0 GOVERNMENT-FURNISHED PROPERTY
(GFP) & SERVICES
5.1 Base Access Sponsorship
The Government will provide the necessary sponsorship, forms, and administrative routing required for the Contractor to obtain DBIDS credentials, vehicle decals, and base access passes.
5.2 Joint Port Coordination & BOL Signing
A designated 356th ETSG representative will be physically present or coordinate administrative coverage to receive and sign the Bill of Lading (BOL) from Port Authorities at the Jose D. Leon Guerrero Commercial Port in Piti, Guam.
6.0 DELIVERABLES
The Contractor shall track and submit the following deliverables to the COR:
Deliverable Frequency Format Submit To
DPW
Oversized/Overweight Permits
Prior to each oversized/heavy transport
Digital (PDF) copy
356th ETSG COR / Records Management
7.0 QUALITY SURVEILLANCE &
PERFORMANCE STANDARDS
Contractor performance will be evaluated based on the following performance thresholds:
Performance Requirement
Standard / Metric Acceptable Quality Level
(AQL)
Surveillance Method
Safe Cargo Securement
100% compliance with DOT/FMCSA securement standards. No shifting of cargo.
Grade 70/80 chains utilized.
100% Compliance Random inspections by COR / Safety Officers
Permit Compliance
Valid DPW permits obtained and copied to records prior to dispatching oversized loads.
100% Compliance 100% inspection of manifest files
Punctual Execution
Arrival within the scheduled transport window based on the 96-hour notice.
95% On-Time rate
| PERFORMANCE WORK STATEMENT (PWS) |
| 1.0 GENERAL INFORMATION & SCOPE |
| 1.1 Background and Objective |
| 1.2 Scope of Work |
| 1.3 Service Type |
| 2.0 CONTRACTOR REQUIREMENTS & PERSONNEL |
| 2.1 General Performance |
| 2.2 Base Access, Security, and Credentials |
| 2.3 Operator Licensing and Qualifications |
| 3.0 PERFORMANCE REQUIREMENTS & SPECIFIC TASKS |
| 3.1 Notice and Scheduling |
| 3.2 Equipment and Cargo Securement Standards |
| 4.0 KEY OPERATIONAL LOCATIONS |
| 5.0 GOVERNMENT-FURNISHED PROPERTY (GFP) & SERVICES |
| 5.1 Base Access Sponsorship |
| 5.2 Joint Port Coordination & BOL Signing |
| 6.0 DELIVERABLES |
| 7.0 QUALITY SURVEILLANCE & PERFORMANCE STANDARDS |
File details come from the government source that posted it. Updated .