PSC Preproposal Addendum No. 1.pdf
PDF 422 KB Posted
- Solicitation number
- RFP-171-180000002114-2
- Issued by
- Clare County, Michigan
About this file
This is a Pre-Proposal Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget's State Facilities Administration for a Professional Service Contract (PSC) related to roof replacement and repair work at Chippewa Correctional Facility. The addendum was issued on April 30, 2018, with proposals due on May 10, 2018. A mandatory pre-proposal walk-through inspection was conducted on April 26, 2018, and this addendum provides additional information and corrections requested or identified during that inspection.
The addendum includes two items: a copy of the sign-in sheet from the mandatory pre-proposal walk-through inspection and photos from the pre-proposal walkthrough. The document requires bidders to acknowledge receipt by signing and returning two copies with their proposal submission. The project file number is 472/17434.TAP and the index number is 52260. The attached sign-in sheet appears to show attendance records from the mandatory site visit, including contact information for the attendees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMB-406 (R 0/17)
STATE OF MICHIGAN Date Issued: April 30, 2018 Department of Technology, Management and Budget Index No(s): 52260 State Facilities Administration File No: 472/17434.TAP 3111 W. St Joseph St. Lansing, MI 48917 Department: Corrections P.O. Box 30026 Project Name: Chippewa CF Lansing, Michigan 48909 Various Roof Replacement/Repair Subject: PSC Proposal Proposal Due Date: May 10, 2018
PSC PRE-PROPOSAL ADDENDUM NO. 1
TO: All Interested Parties
SUBJECT: Revision to RFP Soliciation Notice and Project Statement
INTENT: This Addendum is issued to provide additional and corrected information to proposers as requested, distributed or identified at the mandatory pre-proposal walk through inspection conducted on April 26, 2018.
Item 1 – Attached is a copy of the Sign-In Sheet from the Mandatory Pre-Proposal Walk Through Inspection.
Item 2 – Photos from the pre-proposal walkthrough are attached.
Here ends PSC Pre-Proposal Addendum No. 1.
ACKNOWLEDGEMENT: Two copies of this Addendum, properly signed in the space provided below, must be acknowledged and returned with the bidder's proposal for submission of a valid proposal. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)
Firm Name
Bidder's Signature Date
Sincerely, Tom Pawlowski, Project Director DTMB - State Facilities Administration Design and Construction Division
Lansing, Michigan 48909 Various Roof Replacement/Repair
File details come from the government source that posted it. Updated .