Exhibit 1- Building Information.pdf

PDF 39 KB Posted

Attached to
CUSTODIAL AND RELATED SERVICES FOR THE PARKLAWN BUILDING
Solicitation number
PSC-RFP-CUSTODIAL-09
Issued by

About this file

Exhibit 1- Building Information

View the file

Other files

File Type Posted
Attachment A - Walk Through List.pdf PDF
Exhibit 18 - Price Template Base Services Revised Formulas.xls XLS spreadsheet
SF-30AMENDMENT 1 to Solicitation Revision 5-8-08..doc DOC document
SF-30AMENDMENT 3 to Solicitation..doc DOC document
Exhibit 9 - WD2005-2103.pdf PDF
SF-30AMENDMENT 1 to Solicitation..doc DOC document
Amendment 1 Questions.doc DOC document
Exhibit 12 - GSA 176 Personal History.pdf PDF
Exhibit 7 - Key Personnel.pdf PDF
Exhibit 10 - Speed Memo.pdf PDF
Exhibit 8 - Holidays.pdf PDF
Exhibit 16 - Warehouse2.pdf PDF
Exhibit 6 - Lawn Maintenance.pdf PDF
Exhibit 14 - Past Performance.pdf PDF
Section K-M.pdf PDF
Exhibit 15 - Warehouse1.pdf PDF
Exhibit 9 - WD2005-2103.txt TXT text file
Exhibit 19 - Snow Removal Pricing Template.xls XLS spreadsheet
Exhibit 3 - Environmental Requirements.pdf PDF
CoverLetter.doc DOC document
SF-33.doc DOC document
Exhibit 4 - Deduction Schedule.doc DOC document
Exhibit 11 - Standard Form LLL.pdf PDF
Exhibit 20 - Task and Frequency Chart.pdf PDF
Exhibit 17 - Warehouse3.pdf PDF
Exhibit 2 - Quality Requirements.pdf PDF
Exhibit 5 - Snow Removal.pdf PDF
Exhibit 13 - Questions and Answers.pdf PDF
SECTION B-J.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 1

Building Information

Building: Parklawn

A. Building Data:

Location: 5600 Fishers Lane, Rockville, MD Height of Building: 160 feet Depth of Moats: 0 Number of Stories: 18 Building Completed: 1970 Population: 6,500 Official working hours of building occupants: 6:15 am to 6:15 pm

B. Statistics:

Building:

Gross Area...................................... 1,482,359 SF Occupiable Area................................. 1,349,184 SF Net Cleaning Area.1/............................ 1,434,064 SF Gross Area of Main Corridor....2/............... 16,324 SF Gross Area of Main Corridor(carpeted)...2/...... 395 SF Gross Area of Secondary Corridor................ 118,730 SF Gross Area of Secondary Corridor (carpeted) .... 400 SF Gross Area of Lobbies and Entrance....3/........ 8,573 SF Toilet Fixtures................................. 847 FIXTURES Exterior Windows........./4..................... 8,740 WINDOWS Plate Glass.................................. 2,172 SF Venetian Blinds................................. 8,740 WINDOWS Light Fixtures.................................. 26,266 FIXTURES VIP Space, Court, and Jury Rooms, Judges chambers

Bare Floor................................... 222 SF Carpeted..................................... 13,102 SF Conference Rooms............................. 26,245 SF General Office, File Rooms, Libraries, etc.

Bare Floor................................... 22,189 SF Carpeted..................................... 911,261 SF

ADP (Raised Floor Area) Carpet.................. 11,282 SF Bare.................... 7,122 SF

Vending Area.................................... 1,777 SF Health Unit Area................................ 2,977 SF Storage Space................................... 10,980 SF Stairways (Flights)............................. 144 FLIGHTS Passenger Elevators............................. 18 ELEVATORS Freight Elevators............................... 2 ELEVATORS Escalators Garage and Ramps................................ 282,485 SF

Exhibit 1 (continued)

Hard Floor Area to be Stripped and Sealed..... 8,573 SF Outside Area to be policed.................... 674,647 SF Male Restrooms................................ 82 EA Male Restroom Fixtures........................ 484 EA Female Restrooms.............................. 82 EA Female Restroom Fixtures...................... 364 EA Private Restrooms............................. 6 EA

Total Restrooms............................... 170 EA

C. Outside Grounds:

Turf Area................................ 1.0 ACRES Edging......................................undetermined LF Shrubs......................................undetermined LF Parking Lot Area......................... 12.5 ACRES

Footnotes:

1) That part of the building that is to be cleaned by the

Contractor. This includes: corridors, entrances, lobbies, office space, storage space, garage and ramps within the building.

1,434,064 square feet

2) Main corridors are normally defined as those corridors located on the first or ground floors of a building or those that serve as primary entrance or exit areas. The following are designated as main corridors: 18B North Elevator Lobby, 5th Floor, 2nd Floor, 3B lobby.

3) Main entrances are defined as entrances where traffic volume is highest; where the majority of the building occupants of the general public pass through these major areas to either transact business within the building or to arrive at their normal work stations. The following are designed as main entrances:

a. 1st Floor Entrance

b. 3rd Floor Entrances

d. 5th Floor Entrance

4) This building is not equipped with usable window washer belt hooks.

NOTE: All of the above listed building statistics and information is provided as approximate and is not to be construed by the Contractor as actual but merely as a guide. The Contractor shall confirm all the above by actual walk thru and taking measurements of any questioned item when there is doubt.

The current Parklawn lease expiries in July 2010. A one year extension has been granted while negotiations proceed until July 2011. One of two possible scenarios are expected;

relocation or renovations. Each scenario poses like constraints whether it’s a staged move or renovation both will require a decrease of serviceable space be it permanent or temporary. The actual logistics of each scenario will play a key part in how cost, scheduling and performance will be addressed. In both cases while some office space may be vacant in a corridor, others may be occupied leaving the pubic space; restrooms, corridors and vending areas in need of service. It is unknown at this time which scenario will take place or how they will be executed.

Exhibit 1

Building: Healthy Beginnings

Child Development Center

A. Building Data:

Location: 5610 Fishers Lane, Rockville, MD Number of Stories: 1 1/2 Building Completed: 1992/2001 Population: 150 Official working hours of building occupants: 6:30 am to 6:30 pm

Gross Area................................ 14,123 SF Net Cleaning Area.1/...................... 14,123 SF Gross Area Corridor(carpeted)............. 874 SF Area of Lobbies and Entrance.............. 154 SF Exterior Windows........./4.......... 49 WINDOWS General Office, Class Rooms, Restrooms, Libraries, etc.

Bare Floor............................ 7,973 SF Carpeted.............................. 5,326 SF

Stairways (Flights)................. 4 FLIGHTS Passenger Elevators............... 1 ELEVATORS Hard Floor Area to be Stripped and Sealed 80 SF Outside Area to be Policed............... 6000 SF Restrooms................................ 15 EA Fixtures................................. 43 EA

Building: Personal Property Facility

A. Building Data:

Location: 16071 Industrial Dr Gaithersburg Md Number of Stories: 1 Warehouse/Office

Official working hours of building occupants: 7:00 am to 4:00 pm

Net Cleaning Area............... 11,100 SF Gross Area Carpet............... 5,462 SF Toilet Fixtures................. 20 FIXTURES Exterior Windows................ 13 WINDOWS Plate Glass.................... .250 SF Male Restrooms................... 2 EA Male Restroom Fixtures........... 8 EA Female Restrooms.................. 2 EA Female Restroom Fixtures......... 8 EA Private Restrooms................ 2 EA Total Restrooms.................. 6 EA

File details come from the government source that posted it. Updated .