SF-30AMENDMENT 3 to Solicitation..doc
DOC document 87 KB Posted
- Solicitation number
- PSC-RFP-CUSTODIAL-09
About this file
SF30
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 1 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Amendment Number 3 |
| 5/8/08 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
DHHS/Program Support Center
Division of Acquisition Management, SAS 5600 Fishers Lane
Parklawn Building, Room 5-101
Rockville, MD 20857
OMB NO. 0990-0115
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (x) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| All Potential Offerors |
| FORMCHECKBOX |
PSC-RFP-CUSTODIAL-09
9B. DATED (SEE ITEM II)
4/11/08
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
| CODE |
| FACILITY CODE |
10B. DATED (See Item 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
FORMCHECKBOX
is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (x) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. |
FORMCHECKBOX
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 0 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment for solicitation PSC-RFP-CUSTODIAL-09 is to post ATTACHMENT A - Walk Through List from April 26, 2008. In addition, upon reviewing some of the attachments, the government noticed an error in one of the formulas in Exhibit 18. Therefore, we are also posting the Revision to this Exhibit. Similarly in the SF-30 Amendment 1 document posted on 5/6, it was discovered that box 3 and box 9b were incorrect. We have posted the revisions (box 2 with the title "Amendment 2" is correct). We also have the following responses to questions. No further questions shall be answered.
Q1) We did not visit the “Personal Property Facility”, are there access requirements there too?
A1) Same security clearance needed.
Q2) Also relating to the “Personal Property Facility” can we access it for the benefit of intelligence and perfecting our price?
A2) No, A task and frequency chart was provided in Exhibit 20 for this facility, along with floor plans and Exhibit #1.
Q3) Wabted clarification on “Trash Receptacles” and where the locations are and how many are in each facility?
A3) You can assume each person has at least one at their desk. Parklawn has recycling centers in each elevator lobby.
Q4) Can we see a square footage for “Load Areas” which I assume it is the loading dock. Can you provide this?
A4) Approximately 5000 sq ft.
Q5) Can we get a count on the following items:
A5)
• Blind stands and what location 1, 10th floor B-wing
• Venetian Blinds (Are they cleaned by the sub or by the incumbent contractor) Blinds are in most windows
• Exterior light fixtures (How many?) not in solicitation
• Telephone Booths (How many?) 0
• Grounds Maintenance – (May we get current contact information on “Capital City Gounds”? yes
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
NSN 7540-01-152-8070
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION NOT USABLE
Prescribed by GSA
FAR (48 CFR) 53.243
IEF
NSN 7540-01-152-8070
CONTINUATION PAGE
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION NOT USABLE
Prescribed by GSA
FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .