Pump Specs.pdf
PDF 591 KB Posted
- Attached to
- FCC HAZELTON - WATER HEATING SYSTEM PRODUCT ONLY
- Solicitation number
- 15B12124Q00000016
About this file
This document is a technical specifications sheet for the required pumps associated with a federal contract opportunity. The solicitation is for the FCC Hazelton facility, which requires a total of 9 indirect plate and frame water heaters along with 9 accompanying pumps. Key product specifications for the pumps are provided, including flow rate, head, efficiency, liquid type, temperature range, and motor data. The solicitation also includes detailed requirements for the indirect water heaters, such as dimensions, weight, materials, features, and performance parameters. Vendors must have an active SAM.gov registration and provide their UEI. Quotes must be submitted by April 29, 2024 at 2 PM EDT and be valid for at least 30 days. This is a product-only requirement, with no services included.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HW tank Specs.pdf | ||
| Specs qty 9.pdf | ||
| 15B12124Q00000016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXAMPLE OF REQUIRED PUMP - Total of 9 required
File details come from the government source that posted it. Updated .