This document is a Bid Abstract for the PW1663-25 Invitation to Bid (ITB) issued by Marion County, Oregon for the Nusom Road: Pudding River Bridge Approach construction project. The bid solicitation covers a comprehensive road infrastructure improvement project, with detailed line items for mobilization, traffic management, erosion control, bridge removal, structure excavation, concrete work, pavement installation, and landscaping. The bid includes 29 distinct line items covering various construction activities, with quantities specified for each item such as temporary signs (300 units), flaggers (80 hours), and aggregate base (360 tons). Five contractors submitted bids: HP Civil Inc, Farline Bridge, Roy Houck Construction LLC, Legacy Contracting Inc, and Oregon State Bridge Construction Inc, with total bid prices ranging from $264,085.55 to $425,195.00.
The bid abstract reveals significant price variations across line items among bidders, with notable differences in categories like bridge removal work (ranging from $6,500 to $60,000) and reinforced concrete bridge end panels (prices varying from $87 to $50,025). The procurement appears to be a standard public works infrastructure project without explicit set-aside designations or disadvantaged enterprise requirements. Bidders were required to submit proposals through Marion County's Procurement Collaboration Portal, with key submission deadlines in April 2025. The project encompasses comprehensive bridge approach reconstruction, suggesting a complex civil engineering undertaking that requires specialized construction expertise in road and bridge infrastructure rehabilitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Abstract_2025_04_25 (1)
| Bid Abstract - PW1663-25 ITB - Nusom Rd: Pudding River Bridge Approach | ||||||||||||||
| HP CIVIL INC | FARLINE BRIDGE | ROY HOUCK CONSTRUCTION LLC | LEGACY CONTRACTING INC | OREGON STATE BRIDGE CONSTRUCTION INC | ||||||||||
| Line | Number | Description | Unit | Quantity | Price | Total | Price | Total | Price | Total | Price | Total | Price | Total |
| 1 | 0210-0100 | MOBILIZATION | LS (Lump Sum) | 1 | $26,408.55 | $26,408.55 | $27,000.00 | $27,000.00 | $40,000.00 | $40,000.00 | $42,150.00 | $42,150.00 | $42,500.00 | $42,500.00 |
| 2 | 0225-0050 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | LS (Lump Sum) | 1 | $27,500.00 | $27,500.00 | $8,500.00 | $8,500.00 | $16,000.00 | $16,000.00 | $13,980.00 | $13,980.00 | $10,000.00 | $10,000.00 |
| 3 | 0225-0075 | TEMPORARY SIGNS | LS (Lump Sum) | 300 | $10.00 | $3,000.00 | $36.00 | $10,800.00 | $42.00 | $12,600.00 | $38.50 | $11,550.00 | $36.00 | $10,800.00 |
| 4 | 0225-0114 | TEMPORARY BARRICADES, TYPE III | EA (Each) | 8 | $150.00 | $1,200.00 | $200.00 | $1,600.00 | $230.00 | $1,840.00 | $325.00 | $2,600.00 | $200.00 | $1,600.00 |
| 5 | 0225-0210 | TEMPORARY PLASTIC DRUMS | EA (Each) | 40 | $30.00 | $1,200.00 | $45.00 | $1,800.00 | $55.00 | $2,200.00 | $55.00 | $2,200.00 | $45.00 | $1,800.00 |
| 6 | 0225-0450 | PORTABLE CHANGEABLE MESSAGE SIGNS | EA (Each) | 2 | $1,500.00 | $3,000.00 | $5,000.00 | $10,000.00 | $3,250.00 | $6,500.00 | $2,850.00 | $5,700.00 | $15,000.00 | $30,000.00 |
| 7 | 0225-0490 | FLAGGERS | HR (Hour) | 80 | $55.00 | $4,400.00 | $65.00 | $5,200.00 | $75.00 | $6,000.00 | $72.00 | $5,760.00 | $1.00 | $80.00 |
| 8 | 0280-0100 | EROSION CONTROL | LS (Lump Sum) | 1 | $1,500.00 | $1,500.00 | $2,500.00 | $2,500.00 | $2,000.00 | $2,000.00 | $2,800.00 | $2,800.00 | $10,000.00 | $10,000.00 |
| 9 | 0280-0192 | INLET FILTER INSERTS, TYPE 3 | EA (Each) | 2 | $200.00 | $400.00 | $150.00 | $300.00 | $175.00 | $350.00 | $89.00 | $178.00 | $250.00 | $500.00 |
| 10 | 0280-0255 | CONCRETE WASHOUT FACILITY | EA (Each) | 1 | $1,500.00 | $1,500.00 | $500.00 | $500.00 | $1,000.00 | $1,000.00 | $2,800.00 | $2,800.00 | $2,000.00 | $2,000.00 |
| 11 | 0280-0322 | SEDIMENT BARRIER, TYPE 3 | FT (Foot) | 440 | $6.00 | $2,640.00 | $5.00 | $2,200.00 | $6.00 | $2,640.00 | $5.25 | $2,310.00 | $6.00 | $2,640.00 |
| 12 | 0290-0100 | POLLUTION CONTROL PLAN | LS (Lump Sum) | 1 | $100.00 | $100.00 | $500.00 | $500.00 | $1,500.00 | $1,500.00 | $1,950.00 | $1,950.00 | $1,000.00 | $1,000.00 |
| 13 | 0305-0100 | CONSTRUCTION SURVEY WORK | LS (Lump Sum) | 1 | $5,000.00 | $5,000.00 | $6,200.00 | $6,200.00 | $7,000.00 | $7,000.00 | $9,500.00 | $9,500.00 | $5,000.00 | $5,000.00 |
| 14 | 0310-0100 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | LS (Lump Sum) | 1 | $67,500.00 | $67,500.00 | $5,700.00 | $5,700.00 | $5,000.00 | $5,000.00 | $9,300.00 | $9,300.00 | $11,500.00 | $11,500.00 |
| 15 | 0320-0100 | CLEARING AND GRUBBING | LS (Lump Sum) | 1 | $1,000.00 | $1,000.00 | $10,000.00 | $10,000.00 | $7,500.00 | $7,500.00 | $8,750.00 | $8,750.00 | $16,500.00 | $16,500.00 |
| 16 | 0501-0100 | BRIDGE REMOVAL WORK | LS (Lump Sum) | 1 | $10,000.00 | $10,000.00 | $34,500.00 | $34,500.00 | $6,500.00 | $6,500.00 | $26,335.00 | $26,335.00 | $60,000.00 | $60,000.00 |
| 17 | 0510-0250 | STRUCTURE EXCAVATION | LS (Lump Sum) | 1 | $1,500.00 | $1,500.00 | $1,840.00 | $1,840.00 | $6,500.00 | $6,500.00 | $8,900.00 | $8,900.00 | $15,000.00 | $15,000.00 |
| 18 | 0510-0750 | GRANULAR STRUCTURE BACKFILL | LS (Lump Sum) | 1 | $500.00 | $500.00 | $1,350.00 | $1,350.00 | $5,500.00 | $5,500.00 | $9,800.00 | $9,800.00 | $10,000.00 | $10,000.00 |
| 19 | 0530-0100 | REINFORCEMENT | LS (Lump Sum) | 1 | $21,400.00 | $21,400.00 | $15,000.00 | $15,000.00 | $19,000.00 | $19,000.00 | $18,235.00 | $18,235.00 | $35,000.00 | $35,000.00 |
| 20 | 0542-0110 | CONCRETE REPAIR | SY (Square Yard) | 8 | $500.00 | $4,000.00 | $250.00 | $2,000.00 | $750.00 | $6,000.00 | $875.00 | $7,000.00 | $500.00 | $4,000.00 |
| 21 | 0545-0100 | REINFORCED CONCRETE BRIDGE END PANELS | SY (Square Yard) | 87 | $1.00 | $87.00 | $550.00 | $47,850.00 | $435.00 | $37,845.00 | $485.00 | $42,195.00 | $575.00 | $50,025.00 |
| 22 | 0585-0100 | ASPHALTIC PLUG JOINT SEALS | LS (Lump Sum) | 1 | $8,000.00 | $8,000.00 | $10,500.00 | $10,500.00 | $12,275.00 | $12,275.00 | $19,365.00 | $19,365.00 | $15,000.00 | $15,000.00 |
| 23 | 0585-0220 | POURED JOINT SEAL | LS (Lump Sum) | 1 | $1,750.00 | $1,750.00 | $2,150.00 | $2,150.00 | $2,500.00 | $2,500.00 | $7,600.00 | $7,600.00 | $5,000.00 | $5,000.00 |
| 24 | 0640-0100 | AGGREGATE BASE | TN (Ton) | 360 | $20.00 | $7,200.00 | $34.00 | $12,240.00 | $60.00 | $21,600.00 | $58.50 | $21,060.00 | $54.50 | $19,620.00 |
| 25 | 0740-0120 | COMMERCIAL ASPHALT CONCRETE PAVEMENT, 1/2" DENSE | TN (Ton) | 225 | $150.00 | $33,750.00 | $124.05 | $27,911.25 | $136.00 | $30,600.00 | $125.50 | $28,237.50 | $160.00 | $36,000.00 |
| 26 | 0810-0100 | GUARD RAIL, TYPE 2A | FT (Foot) | 50 | $35.00 | $1,750.00 | $39.44 | $1,972.00 | $41.00 | $2,050.00 | $39.50 | $1,975.00 | $35.00 | $1,750.00 |
| 27 | 0810-0250 | GUARDRAIL TRANSITION | EA (Each) | 4 | $3,200.00 | $12,800.00 | $3,006.53 | $12,026.12 | $3,650.00 | $14,600.00 | $4,300.00 | $17,200.00 | $3,130.00 | $12,520.00 |
| 28 | 0810-0370 | GUARDRAIL TERMINALS, NON-FLARED, TEST LEVEL 3 | EA (Each) | 4 | $3,500.00 | $14,000.00 | $3,300.15 | $13,200.60 | $4,000.00 | $16,000.00 | $3,750.00 | $15,000.00 | $3,415.00 | $13,660.00 |
| 29 | 1030-0227 | NATIVE PLANT SEEDING | AC (Acre) | 0.1 | $10,000.00 | $1,000.00 | $17,000.00 | $1,700.00 | $20,000.00 | $2,000.00 | $41,000.00 | $4,100.00 | $17,000.00 | $1,700.00 |
| $264,085.55 | $277,039.97 | $295,100.00 | $348,530.50 | $425,195.00 |