PSEF Mineral Insulated Cable Layout Path 06032025.pdf

PDF 2 MB Posted

Attached to
Installation of the MI cable at the PSEF building
Solicitation number
N0042125Q1330
Issued by

About this file

These images appear to be detailed technical photographs of an industrial piping and processing system, with multiple measurement annotations indicating precise dimensions of various system components. The images show complex pipe routing with white and metallic pipes, multiple junction points, support structures, and industrial equipment such as condensate boxes, valves, and pressure gauges. The measurements range from as small as 9" to as large as 184", with components positioned at various heights and angles. The system is located in an industrial facility with blue-trimmed metal buildings and appears to be part of a large processing or utility infrastructure, with pipes routed through and around structural support frames and equipment housings.

View the file

Other files

File Type Posted
Solicitation - N0042125Q1330.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

41”

55”

42” 42”

Condensate Box 19”x15”x16”

50”

9” 9”

9” high on all 3

10”

19”

31”

33”

31”

10”

13”

31”

15”

25”

24”

60”

70”

35”

90”

80”

0”

H ig h Ab ov e

G ro un d

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9

File details come from the government source that posted it. Updated .