This is a project manual and bidding document for a public works construction project issued by the City of Seattle Department of Finance and Administrative Services, Department of Parks and Recreation. The Meridian Play Area Renovation and ADA Meridian RR Design project is located at 4920 Meridian Avenue North, Seattle, Washington 98103, and involves replacing the existing play area with new play equipment, accessible access routes, site furniture, updated landscaping, and an accessible restroom facility. The project includes two optional alternates: Alternate 1 covers sidewalk paving and replacement from the new accessible connection to the northeast corner of Good Shepherd Center, and Alternate 2 addresses replacement of a portion of engineered wood fiber play surfacing with poured-in-place surfacing and cast-in-place concrete slab underlay. No pre-bid site inspection meeting is scheduled. Bids were due September 2, 2026, at 2:00 PM, submitted electronically through OpenGov. Contract execution is expected within 60 days of bid opening. The contractor must achieve substantial completion within 100 working days and physical completion within 115 working days of the Notice to Proceed, with liquidated damages of $1,000 per working day for delays beyond substantial completion.

The engineer's estimate for the base bid is $940,347.00, with Alternate 1 estimated at $82,250.00 and Alternate 2 at $392,728.00, excluding sales tax. The contract is funded through REET II Capital Fund, Seattle Park District Fund, and General Fund. This is a lump sum contract under contract numbers PRK730300-228 and PRK730300-242, with public works number PW#2025-037. The project is classified as a Playground Renovation type with a past performance WMBE utilization rate of 15 percent; bidders must submit an Inclusion Plan demonstrating good faith efforts to achieve WMBE participation and must earn a minimum of 10 points on the plan to be deemed responsive. A bid guaranty equal to 5 percent of the maximum bid amount is required. Bidders must meet mandatory responsibility criteria including valid Washington contractor registration, UBI number, industrial insurance coverage, prevailing wage training certification, and compliance with fair labor standards and equal benefits requirements. The project is subject to prevailing wage requirements under RCW 39.12 and paid sick and safe time requirements under SMC 14.16 and RCW 49.46.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

Meridian Play Area Renovation & ADA Meridian RR Design

OWNER:

City of Seattle Department of Finance & Administrative Services, Purchasing And Contracting

ADMINISTERING DEPARTMENT:

City of Seattle, Department of Parks and Recreation

Planning and Capital Development Division 300 Elliott Avenue West, Suite 100

Seattle, WA 98119 Project Manager: Ray Gontarz

Contact: (206) 684-7936

PREPARED BY:

GGLO

1301 5th Avenue, Suite 2200 Seattle, WA 98101

Principal-in-Charge: Marieke Lacasse Contact: (206) 467-5828

Ordinance Number(s): 126490, 126725, 126955 Contract #PRK730300-228, PRK730300-242

PW#2025-037

November 26, 2025

GontarR1 Typewritten Text

(RE-BID)

The City of Seattle

Department of Finance and Administrative Services

Project Manual for

Meridian Play Area Renovation & ADA Meridian RR Design as Authorized by Ordinance No(s).126490, 126725, 126955

Funding Source: REET II CAPITAL FUND, Seattle Park District Fund, General Fund

PRK: PRK730300-228, PRK730300-242

PW#2025-037

Prepared by:

City of Seattle, Parks and Recreation Department Planning and Capital Development Branch

300 Elliott Avenue West, Suite 100 Seattle, WA 98119

Date Eduardo Aban, Interim Park Engineer

APPROVED FOR ADVERTISING

FAS PURCHASING AND CONTRACTING

Date

By:

Director, Purchasing and Contracting

08/11/2026

08/11/2026

GontarR1 Typewritten Text

(RE-BID)

https://seattlegov.na1.adobesign.com/verifier?tx=CBJCHBCAABAArjnqy4pXrDjMCEKLxRomy7A6Kb9c4yIx https://seattlegov.na1.adobesign.com/verifier?tx=CBJCHBCAABAArjnqy4pXrDjMCEKLxRomy7A6Kb9c4yIx

Meridian Play Area Renovation & ADA Meridian RR Design

11/26/2025

CERTIFICATIONS

LANDSCAPE ARCHITECT

I hereby certify that this project specification was

Prepared by me or under my direct supervision and

That I am a licensed Landscape Architect in the

State of Washington

Marieke Lacasse PLA FASLA

GGLO Design

CIVIL ENGINEER

The Civil Engineer’s seal and signature

Affixed hereon indicates this Engineer’s review

And participation in the preparation of this

Project Manual. Participation is limited to the

Specification Sections pertaining to her discipline

Puja Kashyup, P.E.

KPFF Engineering

Prepared by Marieke Lacasse/GGLO Design

DIVISION 11 – Equipment Section 11 68 13 Play Area Equipment DIVISION 12 - Furnishings Section 12 93 00 Site Furnishings DIVISION 31 - Earthwork Section 31 13 13 Tree & Plant Removal DIVISION 32 - Exterior Improvements Section 32 18 16.13 Engineered Wood Fiber Safety Surfacing Section 32 18 16.19 Play Area Sand Surfacing Section 32 80 00 Irrigation Systems Section 32 91 13 Soil Preparation Section 32 92 19.16 Hydroseeding Section 32 93 00 Landscape Planting

Prepared by Puja Kashyup/KPFF Engineering

DIVISION 02 - Existing Conditions Section 02 41 13 Selective Site Demolition DIVISION 31 - Earthwork Section 31 11 00 Clearing & Grubbing DIVISION 32 - Exterior Improvements Section 32 12 16.13 Asphalt Paving for Pathways Section 32 13 13 Concrete Paving

Prepared by Kevin Reed/GGLO Design

DIVISION 03 - Concrete Section 03 10 00 Concrete Form work Section 03 20 00 Concrete Reinforcement Section 03 30 00 Cast-in-Place Concrete Section 03 35 00 Concrete Finishing Section 03 60 00 Grout DIVISION 05 - Metals Section 05 40 00 Cold Formed Metal Framing Section 05 50 13 Miscellaneous Metal Fabrications Section 05 52 00 Metal Handrails and Guardrails DIVISION 06 – Wood, Plastics and Composites Section 06 20 00 Finish Carpentry DIVISION 07 - Thermal and Moisture Protection Section 07 18 50 Epoxy Moisture Mitigation System Section 07 25 00 Water Resistive Barriers Section 07 46 46 Fiber Cement Board Section 07 62 00 Sheet Metal Flashing and Trim Section 07 92 00 Joint Sealants DIVISION 08 - Openings Section 08 10 00 Steel Doors and Frames Section 08 71 00 Door Hardware DIVISION 09 - Finishes Section 09 22 16 Non-Structural Metal Framing Section 09 29 00 Gypsum Board Section 09 67 23 Resinous Flooring Section 09 91 13 Exterior Painting Section 09 91 23 Interior Painting Section 09 96 23 Graffiti Resistance Coatings DIVISION 10 – Specialties Section 10 14 00.23 Building Signage Section 10 28 13 Toilet Accessories DIVISION 22 – Plumbing Section 22 40 00 Plumbing Fixtures

STATE OF WASHINGTON

10330

REGISTERED

ARCHITECT

KEVIN D. REED

11/15/2027

GontarR1

Meridian Play Area Renovation & ADA Meridian RR Design Table of Contents

DIVISION 00 - Bidding Requirements, Contract Forms, & Conditions of the Contract Section 00 11 13 Section 00 21 13 Section 00 41 00 Section 00 43 93 Section 00 52 00 Section 00 60 00 Section 00 72 00 Section 00 73 16 Section 00 73 43 Section 00 80 10

Pre-Bid Information and Advertisement for Bids Instructions to Bidders Bid Form Bid Submittal Checklist Agreement Form Sample Forms General Conditions Insurance Requirements Prevailing Wage Rate Requirements Contractor Performance (with form)

DIVISION 01 - General Requirements Section 01 11 00 Summary of Work Section 01 22 10 Measurement & Payment Section 01 23 00 Base Bid & Optional Bid Items Section 01 25 00 Specified Products & Substitution Section 01 26 00 Contract Modification Procedures Section 01 29 73 Schedule of Values and Pay Estimates Section 01 31 19 Project Meetings Section 01 32 13 Progress Schedules Section 01 33 10 Submittals Section 01 35 00 Cutting and Patching Section 01 35 29 Health and Safety Section 01 41 26 Permitting Requirements Section 01 45 00 Quality Control Section 01 50 00 Temporary Facilities & Control Section 01 56 26 Temporary Fencing Section 01 56 39 Temporary Tree, Vegetation and Soil Protection Section 01 57 13 Construction Stormwater Control Section 01 57 19 Temporary Environmental Pollution Control Section 01 71 23 Field Engineering Section 01 74 19 Construction Waste Material & Disposal Section 01 74 23 Final Cleaning Section 01 76 00 Protection of Existing Facilities Section 01 77 19 Contract Closeout Section 01 78 23 Operation & Maintenance Manual Section 01 78 36 Warranties & Bonds Section 01 78 39 Record Documents

DIVISION 02 - Existing Conditions Section 02 41 13 Selective Site Demolition

GontarR1

DIVISION 03 - Concrete Section 03 10 00 Concrete Formwork Section 03 20 00 Concrete Reinforcement Section 03 30 00 Cast-in-Place Concrete Section 03 35 00 Concrete Finishing Section 03 60 00 Grout

DIVISION 05 - Metals

Section 05 40 00 Cold Formed Metal Framing Section 05 50 13 Miscellaneous Metal Fabrications Section 05 52 00 Metal Handrails and Guardrails

DIVISION 06 – Wood, Plastics and Composites

Section 06 20 00 Finish Carpentry

DIVISION 07 - Thermal and Moisture Protection

Section 07 18 50 Epoxy Moisture Mitigation System Section 07 25 00 Water Resistive Barriers Section 07 46 46 Fiber Cement Board Section 07 62 00 Sheet Metal Flashing and Trim Section 07 92 00 Joint Sealants

DIVISION 08 - Openings

Section 08 10 00 Steel Doors and Frames Section 08 71 00 Door Hardware

DIVISION 09 - Finishes Section 09 22 16 Non-Structural Metal Framing Section 09 29 00 Gypsum Board Section 09 67 23 Resinous Flooring Section 09 91 13 Exterior Painting Section 09 91 23 Interior Painting Section 09 96 23 Graffiti Resistance Coatings

DIVISION 10 – Specialties

Section 10 14 00.23 Building Signage Section 10 28 13 Toilet Accessories

DIVISION 11 – Equipment Section 11 68 13 Play Area Equipment

DIVISION 12 - Furnishings

Section 12 93 00 Site Furnishings

DIVISION 22 – Plumbing

Section 22 40 00 Plumbing Fixtures

DIVISION 31 - Earthwork Section 31 11 00 Clearing & Grubbing Section 31 13 13 Tree & Plant Removal

DIVISION 32 - Exterior Improvements Section 32 12 16.13 Asphalt Paving for Pathways Section 32 13 13 Concrete Paving Section 32 18 16.13 Engineered Wood Fiber Safety Surfacing Section 32 18 16.19 Play Area Sand Surfacing Section 32 80 00 Irrigation Systems Section 32 91 13 Soil Preparation Section 32 92 19.16 Hydroseeding Section 32 93 00 Landscape Planting

DIVISION 33 - Utilities

Section 33 10 13 Potable Water Systems for Drinking Fountains

APPENDIX

A. Permits B. Play Equipment Specification Sheets C. Irrigation Record Drawings D. Arborist Report E. Drinking Fountain Water Testing Report F. DIVISION 22 – Plumbing (For Reference Only)

Section 22 00 00 Plumbing General Conditions Section 22 05 00 Common Work Results for Plumbing Section 22 07 00 Plumbing Insulation Section 22 10 05 Domestic Water Piping Section 22 11 00 Plumbing Potable Water Systems

END OF TABLE OF CONTENTS

D I V I S IO N 0 0

Bidding Requirements, Contract Forms, & Conditions of the Contract

PRE-BID INFORMATION AND ADVERTISEMENT FOR BID SECTION 00 11 13

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 1

FAS Rev July 2024

PART 1 – GENERAL

1.01 SECTION INCLUDES

A. This Section provides some preliminary information about this project to the prospective

Bidders. At the end of this section, it includes a copy of the advertisement for this project in the official newspaper.

1.02 TYPE OF CONTRACT

A. This is a Lump Sum contract.

1.03 CONTRACT TIME

A. See Section 00 52 00 – Agreement Form for number of working days.

1.04 LIQUIDATED DAMAGES

A. If the successful Contractor fails to complete Work within the time set forth, Contractor shall be charged Liquidated Damages per Section 4 of the 00 52 00 Agreement Form.

B. Additional details are specified in Paragraph 1.08.J of Section 00 72 00 – General

Conditions.

1.05 ADVERTISEMENT FOR BIDS

A. The pre-bid information arranged as it will appear in the Advertisement for Bids in the official newspaper follows:

1.06 CONTACTS

A. Prior to Bid Opening: Ray Gontarz Email: Ray.Gontarz@seattle.gov Phone Number: 206-584-7034

B. After Bid Opening, before Execution: Purchasing and Contracting Email: FAS_PW_Admin@seattle.gov Phone Number: 206-684-0444

C. After Execution: Ray Gontarz Email: Ray.Gontarz@seattle.gov Phone Number: 206-584-7034

FAS Rev July 2024

CITY OF SEATTLE

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design

Bid Opening: September 2nd, 2026 , at 2:00 PM

PW#2025-037

PROJECT LOCATION: 4920 MERIDIAN AVE N, SEATTLE, WA 98103.

PROJECT DESCRIPTION: This project will replace the play area, located in Meridian Park. Renovation includes new play equipment, accessible access to all; site furniture, landscape and updated accessible restroom. This project includes two alternates:

Alternate. 1 - Sidewalk paving and replacement in lieu of repair. Sidewalk extends from new. Accessible connection to northeast corner of Good Shepherd center will be demolished and installed as new sidewalk, rather than repaired. Alternate. 2 - EWF in combination with PIP Surfacing. A portion of the EWF Play surfacing will be replaced with Poured-in-Place surfacing and cast in place concrete slab underlay.

A/E ESTIMATE: $940,347.00; Alternate#1: $82,250.00. Alternate#2: $392,728.00.

PRE-BID SITE MEETING: There is no pre-bid site inspection meeting scheduled for this project.

INCLUSION: For purposes of the Inclusion Plan, this is considered a Playground Renovation type of project with a Past Performance of 15 % WMBE utilization rates based on completed projects. For questions on the Inclusion Plan, please contact Miguel Beltran at Miguel.Beltran@seattle.gov or 206-684-4525. Back-up contact is Carmen Kucinski at Carmen.Kucinski@seattle.gov or 206-684-0188.

PAID SICK AND SAFE TIME: Bidders must understand the requirements of SMC

14.16 and RCW 49.46 and demonstrate compliance prior to award.

QUESTIONS: Deadline for Contractor questions regarding this SPR project shall be submitted by close of business on Wednesday, AUGUST 26TH , 2026 to the SPR project manager via Ray.Gontarz@seattle.gov.

BID DOCUMENTS: Contract Documents, contacts and Bid Instructions are available at https://procurement.opengov.com/portal/seattle.

mailto:Miguel.Beltran@seattle.gov mailto:Carmen.Kucinski@seattle.gov https://www2.municode.com/library/wa/seattle/codes/municipal_code?nodeId=TIT14HURI_CH14.16PASITIPASATI https://www2.municode.com/library/wa/seattle/codes/municipal_code?nodeId=TIT14HURI_CH14.16PASITIPASATI https://apps.leg.wa.gov/rcw/default.aspx?cite=49.46 https://procurement.opengov.com/portal/seattle mailto:Miguel.Beltran@seattle.gov mailto:Carmen.Kucinski@seattle.gov https://www2.municode.com/library/wa/seattle/codes/municipal_code?nodeId=TIT14HURI_CH14.16PASITIPASATI https://www2.municode.com/library/wa/seattle/codes/municipal_code?nodeId=TIT14HURI_CH14.16PASITIPASATI https://apps.leg.wa.gov/rcw/default.aspx?cite=49.46 https://procurement.opengov.com/portal/seattle

PINSTRUCTIONS TO BIDDERS SECTION 00 21 13

PART 1 - GENERAL

1.01 BID PROCEDURES AND CONDITIONS

A. Responsible Bidder

1. For a Bidder to be considered responsible, the Bidder must meet all criteria in this section and must provide the Supplemental Bidder Responsibility Criteria form (SBRC) along with any documentation necessary for the Owner to establish that the Bidder can meet expectations and perform the Work. The documentation must demonstrate that the Bidder is experienced in performing the Work based on the firm’s completion of past work and the firm’s compliance with legal and contractual requirements. The Owner may take whatever action is necessary to establish the ability of the Bidder to perform the Work to the Owner’s satisfaction.

2. To be considered responsible, the Bidder must meet the following mandatory responsibility criteria:

a. At the time of Bid submittal, have a certificate of registration in compliance with Chapter 18.27 RCW;

b. At the time of Bid submittal, have a current State unified business identifier number;

c. If required by the business type, have industrial insurance coverage for the Bidders’ employees working in Washington as required in Title 51 RCW, an employment security department number as provided in Title 50 RCW, and a State excise tax registration number as provided in Title 82 RCW. If the Contractor has no employees, the Contractor must comply with the alternative election process and provide documentation under Title 50 and Title 51;

d. Not be disqualified from bidding on any public works contract under RCW

39.06.010 or 39.12.065 and not listed on the US Government’s System of Award Management database (http://www.sam.gov/) with an active exclusion; and

e. Prior to Notice of Intent to Award, have received training on the requirements related to public works and prevailing wage by Labor and Industries or approved training provider per RCW 39.04.350, chapter

39.12. Bidders are exempt from training if Bidder has been in business with active unified business identifier number for 3 or more years and have performed work on 3 or more public works project.

f. Meet the supplemental criteria requirements in Paragraph 1.01.B.

(Apparent low Bidder only.)

3. The apparent low Bidder, see subparagraph 1.02.A.3, must also demonstrate compliance with the following City requirements:

a. The Bidder must show substantial compliance with social equity Contract requirements on past projects or evidence to responsibly perform, including, but not limited to, compliance with the Inclusion Plan, Social Equity Plan, or Community Workforce Agreement.

FAS rev. March 9, 2026 http://www.sam.gov/ http://www.sam.gov/

INSTRUCTIONS TO BIDDERS SECTION 00 21 13

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 2

FAS rev. March 9, 2026

b. The Bidder must have a current Seattle Business License and must be current on all Business and Occupancy Taxes pursuant to SMC 5.55.030A, before Award when the Work is in the City of Seattle, the Bidder conducts business in the City of Seattle, or the Contractor owes Taxes to the City of Seattle.

c. The Bidder must not owe any monetary disincentive assessments or penalties regarding Apprentice Utilization on prior projects before Award.

d. The Bidder must be registered on the City of Seattle’s Procurement Portal, powered by OpenGov, before Award:

https://procurement.opengov.com/portal/seattle

e. Equal Benefits (SMC 20.45): Except as may be provided in the Equal Benefits Program Rules, the apparent low Bidder must submit the Equal Benefits Declaration as part of the SBRC.

f. Labor Standards (SMC 14.16,14.17,14.19,14.20): Except as may be provided in the Office of Labor Standards rules, the Apparent Low Bidder must demonstrate compliance with the City’s fair labor standards.

g. Campaign Contributions (SMC 2.04): The Bidder must not be found in violation of earning more than $250,000 in City contracts in the last fiscal year and contributed to a City elected official’s campaign.

h. The Bidder must comply with any additional requirements as a condition of state or federal funding, loans, or grants for the Work.

4. The Bidder may request that the supplemental bidder responsibility criteria be modified. Such request must be submitted to PC via the submittal methods listed on the SBRC before 5:00 p.m., 5 Business Days before the Bid Opening Date.

The request must be marked, Request to Modify Supplemental Bidder Responsibility Criteria – PW#______. If the City determines a modification is necessary, an Addendum to the Bid Documents will be issued to identify the new criteria.

5. It is the sole opinion of the Owner if the Bidder is considered responsible. If the Owner determines a Bidder to be not responsible, the Owner will provide, by email or other writing, the reasons for the determination. The Bidder may protest the determination within the time period specified in Paragraph 1.02.F by presenting additional information to the Owner. The Owner will consider the additional information before issuing its final determination. If the final determination affirms that the Bidder is not responsible, the Owner will not Execute a Contract with any other Bidder until 2 Business Days after the Bidder determined to be not responsible has been sent the final determination.

6. Additionally, the Bidder must verify the mandatory and supplemental responsibility criteria for each Subcontractor. Likewise, a Subcontractor of any tier that hires other Subcontractors must verify responsibility criteria for each.

Verification must include that each Subcontractor, during subcontract execution, (RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 3

FAS rev. March 9, 2026 meets the responsibility criteria listed in items in Paragraph 1.01.A and Paragraph 1.01.B and possesses an electrical or plumbing Contractor license, if required by Chapter 19.28 RCW, or an elevator Contractor license, if required by Chapter 70.87 RCW. This verification requirement and the responsibility criteria are included in every public works Contract and subcontract of every tier.

7. If the Bidder fails to supply documentation or falsely represents the information, the Owner may reject the Bidder as not responsible by taking the following actions:

a. Rejection of the Bidder’s Bid under Paragraph 1.01.N;

b. Revocation of the Award;

c. Termination of the Contract under Section 00 72 00 Paragraph 1.08.K;

or

d. Proceeding with debarment under Section 00 72 00 subparagraph 1.08.K.8.

B. Supplemental Bidder Responsibility Criteria Form (SBRC)

1. Submission and Evaluation of the SBRC

a. The apparent low Bidder must submit the SBRC and any additional documentation to PC within 3 Business Days of receipt of the request or as otherwise acceptable to PC. The documentation must detail the Bidder’s, or Subcontractor’s, experience with the precise experience requirements as stated in the Contract.

2. Compliance History

a. The Bidder must answer questions on the SBRC demonstrating their compliance history and capabilities in performing these categories. The Owner may use a Bidder’s past compliance history as part of the determination of responsibility.

3. Personnel

a. The Bidder certifies, by submitting the SBRC, that it will assign the named personnel to the Project. In the event it becomes necessary for the Bidder to substitute personnel during the life of the Contract, the following provisions apply:

1) Before substituting a new project manager or superintendent, the Contractor must submit for the approval of the Owner, a current resume for the new personnel documenting that the new personnel comply with the supplemental bidder responsibility criteria established for the project.

2) The Owner may suspend the project if the Contractor substitutes a project manager or superintendent without the Owner’s approval.

The Contractor is fully liable for the additional costs resulting from

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 4

FAS rev. March 9, 2026 the suspension of work and no adjustments in Contract Time resulting from the suspension of work will be allowed.

4. Work Experience

a. If specific work experience criteria are required in the Project Manual, the Bidder must document on the SBRC that it meets the specified criteria.

b. The Owner will verify that the specified work experience criteria is met by the apparent low Bidder. It is the Bidder’s responsibility to verify that the names and phone numbers provided for references are current to ensure the Owner’s ability to contact references and verify Bidder work experience. If the Owner is unable to contact references to verify Bidder or Subcontractor experience due to circumstances beyond its control, the Owner reserves the right to determine work experience based on the information available to the Owner.

c. The bidder must document on the SBRC Form that the bidder and the bidder's personnel or subcontractors have successfully completed at least two (2) projects of similar size and scope within five (5) years from project bid opening date, as defined below: Similar size shall mean:

1. Installation of play equipment

2. Play area renovations including associated landscaping (minimum 15,000 sf)

3. Concrete work for pathway accessibility improvements (minimum 5,000 sf)

4. Restroom renovation work for accessibility improvements (minimum 500 sf)

Similar scope shall mean:

1. Replacement of plumbing fixtures

2. ADA-compliant upgrades

C. Estimated Quantities

1. The quantities shown on the Bid Form are estimates and are stated for Bid comparison purposes only. The Owner does not warrant, expressly or by implication, that the actual quantities of the Work will correspond with those estimated. The Engineer may increase or decrease the amount of any Bid Item of Work or change the Work as necessary. Payment will be made on the basis of the actual quantities of each Bid Item of Work completed as specified in the Contract.

2. Subparagraph 1 above is not applicable for a lump sum contract.

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 5

FAS rev. March 9, 2026

D. Examination of Bid Documents and Project Site

1. General

a. Bid Documents are available for download at:

http://www.seattle.gov/purchasing-and-contracting/construction-contracting

b. The Bidder is responsible for examining the Bid Documents. Submittal of a Bid is evidence that the Bidder has made these examinations and understands all requirements of the Bid process and for the performance of the Work. By submitting a Bid, the Bidder further warrants, agrees, and acknowledges that they:

1) Have taken all steps necessary to ascertain the full scope, nature and location of the Work.

2) Have investigated and are satisfied as to the general and local conditions that can affect the Work and its cost, including but not limited to:

a. Conditions bearing on acquisition, transportation, disposal, handling, and storage of materials;

b. Availability of labor, materials, water, electric power, and roads;

c. Uncertainties of weather, river stages, tides, or similar physical conditions at the Project Site;

d. Conformation and condition of the ground;

e. The equipment and facilities needed preliminary to and during Work; and

f. Site and environmental conditions which by statute, law, or regulation require specific training and certifications for employees;

3) Are satisfied as to the character, quality, and quantity of surface and subsurface information or obstacles that may be encountered insofar as this information can reasonably be ascertained from an inspection of the Project Site, including Materials sites, as well as from the Bid Documents and other information made a part of this Contract.

4) Are satisfied that adequate time has been allowed for Physical Completion of the project.

5) Take responsibility for properly estimating the difficulty and cost of performing the Work.

http://www.seattle.gov/purchasing-and-contracting/construction-contracting http://www.seattle.gov/purchasing-and-contracting/construction-contracting http://www.seattle.gov/purchasing-and-contracting/construction-contracting

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 6

FAS rev. March 9, 2026

6) Are familiar with and will comply with all federal, state, and local laws, ordinances; and regulations that might affect the Work or those engaged in the Work. The Bidder is not relieved of this obligation because of the Bidder’s misunderstanding or ignorance of such requirements.

7) Are satisfied that their Bid Item prices reflect their cost for completing the Work, including Materials, labor, equipment and costs including insurance and bonding.

c. The Bidder has a responsibility to ask about any perceived defect or ambiguity in the Bid Documents. Bidders who need an explanation or clarification of the Bid Documents must make this request in writing before 5:00 p.m. on that Wednesday preceding the Bid opening. A claim will not be allowed if a Bidder failed to request clarification or if a reasonably prudent contractor would have discovered such defects or ambiguities while preparing their Bid.

2. Subsurface Information

a. If the Engineer has made a subsurface investigation of the Project Site of the proposed Work, the boring log data, soil sample test data, and geotechnical reports accumulated by the Engineer will be provided for inspection by the Bidders. The boring logs are part of the Contract.

However, the Engineer makes no representation, guaranty, or warranty, expressed or implied, that:

1) The Bidder’s interpretation from the boring logs or geotechnical reports is correct;

2) Moisture conditions and indicated water tables do not vary from those found at the time the borings were made;

3) The ground at the location of the borings has not been physically disturbed or altered after the boring was made; and

4) The conditions, materials, or proportions of the materials is consistent between the specific borings.

b. In addition to the above data, SDCI has geotechnical reports for private property located in an Environmentally Critical Area Geographically Hazardous zone if the private property has been under SDCI permit review. This data is available for the Contractor’s review at:

SDCI

Soils Reports 700 Fifth Avenue 22nd Floor Seattle, WA 98104

(206) 684-8950

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 7

FAS rev. March 9, 2026

c. The availability of subsurface information from the Engineer does not relieve the Bidder or the Contractor of any responsibility to make examinations and investigations as required by subparagraph 1.01.D.1 and any other responsibility under the Contract, or as may be required by law.

E. Form and Style of Bid

1. A Bid must only be submitted on the Bid Form provided on OpenGov. A price must be submitted for each Bid Item listed.

2. The Bidder must not make a stipulation on the Bid Forms or qualify the Bid in any manner. A Bid amount must be included for every bid item listed in the Bid Form.

A person authorized to legally bind the Bidder must provide an Electronic Signature on the Declaration page.

F. Addenda

1. If the Engineer determines modifications or clarifications to the Bid Documents are required before the Bid Opening Date, they will be provided by Addendum.

Oral explanations, interpretations, or instructions are not binding on the Owner.

Only modifications or clarifications issued by a written Addendum are binding.

Notifications of Addenda and other project information will only be sent to official plan holders who downloaded or ordered documents through the City’s official electronic Bid solicitation website, including plan centers that obtained documents through the website. A link to the current electronic Bid solicitation website is found at http://www.Seattle.gov/purchasing-and-contracting/construction-contracting . All Bidders are encouraged to check the electronic Bid solicitation website for Addenda at least 24 hours before Bid Opening.

2. The Bidder must acknowledge receipt of each Addendum by checking the appropriate boxes on OpenGov.

G. Bid Guaranty

1. A Bid Guaranty must be equal to 5 percent of the maximum Bid amount that could be awarded based on the Bidder’s Bid, including Base Bid, sales tax, Alternates, Additives, and Deductives, if applicable. A Bid will not be accepted or considered unless accompanied by a Bid Guaranty with power of attorney.

2. A Bid must be accompanied by a Bid Guaranty in the form of:

a. A certified or cashier’s check payable to The City of Seattle; or

b. A Bid bond on the form issued by the Surety and accompanied by power of attorney.

http://www.seattle.gov/purchasing-and-contracting/construction-contracting http://www.seattle.gov/purchasing-and-contracting/construction-contracting

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 8

FAS rev. March 9, 2026

3. Bid bonds must be issued by a Surety company that is authorized to do business in the State of Washington and appears on the current list of authorized insurance companies published by the Office of the Washington State Insurance Commissioner.

4. Bid bonds must be original and contain the following:

a. Project name and public works number (PW#);

b. The City of Seattle named as oblige;

c. The amount of the Bid bond stated as 5 percent of the maximum Bid amount that could be awarded (including sales tax);

d. The signature and title of the Bidder’s officer who is legally authorized to bind the Bidder; and

e. The signature of the Surety’s officer empowered to sign the bond and the power of attorney.

5. A Bid Guaranty must accompany all Bids. Bidders must upload a scanned copy of the wet signed and notarized Bid Guaranty through OpenGov as a PDF file.

The Bidder must mail Bid Guaranty originals with a no later than one (1) Business Day following the Bid Opening Date. PC will not accept Electronic Signatures or electronic notarizations on the Bid Guaranty originals. Mail original Bid Guaranty documents to:

FAS – Purchasing and Contracting City of Seattle P.O. Box 94687 Seattle, WA 98124-4687

6. A Bid may be declared non-responsive if a Bidder submitting an electronic Bid fails to mail a hard copy original of the Bid Guaranty with the required USPS postmark.

H. Noncollusion Requirement

1. The Bidder declares by signing the Declaration that they have not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free, competitive bidding in the preparation and submission of its Bid. The Bidder and other potential Bidders or participants in collusion may be declared not responsible under Paragraph 1.01.A and may be debarred under SMC Chapter 20.70.

I. Bid Submittal

1. General

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 9

FAS rev. March 9, 2026

a. The Bid must be submitted through OpenGov by the time and date specified in the Advertisement for Bids or as modified by Addenda. The Bid, together with the Bid Guaranty and any other required documents, due at the Bid submittal deadline, must be submitted through OpenGov.

Any required documents that are due after the Bid submittal deadline must be emailed as a PDF file(s) to FAS_PWSecureBid@seattle.gov by the appropriate deadline; OpenGov cannot accept submittals after the Bid submittal deadline.

b. PC designates the official Bid clock. The Bidder is responsible for the timely submittal of the Bid. A Bid submitted or received after the Bid submittal deadline will not be accepted, unless determined by the Owner that the lateness was outside of the Bidder’s control and that there is no bidding advantage to accepting a late Bid.

c. Bidders must submit Bids electronically through OpenGov by the Bid submittal deadline. PC will accept Electronic Signature for the Declaration and the Bidder/Subcontractor List, if applicable.

1) Email additional required documents, that are due after the Bid submittal deadline as a PDF file(s) with a maximum individual file size of 15MB. Email additional required documents to the following address by the appropriate deadline.

FAS_PWSecureBid@seattle.gov. Identify both the email and the attached PDF file(s) with the full Public Works Contract Number (PW#) and name of the Bidder (e.g. “PW#2020-001 – Joe Construction”).

a) Bids must be entered and submitted by 2:00 PM through

OpenGov on the Bid Opening Date. OpenGov will not allow any Bid submission after the 2:00PM Bid submittal deadline.

Any required documents that are due after the 2:00PM deadline must be submitted by email as a PDF file(s) to FAS_PWSecureBid@seattle.gov.

d. The Email Time Stamp constitutes the official time for electronic submittal receipt for required documents that are due after the Bid submittal deadline and are submitted by email.

e. If mandatory pre-bid meeting were required as part of the Bid’s solicitation, the Bidder’s company must be represented on the pre-bid meeting sign-in sheet, or the Bid will not be accepted.

f. If the Bidder/Subcontractor List is required, it must be included with the

Bid Forms as described in RCW 39.30.060.

2. Change of Bid Submittal Date mailto:FAS_PWSecureBid@seattle.gov mailto:FAS_PWSecureBid@seattle.gov mailto:FAS_PWSecureBid@seattle.gov mailto:FAS_PWSecureBid@seattle.gov mailto:FAS_PWSecureBid@seattle.gov

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 10

FAS rev. March 9, 2026

a. The Owner may change the date and time for Bid submittal. Notification of the change will be by Addendum.

3. Bidder/Subcontractor List

a. In compliance with RCW 39.30.060 for all projects estimated to cost $1,000,000 or more, all Bidders must complete and submit the Bidder/Subcontractor List, Section 00 41 00, Attachment B. The completed Bidder/Subcontractor list must identify the Subcontractors that the Bidder will contract with for HVAC, plumbing, electrical, structural steel, or rebar installation work; or indicate that the Bidder intends to self-perform the work, if awarded the Contract; or that category of work is not applicable. The Bidder/Subcontractor List must be submitted with the Bid Forms. The Bidder is responsible for the timely delivery of the Bidder/Subcontractor List.

b. For purpose of evaluating the Bidder/Subcontractor list, and notwithstanding any interpretations therein or in the Contract to the contrary, the Owner has determined that the project includes the following trades: (N/A) Accordingly, Bidder must name a Subcontractor(s) licensed to perform the category of work per the instructions in the Bidder/Subcontractor List. If the Bidder is licensed to perform the category of work, Bidder may self-perform per the instructions in the Bidder/Subcontractor List. Failure to name a Subcontractor(s) or name itself to perform the category of work may render the Bidder’s Bid non-responsive and rejected.

c. The Bidder may list no more than 1 Subcontractor for each category of work, unless Subcontractors vary with Bid Alternates, Additives, or Deductives, in which case the Bidder must indicate on a separate Bidder/Subcontractor List which Subcontractor will be used for which Alternate, Additive, or Deductive. If the HVAC, plumbing, electrical, structural steel, or rebar installation specialty is left blank (meaning either the name of a Subcontractor is blank, or a checkbox is not checked) the City will accept the blank as self-performance. The Bidder is bound to self-performance of that specialty for the duration of the Project.

d. The Bid will be rejected as non-responsive if the Bidder/Subcontractor list is not provided. The Bidder/Subcontractor List must be submitted with the Bid Forms per RCW 39.30.060. If awarded the Contract, the Bidder agrees to use the Subcontractors identified on the Bidder/ Subcontractor List unless the City agrees to a substitution.

4. Inclusion Plan

a. For all public works projects having an Engineer’s Estimate of $300,000 or more, unless waived by PC, all Bidders must complete and submit the Inclusion Plan, Section 00 41 00, Attachment A with the Bid. A Bid will be rejected as non-responsive for failure to submit a completed Inclusion

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 11

FAS rev. March 9, 2026

Plan. The Bidder’s completed Inclusion Plan will be given points to determine responsiveness, as directed on the Inclusion Plan.

b. For the Inclusion Plan, this is considered a Playground Renovation type of project with a Past Performance of 15% WMBE utilization rates based on completed projects.

J. Modification or Withdrawal of Bid

1. After submitting a Bid, but prior to the Bid submittal deadline, a Bidder may either

(1) withdraw or (2) revise its Bid through OpenGov.

K. Alternate, Additive, Deductive

1. The Owner reserves the right to arrange the Bid Form with Alternate, Additive, and/or Deductive items in any order. The Bidder must bid on all Alternates, Additives, and Deductives in the Bid Form.

L. Public Opening of Bids

1. Bid Reading:

a. Bids submitted through OpenGov will be opened and read aloud via Microsoft Teams following the 2:00 p.m. Bid submittal deadline specified in the Advertisement for Bids or in an Addendum. There is no in-person Bid opening.

b. Microsoft Teams call-in information is as follows:

1. Phone number to connect:

a. 1-206-686-8357 (Seattle) or (United States)

2. Meeting Number Access Code: 190 706 876#

M. Irregular Bids

1. The Owner has the right to review Bids for material irregularities. If the Owner determines a Bid to be irregular and rejects it, notification will be sent to the Bidder in writing containing the reason for the determination. A Bid will be considered irregular and non-responsive if:

a. The authorized Bid Forms are not used;

b. The completed Bid Forms contains any unauthorized additions, deletions, alternate Bids, or conditions;

c. The Bidder did not Bid on all Alternates, Additives, or Deductives, when required;

d. The Bid Guaranty is not included with the Bid;

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 12

FAS rev. March 9, 2026

e. For projects estimated to cost $1,000,000 or more, the Bidder did not comply with the Bidder/Subcontractor list requirements, see subparagraph 1.01.I.3 of this Section and Attachment B to Section 00 41 00 – Bid Forms, Bidder/Subcontractor List;

f. The Bid does not constitute a definite and unqualified offer to comply with the material terms of the Bid invitation;

g. The Inclusion Plan is not submitted with the Bid when required; or

h. The Inclusion Plan does not receive the minimum score as identified in the plan to be considered responsive when submitted with the Bid when required.

2. A Bid may be considered irregular and non-responsive if:

a. The Bid Guaranty is not complete or not sufficient.

b. Any of the Bid Item prices are excessively above or below the amount of a reasonable Bid, to the potential detriment of the Owner; or

c. A lump sum Bid is excessively lower than other Bids.

d. Receipt of Addenda is not acknowledged.

e. The Bidder is a member of a joint venture or partnership, and the joint venture or partnership submits a Bid for the same project. In such an instance, both Bids may be rejected.

f. The Bid is not properly Executed.

g. Proof of license for named subcontractors (if applicable) is not provided per RCW 39.30.60

N. Disqualifications of Bidders

1. A Bidder will be deemed not responsible, and its Bid rejected if:

a. The Bidder does not meet the mandatory responsibility criteria in RCW 39.04.350(1) as amended and as specified in Paragraph 1.01.A;

b. The Bidder (apparent low Bidder only) does not meet the Supplemental Bidder Responsibility Criteria as specified in Paragraphs 1.01.A and 1.01.B, did not provide the completed and signed SBRC or required documentation to evaluate the Bidder qualifications, or fails to disclose or submits false or misleading information on the SBRC or in the attached documentation;

c. Evidence of collusion exists with any other Bidder or potential Bidder; or

d. The Bidder failed to attend a mandatory pre-bid conference, if applicable.

2. A Bidder may be deemed not responsible and its Bid rejected if:

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 13

FAS rev. March 9, 2026

a. More than 1 Bid is submitted for the same project from a Bidder under the same or different names;

b. An unsatisfactory performance record exists as shown by past or current Work for the Owner, or for others, as judged from the standpoint of the conduct of the Work, environmental or safety compliance records, workmanship, progress, social equity, Community Workforce Agreement, or equal employment opportunity practices; or termination for cause;

c. The Bidder has failed to settle bills for labor or Materials on past or current contracts;

d. The Bidder has failed to complete a public contract;

e. The Bidder has been convicted of a crime arising from a previous public contract;

f. The Bidder is unable, financially, or otherwise, to perform the Work; or

g. For any other reason deemed proper by the Owner.

3. The Owner will notify the Bidder by email or by other writing if the Bidder is determined to be not responsible under this Section.

1.02 AWARD OF CONTRACT

A. Consideration of Bids

1. Bid Tabulation

a. General

1) If a minimum Bid amount has been established for any item and the Bidder’s unit or lump sum price is less than the minimum specified amount, the Owner will revise the unit or lump sum price, to the minimum specified amount and recalculate the extension and/or the total Bid price.

b. Reciprocal Preference For Resident Contractors

1) Per RCW 39.04.380, a Bid which is received from a nonresident Contractor from a state that provides a percentage bidding preference, a comparable percentage disadvantage must be applied to the Bid of that non-resident Contractor. The comparable percentage disadvantage will be per the Contractor’s resident state. A non-resident Contractor will be one who, at the time of Bid, does not have an office located in the State of Washington.

The resident state is the state in which the Contractor was incorporated or where the Contractor’s business entity was formed.

2) For the purpose of determining the apparent low Bidder, the Owner will multiply the non-resident Contractor’s Bid amount by the comparable percentage disadvantage (CPD). The Bid amount is the total of the Base Bid and all selected Alternates, Additives, or Deductives to be awarded. The Owner will add the product of the CPD percentage and the Bid amount to the nonresident

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 14

FAS rev. March 9, 2026

Contractor’s Bid amount, which determines the nonresident disadvantaged total Bid pertaining to the nonresident Contractor to be used for comparison of competing bids. The nonresident disadvantage total will be compared to the resident Contractor’s Bid amount. The calculated lowest total is the lowest Bid.

c. Identical Bid Totals

1) If two or more responsive Bids are exactly equal, in order to establish the apparent low Bidder, the winning Bid will be determined by random draw among the equal Bids.

2. Claim Of Error and Relief of Award

a. A Bidder who wishes to claim error or miscalculation of their Bid and would like to withdraw their Bid after the Bids have been opened, must submit a signed statement, accompanied by copies of the worksheets used in the Bid preparation, requesting to withdraw. The statement must describe the error, or circumstance, and certify that the worksheets are copies of originals used in the preparation of the Bid. The statement and the worksheets must be submitted to: Purchasing and Contracting, City of Seattle, Department of Finance and Administrative Services, 700 Fifth Avenue, Suite 4350, Seattle Municipal Tower, Seattle, WA 98104-5008, or by email to FAS_PW_Admin@Seattle.gov by 5:00 p.m. the next Business Day or as acceptable to the Owner.

b. The Owner will determine the validity of the claim of error. If the Owner concurs, the Bidder will be relieved of responsibility of Award, the Bid will be withdrawn, and the Bid Guaranty will be returned. Thereafter, at the discretion of the Owner, all Bids may be rejected, or Award made to the responsible Bidder with the next lowest responsive Bid. A low Bidder who claims error is prohibited from bidding on the same project if the project is re-bid.

3. Declaration of the Apparent Low Bidder

a. The Owner will evaluate all Bids to determine the apparent low Bidder. The apparent low Bidder is the Bidder meeting the mandatory bidder responsibility criteria and offering the lowest responsive Bid.

b. The lowest Bid will be determined by the sum of the Base Bid, with Bid Item price extensions corrected where necessary, plus any Alternates, Additives, and/or Deductives that the Owner decides to include in the Contract Price. Alternates, Additives, and/or Deductives may be selected in any order that the Owner determines to be within available funds.

c. The Owner will determine if the Bidder providing the lowest Bid meets the mandatory responsibility criteria specified in Paragraph 1.01.A.

d. Once the Owner has determined the apparent low Bidder, all Bidders will be notified through the City’s on-line bidding website.

mailto:FAS_PW_Admin@Seattle.gov

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 15

FAS rev. March 9, 2026

4. Pre Award Information and Rights of the Owner

a. The apparent low Bidder must submit the SBRC described in Paragraph 1.01.B for Owner evaluation. The Owner will also evaluate if the supplemental responsibility criteria in Paragraph 1.01.A are met. In addition, the apparent low Bidder under consideration for Award may be required to furnish:

1) A complete statement as to the origin, composition, and manufacture of any and all Materials to be used in the project, together with samples which may in turn be subjected to tests to determine their quality and fitness for the Work, as provided for in the Contract.

2) A critical path schedule in the form required by the Engineer showing the order of the Work and the time required on the various phases of the Work.

3) A breakdown of costs assigned to any Bid Item or a schedule of values for lump sum Bids.

4) Any additional information requested by the Owner to understand the Bid price or ascertain the Bidder’s general ability to perform the Work.

5) A Social Equity Plan.

b. In addition to such other rights as may be reserved elsewhere in the Contract, the Owner reserves the right to:

1) Reject any or all Bids at the Owner’s discretion;

2) Re-advertise for Bids;

3) Waive informalities or immaterial irregularities in the Bidding and Award processes;

4) Accept the lowest responsive Bid of a responsible Bidder;

5) Correct arithmetical errors in a Bid;

6) Cancel the Work; and

7) Award such Alternate, Additive, or Deductive, as may be set forth in the Bid Forms in the order most advantageous to the Owner.

B. Award of Contract

1. After the Owner has determined that the apparent low Bidder has met all of the mandatory and supplemental bidder responsibility criteria, the Owner will provide

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 16

FAS rev. March 9, 2026

Notice of Intent to Award to all Bidders through the City’s official Bid solicitation website.

2. The Owner will endeavor to Award the Contract within 60 Days after the Bid Opening Date. If the Contract is not awarded within that 60 Day period, a Bidder may withdraw their Bid in writing at any time on or after the 60 Days. All Bids will otherwise continue to be eligible for consideration until the Award of the Contract.

C. Required Documents to Establish the Execution Date

1. General

a. Within 10 Business Days of issuing the Notice of Intent to Award, unless extended by mutual agreement, the apparent low Bidder must submit to PC: proof of insurance, fully executed original Payment and Performance Bond, Retainage Bond if applicable, and the original signed Agreement Form. The apparent low Bidder must also submit the Social Equity Plan as specified in subparagraph 1.02.C.5.

2. Evidence of Insurance

a. The apparent low Bidder must submit to PC the evidence of insurance as required in Section 00 73 16. E-mail delivery is acceptable to FAS_PW_Admin@Seattle.gov.

3. Payment and Performance Bond

a. The apparent low Bidder must provide to PC an original, executed Payment and Performance Bond for the awarded Contract Price. The Payment and Performance Bond must:

1) Be on a form furnished by the Owner;

2) Be signed by the principal and notarized;

3) Be signed and notarized by an approved Surety or Sureties that:

a) Is registered with the Washington State Insurance Commissioner;

b) Appears on the current Authorized Insurance List in the State of Washington published by the Office of the Insurance Commissioner;

c) Has a current rating of at least A-VII in A.M. Best’s Key Rating Guide or is included in the U.S. Department of the Treasury’s Listing of Approved Sureties (Circular 570); and

4) Be accompanied by an original power of attorney document with the same date as the notarization by the Surety.

b. The Owner may require the Surety or Sureties named on the Payment and Performance Bond to appear and qualify itself. Whenever the Owner determines the security to be inadequate, the Owner may require in writing that the Contractor furnish additional security to cover any

(RE-BID) Meridian Play Area Renovation and ADA Meridian RR Design Page 17

FAS rev. March 9, 2026 remaining Work. No payments will be made until the added security is furnished.

4. Agreement Form

a. The apparent low Bidder must submit to PC the original Agreement Form signed by a person authorized to bind the Bidder’s business based on the business entity and/or Governing Persons listed on the Washington State Secretary of State website.

b. After the Owner has countersigned the Agreement Form, establishing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .