Pump and Filter System for Training Tank Project Manual.pdf

PDF 3 MB Posted

Attached to
M-02-27 Pump and Filter System for Training Tank
Solicitation number
BD-27-1381-BCC01-BCCFR-131655
Issued by
Bristol County, New Bedford City, Massachusetts

About this file

This is a Project Manual and bidding document for Bristol Community College, the Awarding Authority, soliciting sealed bids for furnishing and installing a third pool pump and filter system for an existing 54,000-gallon above-ground training tank at the Workforce Training Center in New Bedford, Massachusetts (Project No. M-2-27). The work consists of a single scope involving pump and filtration equipment installation. A mandatory pre-bid conference and site visit is scheduled for July 24, 2026, at 8:00 AM EDT at 198 Herman Melville Blvd., New Bedford, MA 02740. Requests for Information (RFIs) must be submitted online by July 31, 2026, at 12:00 PM EDT. General bids will be received electronically at www.biddocs.com until August 5, 2026, at 2:00 PM EDT and publicly opened online immediately thereafter. Contract award is anticipated within thirty days of bid opening, subject to approval by the Awarding Authority's authorized signatory. The contract term will commence upon issuance of a written Notice to Proceed, with substantial completion required within a timeframe to be specified in the executed agreement.

The project is advertised under Massachusetts General Law Chapter 149, Section 44A-J for a $50,000 to $150,000 contract, with an estimated cost of $73,000. A bid deposit of five percent (5%) of the greatest possible bid amount is required, payable to Bristol Community College, in the form of cash, certified check, or bid bond issued by a surety company licensed in Massachusetts. All bids must acknowledge addenda and comply with Massachusetts minimum wage rates per M.G.L. c.149 §26-27H. Contractors must demonstrate workforce participation benchmarks of 6.9% for women and 15.3% for minorities as statutory requirements. Bidders are required to submit five similar projects completed within the past five years, certificates of compliance with state tax and unemployment laws, noncollusion affidavits, and equal employment opportunity certifications. Upon award, the selected general contractor must provide performance and payment bonds each in the amount of the contract sum and submit insurance certificates. This is an electronic bidding process; hard copy bids will not be accepted.

View the file

Other files

File Type Posted
Addendum 1~2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v1.0-20221001 MGL c.149 $50K to $150K

PROJECT MANUAL

MGL c.149 $50K to $150K

Pump and Filter System for Training Tank

Workforce Training Center 198 Herman Melville Blvd., New Bedford, MA 02740

Project No. M-2-27

PREPARED FOR

Awarding Authority Bristol Community College

777 Elsbree Street Fall River, MA 02720

Prime Designer Bristol Community College

777 Elsbree Street F101

Fall River, MA 02720 Phone: 774-357-2448

DATE: 22 July 2026

07/22/2026 G en er at ed

B y

B id

D oc s:

7/

/2 at

:0

0A M

E D

T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

E

DT

THIS PAGE INTENTIONALLY LEFT BLANK

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

Section 00 01 05

LIST OF CONSULTANTS

Pump and Filter System for Training Tank Project No. M-2-27

AWARDING AUTHORITY

Bristol Community College 777 Elsbree Street Fall River, MA 02720

PRIME DESIGNER

Bristol Community College 777 Elsbree Street F101 Fall River, MA 02720 Phone: 774-357-2448

END OF SECTION

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 01 05 - 1 List of Consultants

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

M

PI

LE

D O N 0

7/

/2 at

0:

AM

PROJECT:

Bristol Community College Pump and Filter System for Training Tank Project No. M-2-27

Table of Contents

Specification:

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 00 Project Manual 00 01 05 List of Consultants 00 01 08 Table of Contents 00 11 13 Advertisement to Bid 00 21 13 Instructions to Bidders 00 41 00 Form for General Bid 00 41 01 Bid Deposit 5% - General Contractor 00 41 05 Bidder's Similar Projects Reference Form 00 42 02 Certificate of Compliance with State Tax Laws and Unemployement 00 42 04 Certificate of Compliance with Massachusetts Employment Security Law 00 48 00 Noncollusion Affidavit 00 52 00 Awarding Authority Contractor Agreement 00 52 06 Form of Corporate Vote 00 61 01 Payment Bond Contractor 00 72 00 General Conditions Contract Construction 00 73 36 Form of Contractor's Equal Employment Certification 00 73 39 Supplier Diversity Program 00 73 43 Wage Rate Requirements

Payroll Report Form Wage Rates

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 33 00 Submittal Procedures 01 33 01 Substitution Request Form 01 50 00 Temporary Facilities 01 50 10 Temporary Protection and Controls 01 50 20 Cleaning 01 73 29 Cutting and Patching 01 77 00 Project Closeout Procedures

DIVISION 22 - PLUMBING

22 14 00 Training Tank Filtration and Circulation System

Drawings:

END OF TABLE OF CONTENTS

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 01 08 - 1 Table of Contents

G en er at ed B y B id D oc s:

7/

/2 at

:1 4P

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

M

PI

LE

D O N 0

7/

/2 at

0:

AM

v1.1-20260202 MGL c.149 $50K to $150K

Section 00 11 13

ADVERTISEMENT TO BID

MGL c.149 $50K to $150K

The BRISTOL COMMUNITY COLLEGE, the Awarding Authority, invites sealed bids from Contractors for the Pump and Filter System for Training Tank at Workforce Training Center in New Bedford, Massachusetts, in accordance with the documents prepared by

BRISTOL COMMUNITY COLLEGE.

The Project consists of but not limited to:

Furnish and install a third pool pump and filter system for the existing 54,000 gallon above ground pool/training tank.

The work is estimated to cost $73,000.00.

All bidding Requests for Information (RFIs) shall be submitted online by 07/31/2026 at 12:00PM EDT for general bids.

Bids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive.

THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL

NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. All Bids shall be submitted online at www.biddocs.com and received no later than the date and time specified.

General Bids will be received until 05 August 2026 at 2:00PM EDT and publicly opened online, forthwith.

General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates), and made payable to the BRISTOL COMMUNITY COLLEGE. Note: A bid deposit is not required for Projects advertised under $50,000.

The Contractor and all subcontractors (collectively referred to as “the Contractor”) agree to strive to achieve minority and women workforce participation. The Workforce Participation benchmark is set at 6.9% for women and 15.3% for minorities. The Workforce benchmark percentages are a statutory requirement under MGL c. 149 § 44A(2)(G).

Bid Forms and Contract Documents will be available for review at www.biddocs.com (may be viewed and downloaded electronically at no cost).

PRE-BID CONFERENCE / SITE VISIT: Scheduled Date and Time: 07/24/2026 at 8:00AM EDT

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 11 13 - 1 Advertisement to Bid

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

v1.1-20260202 MGL c.149 $50K to $150K

Address: 198 Herman Melville Blvd, New Bedford, MA 02740 Instructions: None

The hard copy Contract Documents may be seen at:

Nashoba Blue Inc.

433 Main Street Hudson, MA 01749 978-568-1167

END OF SECTION

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 11 13 - 2 Advertisement to Bid

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

v1.2-20221001 MGL c.149 $50K to $150K

Section 00 21 13

INSTRUCTIONS TO BIDDERS

MGL c.149 $50K to $150K

THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL

NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. The bids are to be prepared and submitted at biddocs.com .

ARTICLE 1 - BIDDER'S REPRESENTATION

1.1 Each General Bidder or Sub-bidder (hereinafter called the "Bidder") by making a bid or sub-bid (hereinafter called "bid") represents that:

.1 The Bidder has read and understands the Contract Documents and the bid is made in accordance therewith.

.2 The Bidder has visited the site and is familiar with the local conditions under which the Work must be performed.

1.2 Failure to so examine the Contract Documents and site will not relieve any Bidder from any obligation under the bid as submitted.

ARTICLE 2 - REQUESTS FOR INTERPRETATION

2.1 Bidders shall promptly notify the contact specified in the Advertisement via written request for information (RFI) of any ambiguity, inconsistency, or error which they may discover upon examination of the Contract Documents, the site, and local conditions.

2.2 Bidders requiring clarification or interpretation of the Contract Documents shall make a written request for information (RFI) as specified in the Advertisement. The Awarding Authority may answer such requests if received before the bid date and/or within the time specified in the Advertisement. The Awarding Authority has no obligation to respond to the written requests.

2.3 Interpretation, correction, or change in the Contract Documents will be made by written Addendum which will become part of the Contract Documents. Neither the Awarding Authority nor the Prime Designer will be held accountable for any oral interpretations, corrections, or changes.

2.4 Copies of addenda will be made available for inspection at the locations listed in the Advertisement where Contract Documents are on file or at biddocs.com. Hard copies of the addenda will not be forwarded to the plan holders. The bidder is solely responsible for reviewing all addenda posted on the project website.

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 21 13 - 1 Instructions to Bidders

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

E

DT

http://www.biddocs.com http://www.biddocs.com.

ARTICLE 3 - PREPARATION AND SUBMISSION OF BIDS

3.1 Forms and Bid Preparation

Bids shall be submitted electronically on the "Form for General Bid" at biddocs.com, as appropriate and available at no cost.

The forms enclosed in the Project Manual shall not be extracted or used.

.1 All bidders must create at User Profile account at biddocs.com, at no cost, to complete and submit a bid. The Awarding Authority, the Prime Designer or BidDocs ONLINE Inc. will not be held accountable if the bidder fails to create a User Profile in a timely manner.

.2 All entries on the bid form shall be made online. Any documents that are attached to the bid must be in a pdf format.

.3 Sums shall be expressed in both words and figures in the space indicated on the bid form. The electronic bid forms automatically match the “word” amount to the numeric “figure” amount entered.

3.1 Bid Deposits shall be:

.1 at least five percent (5%) of the greatest possible bid amount, considering all alternates (except for projects bid under MGL c. 149 or MGL c. 3039M under $50,000);

.2 made payable to the Awarding Authority.

.3 conditioned upon faithful performance by the principal of the agreements contained in the bid, and

.4 in the form of:

.1 cash, .2 certified check, treasurer’s or cashier’s check issued by a responsible bank or trust company, or .3 bid bond issued by a surety company licensed to do business in the

Commonwealth of Massachusetts.

Note: Both the “bid bond” or “check” bid deposits are to be scanned and uploaded to the system as a pdf file. IMPORTANT NOTICE: If the bidder elects to make a bid deposit in the form of “cash” or “check”, the Bidder must have the cash or check physically delivered to the Awarding Authority prior to the date and time of the bid opening.

.5 retained until the execution and delivery of the Awarding Authority / Contractor Agreement if they represent the bid deposit of one of the three (3) lowest responsible and eligible General Bidders or one of the three (3) lowest Sub-bidders in a filed sub-bid trade, or a sub-bidder listed by one of the three (3) lowest General Bidders.

3.3 Electronic Submission of General Bids

General Bids, including the bid deposit (if applicable), and required miscellaneous forms noted in the bid documents shall be submitted electronically online at

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 21 13 - 2 Instructions to Bidders

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

E

DT

http://www.biddocs.com, biddocs.com . No hard copy bids will be accepted.

The Bidder will receive an email and/or system notification confirming submission of the bid. Click on the email link to review and print the submitted bid documents.

Keep the email as a receipt that the bid was submitted. Note: The Bidder may modify the bid at any time prior to the bid date and time advertised. The Bidder will receive a new email each time the Bidder re-submits the bid.

.1 Date and time for receipt of bids is set forth in the Advertisement.

.2 Timely submission of a bid online shall be the full responsibility of the Bidder.

Note: The project countdown clock on the website is the official clock that will determine when the bids are due.

3.4 Addenda

All modifications to the bid documents will be issued via an addendum. All registered plan holders will be electronically notified when addenda are issued.

Hard copies of the addenda will not be forwarded to the plan holders. The Bidder is solely responsible for reviewing all addenda posted on the project website. The Bidder must acknowledge all addenda have been reviewed by selecting “yes” or “no” as part of the ebidding process. If the Bidder selects “no”, the Bidder will automatically be directed to the Addenda icon on the project page.

ARTICLE 4 - ALTERNATES

4.1 Each General Bidder shall acknowledge Alternates in Section C on the Form for General Bid by entering the dollar amount of addition or subtraction necessitated by each Alternate.

4.2 In the event an Alternate does not involve a change in the amount of the base bid, the Bidder shall so indicate by entering "0" (numeric figure) in the “Add” space provided for that Alternate.

4.3 General Bidders shall enter on the Form for General Bid a single amount for each Alternate.

4.4 The low Bidder will be determined based on the sum of the base bid and the accepted alternates.

4.5 Alternates will be considered in numerical sequence as required by Chapter 149, Section 44G of the Massachusetts General Laws.

ARTICLE 5 - WITHDRAWAL OF BIDS

5.1 Before Opening of Bids

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 21 13 - 3 Instructions to Bidders

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

E

Any bid may be withdrawn (retracted) prior to the time designated for receipt of bids upon clicking the tab to “Retract Bid”. The Bidder and the Awarding Authority will receive an email confirming that the bidder retracted the bid. Withdrawn bids may be modified and resubmitted up to the time designated for the receipt of bids.

5.2 After Opening of Bids

Bidders may withdraw a bid, without penalty, any time up to the time of Award as defined in paragraph 6.1, and upon demonstrating, to the satisfaction of the Awarding Authority, that a bona fide clerical error was made during the preparation of the bid. Failure to conclusively demonstrate a bona fide clerical error may result in forfeiture of the bid deposit.

5.3 In the event of a general bid withdrawal after opening of bids, the Awarding Authority shall consider the bid from the next lowest eligible and responsible bidder.

ARTICLE 6 - CONTRACT AWARD

6.1 Award means both the determination and selection of the lowest, responsible, and eligible bidder, by the Awarding Authority.

6.2 The Awarding Authority will award the contract to the lowest responsible and eligible bidder within thirty days, Saturdays, Sundays, and legal holidays excluded after the opening of bids in accordance with M.G.L. c.149 §44A.

6.3 The Contract will be awarded to the lowest responsible and eligible Bidder, except in the event of substitution as provided under M.G.L. c.149 §§44E and 44F, in which case the procedure as required by said sections shall govern the award of the Contract.

6.4 The award of this Contract is subject to the approval of the Awarding Authority.

Contracts without approval shall not be considered valid.

6.5 The Awarding Authority reserves the right to waive any informalities in or to reject any or all Bids if it is in the public interest to do so.

6.6 As used herein, the term "lowest responsible and eligible bidder" shall mean the General Bidder whose bid is the lowest of those Bidders demonstrably possessing the skill, ability, and integrity necessary for the faithful performance of the work, and who meets the requirements for Bidders set forth in M.G.L. c.149 §44A-J and is not debarred from bidding under M.G.L. c.149 §44C; and who shall certify that they are able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work.

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 21 13 - 4 Instructions to Bidders

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

ARTICLE 7 - FORMS REQUIRED FOR CONTRACT APPROVAL

7.1 Upon Award, the General Bidder shall complete the following forms to ensure prompt contract validation. These forms will be provided to the selected General Bidder by the Awarding Authority.

7.2 Awarding Authority / Contractor Agreement and Form of Corporate Vote.

7.3 Form of Contractor's Equal Employment Certification in accordance with the General Conditions.

.1 Form of Sub-Contractor's Equal Employment Certification

7.4 Form of Performance Bond and Form of Payment Bond must be submitted by the General Contractor on the Awarding Authority’s form, in accordance with the General Conditions. The dates on the bonds must coincide with the contract date, and a current Power-of-Attorney must be attached to each bond. The minimal performance and payment bonds are as follows.

BOND MGL c. 149 MGL c. 3039M $25K to $50K $50K to $150K $25K to $50K Over $50K

Performance None None None None Payment 50% 50% 50% 50%

7.5 Insurance Certificates for the General Contractor is required and must be submitted in accordance with the General Conditions. General Contractors must indicate on Builder’s Risk insurance or installation floater if stored materials are covered.

7.6 Statement of Management on Internal Accounting Controls and a Statement prepared by a CPA expressing an opinion to the state of Management Controls, as required by M.G.L. c.30 §39R. This applies to the General Contractor only.

ARTICLE 8 - CONTRACT VALIDATION

8.1 The Awarding Authority -Contractor Agreement shall not be valid until signed by the Authorized Signatory of the Awarding Authority.

8.2 The Notice to Proceed for construction shall not be issued until the Awarding Authority/Contractor Agreement has been validated by the Authorized Signatory of the Awarding Authority.

8.3 Incomplete or unacceptable submissions of forms required by paragraphs 7.2 - 7.6 will delay the validation of the Awarding Authority/Contractor Agreement by the Awarding Authority.

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 21 13 - 5 Instructions to Bidders

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

END OF SECTION

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 21 13 - 6 Instructions to Bidders

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

Section 00 41 00

FORM FOR GENERAL BID

MGL c.149 $50K to $150K

TO THE AWARDING AUTHORITY: Bristol Community College

A. The Undersigned proposes to furnish all labor and materials required for Pump and Filter System for Training Tank [Project #M-2-27] at Workforce Training Center in New Bedford, Massachusetts, in accordance with the accompanying plans and specifications prepared by Bristol Community College for the contract price specified below, subject to additions and deductions according to the terms of the specifications.

B. This bid includes addenda numbered: ___________________________________________________________

C. The proposed contract price is:

__________________________________________________ dollars $__________________________________

Bid Amount in Words Bid Amount in Numbers

For alternate No. ________ Add $______________ Subtract $______________ No. ________ Add $______________ Subtract $______________ No. ________ Add $______________ Subtract $______________ No. ________ Add $______________ Subtract $______________ No. ________ Add $______________ Subtract $______________

D. The undersigned agrees that, if he is selected as general contractor, he will within five days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority and each in the sum of the contract price, the premiums for which are to be paid by the general contractor and are included in the contract price; provided, however, that if there is more than 1 surety company, the surety companies shall be jointly and severally liable.

The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to section 44A.

The undersigned further certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word ''person'' shall mean any natural person, joint venture, partnership, corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.

07/22/2026 G en er at ed

B y

B id

D oc s:

7/

/2 at

:0

0A M

E D

T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

NAME OF BIDDER

SIGNATURE AND TITLE OF PERSON SIGNING BID

Date: _________________________ ______________________________________________

BUSINESS ADDRESS

07/22/2026 G en er at ed

B y

B id

D oc s:

7/

/2 at

:0

0A M

E D

T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

BID BOND

CONTRACTOR: SURETY:

Name: Name:

Address: Address:

AWARDING AUTHORITY:

Name:

Address:

BOND AMOUNT:

PROJECT:

The Contractor and Surety are bound to the Awarding Authority in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Awarding Authority accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Awarding Authority and Contractor, and the Contractor either (1) enters into a contract with the Awarding Authority in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise, acceptable to the Awarding Authority, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or

(2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Awarding Authority may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Awarding Authority and Contractor to extend the time in which the Awarding Authority may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty

(60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Awarding Authority and Contractor shall obtain the Surety’s consent for an extension beyond sixty (60) days.

When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory and not as a common law bond.

IN THE WITNESS WHEREOF,

the Principal and Surety signed and sealed this day of , 20

(Contractor as Principal) (Seal) (Witness)

(Title)

(Surety) (Seal) (Witness)

(Title)

07/22/2026 G en er at ed

B y

B id

D oc s:

7/

/2 at

:0

0A M

E D

T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

M

PI

LE

D O N 0

7/

/2 at

0:

AM

SIMILAR PROJECTS - REFERENCE FORM

v1.0-20230830 MGL c.149 $50K to $150K

The bidder must provide five (5) similar projects performed & completed within the past five (5) years.

Similar Project 1 Project Address: ____________________________________________________________________ Start Date: ______________________ End Date: ________________________ Current Cost: ______________________ Original Cost: ________________________ Cost Change Explanation: ____________________________________________________________ Project Description: _________________________________________________________________ Awarding Authority Reference Contact Prime Designer Reference Contact

Project Manager Reference Contact General Contractor Reference Contact

Similar Project 2 Project Address: ____________________________________________________________________ Start Date: ______________________ End Date: ________________________ Current Cost: ______________________ Original Cost: ________________________ Cost Change Explanation: ____________________________________________________________ Project Description: _________________________________________________________________ Awarding Authority Reference Contact Prime Designer Reference Contact

Project Manager Reference Contact General Contractor Reference Contact

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 41 05 - 1 Bidder's Similar Projects Reference Form

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

Similar Project 3 Project Address: ____________________________________________________________________ Start Date: ______________________ End Date: ________________________ Current Cost: ______________________ Original Cost: ________________________ Cost Change Explanation: ____________________________________________________________ Project Description: _________________________________________________________________ Awarding Authority Reference Contact Prime Designer Reference Contact

Project Manager Reference Contact General Contractor Reference Contact

Similar Project 4 Project Address: ____________________________________________________________________ Start Date: ______________________ End Date: ________________________ Current Cost: ______________________ Original Cost: ________________________ Cost Change Explanation: ____________________________________________________________ Project Description: _________________________________________________________________ Awarding Authority Reference Contact Prime Designer Reference Contact

Project Manager Reference Contact General Contractor Reference Contact

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 41 05 - 2 Bidder's Similar Projects Reference Form

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

Similar Project 5 Project Address: ____________________________________________________________________ Start Date: ______________________ End Date: ________________________ Current Cost: ______________________ Original Cost: ________________________ Cost Change Explanation: ____________________________________________________________ Project Description: _________________________________________________________________ Awarding Authority Reference Contact Prime Designer Reference Contact

Project Manager Reference Contact General Contractor Reference Contact

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 41 05 - 3 Bidder's Similar Projects Reference Form

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

M

PI

LE

D O N 0

7/

/2 at

0:

AM

CERTIFICATE OF COMPLIANCE WITH STATE TAX LAWS AND

WITH UNEMPLOYMENT COMPENSATION CONTRIBUTION REQUIREMENTS

Pursuant to M.G.L., Chapter 62C, Section 49A and M.G.L., Chapter 151A, Section 19A, I, authorized signatory for whose principal place of business is at do hereby certify under penalties of perjury that has filed all state tax returns and paid all taxes as required by law and has complied with all state laws pertaining to contributions to the unemployment compensation fund and to payments in lieu of contributions.

The Business Organization Social Security Number or Federal Identification Number will need to be provided at Contract Award.

Signed under the penalties of perjury the day of 20

Signature:

Name and Title:

Affix Corporate Seal

Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 42 02 - 1 Certificate of Compliance with State Tax Laws and Unemployement

La st

M od ifi ed

: 0 7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

M

PI

LE

D O N 0

7/

/2 at

0:

AM

CERTIFICATE OF COMPLIANCE WITH

MASSACHUSETTS EMPLOYMENT SECURITY LAW

Pursuant to Massachusetts General Laws, Chapter 151A, s. 19A (b), I signing on behalf of (Name and Title)

, hereby certify that the

(Contracting Party) aforementioned employer has complied with all employment security laws of the Commonwealth relating to contributions and payments in lieu of contributions.

Signed under the penalties of perjury this day of ________________________,___________

AUTHORIZED SIGNATURE

Affix Corporate Seal

Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 42 04 - 1 Certificate of Compliance with Massachusetts Employment Security Law

La st

M od ifi ed

: 0 7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

M

PI

LE

D O N 0

7/

/2 at

0:

AM

Document 00 48 00

NONCOLLUSION AFFIDAVIT

This document must be submitted by General Bidders with the bid. The undersigned, being first duly sworn, deposes and says that:

A. He/She is (an Officer) of , the Bidder that has submitted the attached Bid;

B. He/She is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;

C. Such Bid is genuine and is not a collusive or sham Bid;

D. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the Owner, or any person interested in the proposed Contract;

E. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.

F. The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used herein, the word person shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.

Signature:

Name of Person signing bid:

Name of Business:

Subscribed and sworn to before me this day of , 20

(Title)

My commission expires:

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 48 00 - 1 Noncollusion Affidavit

La st

M od ifi ed

: 0 7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

M

PI

LE

D O N 0

7/

/2 at

0:

AM

Section 00 52 00

AWARDING AUTHORITY/CONTRACTOR AGREEMENT

MGL c.149 $50K to $150K

This agreement made the day of , by and between the BRISTOL COMMUNITY COLLEGE hereinafter called the “Awarding Authority”, and _________________ hereinafter called the “Contractor”.

Witnesseth, that the Awarding Authority and the Contractor, for the consideration hereinunder named, agrees as follows:

Article 1. Scope of Work: The Contractor shall perform all Work required by the Contract Documents for PUMP AND FILTER SYSTEM FOR TRAINING TANK Project No. M-2-27 as referred to in the Contract Documents prepared by BRISTOL COMMUNITY COLLEGE hereinafter referred to as the “Prime Designer”.

Article 2. Time of Completion: The Contractor shall commence work under this Contract on the date specified in the written “Notice to Proceed” and shall bring the Work to Substantial Completion within __ calendar days of said date. Damages for delays in the performance of the Work shall be in accordance with Article 8 of the General Conditions of the Contract and/or a minimum of $500/day.

Article 3. Contract Sum: The Awarding Authority shall pay the Contractor, in current funds, for the performance of the Work, subject to additions and deductions by Change Order, of the Contract Sum of:

______________________________________ Dollars $ _______________________.

Contract Amount in Words Contract Amount in Dollars

Article 4. The Contract Documents: The following, together with this Agreement, form the Contract and all are as fully a part of the contract as if attached to this Agreement or repeated herein: The Advertisement, Bidding Documents, Contract Forms, General and Supplemental Conditions of the Contract, and Specifications as enumerated in the Table of Contents, the drawings as enumerated in the List of Drawings, Addenda and all Modifications issued after execution of the Contract. Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings designated in those Conditions.

Article 5. Alternates: The following Alternates have been accepted and their costs are included in the Contract Sum stated in Article 3 of this Agreement: Alternate No(s):

Article 6. REAP Certification: Pursuant to M.G.L. c.62(c), sec.49(a), the individual signing this Contract on behalf of the Contractor, hereby certifies, under the penalties of

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 52 00 - 1 Awarding Authority Contractor Agreement

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

perjury, that to the best of their knowledge and belief the Contractor has complied with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.

Article 7. Validation: This Contract will not be valid until signed by the Authorized Signatory.

In Witness Whereof, the Parties Hereto Have Caused This Instrument to be Executed Under Seal.

1 Contractor BRISTOL COMMUNITY COLLEGE Name of Contractor Street Address City, State Zip Code Print Name

Signature and Seal Signature and Seal

Witness Title 1 If a Corporation, attach a notarized copy of the Corporate Vote authorizing signatory to sign Contract.

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 52 00 - 2 Awarding Authority Contractor Agreement

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

Section 00 52 06

FORM OF CORPORATE VOTE

MGL c.149 $50K to $150K

I hereby certify that a meeting of the Board of Directors of the:

Name of Corporation duly called and held at ____________________ on the ____ day of _______________

20_____ at which a quorum was present and acting, it was voted that___________________________ of the ____________________, be and hereby is Name of Corporate Officer authorized to execute and deliver for and on behalf of the Corporation a Contract with the BRISTOL COMMUNITY COLLEGE for work to be done at PUMP AND FILTER SYSTEM FOR TRAINING TANK Project No. M-2-27 in New Bedford, Massachusetts.

And to act as principal to execute bonds in connection therewith, which Contract and

Bonds were presented to and made part of the records of said meeting. I further certify that _____________________________________ Is duly qualified and acting Name of Corporate Officer

_______________________of the Corporation and that said vote has not been Title repealed, rescinded or amended.

A true copy of the record, Attest: _________________________________

(CORPORATE SEAL)

On this ____ day of __________ 20____, before me, the undersigned Notary Public, personally appeared __________________________, duly designated by the board of directors and proved to me, through satisfactory evidence of identification, which was ___________________________________, that s/he is the person whose name is signed on the foregoing documents, and acknowledged to me that s/he signed it voluntarily for its stated purpose and that it was her/his free act and deed.

Notary Public My Commission Expires:

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 52 06 - 1 Form of Corporate Vote

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

M

PI

LE

D O N 0

7/

/2 at

0:

AM

Bond No. _____________

Section 00 61 01

PAYMENT BOND - CONTRACTOR

MGL c.149 $50K to $150K

KNOW ALL MEN BY THESE PRESENTS:

That we, ______________________________________________________________ as Principal, _______________________ and ________________________________ as Surety, are held and firmly bound unto the Bristol Community College as Obligee, in the sum of to be paid to the Obligee, for which payments, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, the said Principal has made a contract with the Obligee, bearing the date of _________________, 20 ______ for the construction of PUMP AND FILTER SYSTEM FOR TRAINING TANK Project No. M-2-27 in New Bedford, Massachusetts.

NOW the conditions of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include any other purposes or items set out in, and to be subject to, provisions of M.G.L. c.30 §39A, and M.G.L. c.149 §29, as amended, then this obligation shall become null and void; otherwise it shall remain in full force and virtue.

IN WITNESS WHEREOF, the Principal and Surety have hereunto set their hands and seals this: _______________ Day of _____________________ 20____.

PRINCIPAL ________________________ SURETY ____________________________

By: _______________________________ By: _________________________________ Seal Attorney-in Fact Attest: ____________________________ Attest: _______________________________

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 61 01 - 1 Payment Bond Contractor

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

The rate for the bond is ______ % for the first $ _______________________________ and ______ % for the next $ ______________________________________________.

The total premium for this bond is $ ________________________________________.

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 61 01 - 2 Payment Bond Contractor

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

v1.4-20260710 MGL c.149 $50K to $150K

Section 00 72 00

GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION

MGL c.149 $50K to $150K

TABLE OF CONTENTS

ARTICLE

1. DEFINITION OF TERMS

2. AWARDING AUTHORITY

3. CONTRACTOR

4. ADMINISTRATION OF THE CONTRACT

5. SUBCONTRACTORS

6. CONSTRUCTION BY AWARDING AUTHORITY/SEPARATE CONTRACT

7. CHANGES IN THE WORK

8. TIME, SCHEDULE, COMPLETION

9. PAYMENTS

10. GUARANTEES AND WARRANTIES

11. MISCELLANEOUS LEGAL REQUIREMENTS

12. CONTRACTOR ACCOUNTING REQUIREMENTS

13. EEO REQUIREMENTS

14. INSURANCE REQUIREMENTS

15. INDEMNIFICATION

16. PERFORMANCE AND PAYMENT BONDS

17. TERMINATION

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 72 00 - 1 General Conditions Contract Construction

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

ARTICLE 1

DEFINITION OF TERMS

1.1 BASIC DEFINITIONS

1.1.1 THE CONTRACT DOCUMENTS

The Contract Documents consist of the Awarding Authority-Contractor Agreement, Advertisement, Instructions to Bidders, Bidding Documents, Contract Forms, General Conditions of the Contract for Construction, Supplemental General Conditions (if any), Specifications, Drawings, all addenda issued prior to execution of the Contract, and other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive or (4) a written order for a minor change in the Work issued by the Prime Designer. The Contractor's bid and all related documents, and the Awarding Authority's solicitation, including any purchase descriptions, specifications, submission requirements, scope of work, drawings, and other related documents, are incorporated into and made part of this Contract. The Contract Documents form the entire and integrated agreement between the parties and supersede prior negotiations, representations, or agreements, either written or oral.

1.1.2 THE CONTRACT

The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. The Contract may be amended or modified only by a Modification in writing and signed by the Awarding Authority, Prime Designer and General Contractor.

1.1.3 THE WORK

The term "Work" means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment, and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project.

1.1.4 THE PROJECT

The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Awarding Authority or by separate contractors.

1.1.5 THE DRAWINGS

The Drawings are the graphic and pictorial portions of the Contract Documents, wherever located and whenever issued, showing the design, location, and dimensions of the Work, generally including plans, elevations, sections, details, schedules, and diagrams.

1.1.6 THE SPECIFICATIONS

The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards, and workmanship for the Work, and performance of related services.

1.1.7 THE SITE

The term “Site,” also referred to as the “site” or “Project site” means the lands or areas indicated in the Contract Documents as being furnished by Awarding Authority upon which the Work is to be performed, including rights-of-way and easements, and such other lands furnished by Awarding Authority which are designated for the use of Contractor.

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 72 00 - 2 General Conditions Contract Construction

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

1.2 EXECUTION, CORRELATION, AND INTENT

1.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents. Except as provided for in and required by M.G.L. c. 30, § 39N, no allowance will be made in the Contract or the Work under the Contract for failure of the Contractor to visit the site.

1.2.2 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. Performance by the Contractor shall be required to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the intended results. In case of inconsistent requirements in the Contract Documents, the requirement for the greater quantity or higher quality shall take precedence and shall be the Contract requirement. In the event of any conflict between the Contract Documents and any applicable law or building code (including the Massachusetts State Building Code, 780 CMR), the applicable law or code shall prevail.

1.2.3. Unless otherwise stated in the Contract Documents, words which have well known technical, or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings except where the Contract Documents provide a different definition.

1.2.4. Where reference is made to standards or trade association publications, it shall be considered to refer to the latest edition and revision thereof, if any, in effect on the date the Contract Documents were advertised for bid.

1.2.5. All Work mentioned or indicated in the Contract Documents shall be performed by the Contractor as part of this Contract unless it is specifically indicated in the Contract Documents that such Work is to be done by others.

1.2.6. Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade, except that the performance of filed sub-trade work shall comply with the provisions of chapter 149 of the General Laws of the Commonwealth of Massachusetts (when applicable). The Contractor and all Subcontractors shall refer to all of the Drawings, including those showing primarily the Work of the mechanical, electrical and other specialized trades, and to all of the Sections of the Specifications, and shall perform all Work reasonably inferable therefrom as being necessary to produce the indicated results.

1.2.7. All indications or notations which apply to one of a number of similar situations, materials or processes shall be deemed to apply to all such situations, materials or processes wherever they appear in the Work, except where a contrary result is clearly indicated by the Contract Documents.

1.2.8. Where no explicit quality or standards for materials or workmanship are established for Work, such Work is to be of good quality for the intended use and consistent with the quality of the surrounding Work and of the construction of the Project generally.

1.2.9. All manufactured articles, materials, and equipment shall be applied, installed, connected, erected, used, cleaned, and conditioned in accordance with the manufacturer’s written or printed directions and instructions unless otherwise indicated in the Contract Documents.

1.2.10. The Mechanical, Electrical and Fire Protection Drawings are diagrammatic only, and are not intended to show the alignment, physical locations or configurations of such Work. Such Work shall be installed without additional cost to the Owner to clear all obstructions, permit proper

Bristol Community College Pump and Filter System for Training Tank Project #M-2-27

07/22/2026

00 72 00 - 3 General Conditions Contract Construction

G en er at ed B y B id D oc s:

7/

/2 at

:0 0A

M E

D T

CO

M

PI

LE

D O N 0

7/

/2 at

0:

AM

clearances for the Work of other trades, and present an orderly appearance where exposed. Prior to beginning such Work, the Contractor shall prepare coordination drawings showing the exact alignment, physical location and configuration of the Mechanical, Electrical and Fire Protection installations and demonstrating to the Contractor’s satisfaction that the installations will comply with the preceding sentence.

1.2.11. Exact locations of fixtures and outlets shall be obtained from the Prime Designer before the Work is roughed in; Work installed without such information from the Prime Designer shall be relocated at the Contractor’s expense.

1.2.12. Test boring or soil test information made available to the Contractor was obtained for use by the Prime Designer in the design of the Project. Such information is not represented as a complete or accurate indication of subsurface conditions, and the Contractor's rights with respect to actual conditions differing from those indicated are governed by Article 7.6 (Differing Site Conditions) and M.G.L. c.30 §39N.

1.2.13. Where the Work is to fit with existing conditions or work to be performed by others, the Contractor shall fully and completely join the Work with such conditions or work, unless otherwise specified.

The Awarding Authority provided drawings showing existing conditions or construction are based on available documents and are not guaranteed to show actual existing conditions.

1.2.14. In the interest of brevity, the Contract Documents frequently omit modifying words such as “all” and “any” and articles such as “the” and “an,” but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement.”

1.3 USE OF DRAWINGS, SPECIFICATIONS, AND OTHER DOCUMENTS

1.2.3 The Drawings, Specifications, and other documents prepared by the Prime Designer, including all copies, whether electronic or hard copy, furnished to the Contractor, are instruments of service.

They are and shall remain the property of the Awarding Authority (or the Prime Designer, as their interests appear under the agreement between the Awarding Authority and the Prime Designer), and are furnished to the Contractor for use solely with respect to this Project.

1.2.4 The Drawings, Specifications, and other documents shall not be used by the Contractor or any Subcontractor, Sub-subcontractor, or material or equipment supplier on other projects, or for additions to this Project outside the scope of the Work, without the specific written consent of the Awarding Authority and the Prime Designer.

1.2.5 With the exception of one contract set retained by each party to the…