SOW 21 CES Window Tint and Blinds Install.pdf

PDF 672 KB Posted

Attached to
21 CES/OL Tints and Blinds Install
Solicitation number
Not on record
Issued by

About this file

This is a Statement of Work for the installation of solar control and security window film, along with blinds, at Cheyenne Mountain Space Force Station in Colorado, prepared by the 21st Civil Engineer Squadron.

The project involves supplying and installing solar control and security window film on approximately 152 windows totaling 3,100 square feet across three locations: Building 101 (Location 1) and Buildings 12001 and 12100 (Location 2). Location 1 requires Premium Nano-Ceramic or Spectrally Selective Solar Film with RF/IR blocking technology incorporating Certified TEMPEST Technical Authority standards, with exterior reflectivity not exceeding 15% and standard dark tints prohibited. Location 2 requires film that limits interior viewing without restricting outward views. The contractor must submit physical film samples (10-75% VLT range), a Film-to-Glass Compatibility Chart, and factory-certified Thermal Stress Analysis prior to installation. Heavy-duty, commercial-grade, permanently-secured roll-up blinds must be installed on the entire east side of the second story, excluding office 203, but including offices 212 and 213. Installation procedures require thorough cleaning of glass surfaces, uniform application without air bubbles or debris, and film edges stopping 3-5mm short of window frames to preserve existing structural silicone and acoustic seals. All work must comply with OSHA requirements (29 CFR 1910 and 1926) and Air Force Occupational Safety and Health standards (DAFMAN 91-203). Work shall occur between 7:00 a.m. and 4:00 p.m., excluding weekends and federal holidays, with written approval required for deviations. Location 2 access requires proper authorization for the restricted area; contractor personnel must pass background checks and coordinate visitor passes through R&O at 719-474-2775. Post-installation deliverables include all operational and maintenance documentation, test results, and compliance with all applicable codes, regulations, standards, and criteria.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Statement Of Work For

Installation of Solar Control and Security Window Film for Glare, Heat Reduction, and Blinds for Secure Open Storage Compliance

Work Task# 18971742 July 21, 2026

PREPARED BY:

21st CIVIL ENGINEER SQUADRON

1 NORAD RD

CHEYENNE MOUNTAIN SPACE FORCE STATION, CO 80914

1. BACKGROUND AND OBJECTIVE

1.1. The purpose of this project is to supply and install solar control and security , which will be referred to as

, which will be referred to as on Cheyenne

Mountain Space Force Station.

1.2. -installed, blast-

1.3.

1.4.

1.5.

Establish a "future-proofed" installation protocol for windows within the personnel with a one-either side of the

2. SCOPE OF WORK

2.1. General

windows and one half-lite door in window and half-lite door

Contractor shall also install roll up type blinds standards, and criteria.

2.2. Window Inventory & Dimensions

purposes.

Dimensions (H x W)

Total Estimated Scope Approx. 3,100 sq. ft. 158

2.3.

to ascertain the nature and locations

C

T U conditions at the site in this contract.

3. TECHNICAL & MATERAIL REQUIREMENTS

3.1. by Location a installed operations.

Contractor shall LT for selection.

-way" tints are strictly prohibited.

will installed. Installation will only include entire east side of second story,

4. SECURITY & INSTALLATION REQUIREMENTS

4.1. Future Open Storage Physical Security Integrity

acoustic seals.

4.2. Installation Procedures

5. GENERAL & ADMINSTRATIVE REQUIREMENTS

5.1. Environmental & Hazardous Material Handling

5.2. Work Schedule

Saturdays, Sundays, and Federal Holidays.

5.3. Work Area Access

This area , and

Upon acceptance of this contract

The Contractor shall coordinate with -who fails to pass

5.4. Safety

5.5. Protection of Government Property

6. SUBMITTALS & DELIVERABLES

6.1. Contractor Submittals Prior to Install

-to-

6.2. Contractor Submittals Post Install

7. CLEANUP & INSPECTION

7.1. Site Maintenance & Cleanup

at the end of each shift.

the site daily.

7.2. Inspection

punch list

File details come from the government source that posted it. Updated .