PSA-CSKT.pdf
PDF 274 KB Posted
- Solicitation number
- MDT-315483-RP
- Issued by
- Montana
About this file
This Project Specific Agreement (PSA) is between the Confederated Salish and Kootenai Tribes and the Montana Department of Transportation for a Remote Weather Monitoring System Installation project. The project, named D1 RWIS Equipment Upgrades, is located on US 93 N at Reference Post 77.5, with a letting date in Fall 2023. The scope involves installing new equipment for a remote weather monitoring system, including a new 2" plastic conduit, 3 new AWG No 8 conductors, and modifications to an existing service assembly.
The agreement includes several key provisions, such as an Indian Preference Contracting fee of 3% to be collected by MDT and submitted to the Tribes, mandatory pre-construction conference attendance, and specific requirements for noxious weed prevention. The tribes will be invited to the pre-construction meeting, and the prime contractor can obtain construction materials from any lawful source. The project is part of a broader Memorandum of Understanding dated June 1, 2020, between the tribes and MDT, with specific cooperative efforts outlined to ensure compliance with Indian Preference laws and environmental regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Yellow Bay Plan.pdf | ||
| West Glacier Plan.pdf | ||
| Evaro Hill Plan.pdf | ||
| Bull Lake Plan.pdf | ||
| Fencing Detail Drawing.docx | DOCX document | |
| Elmo Plan.pdf | ||
| 1203012-event.pdf | ||
| St Regis Plan.pdf | ||
| Install New Roadway Information Systems (RWIS) Missoula District Specifications.docx | DOCX document | |
| US2-MT40 Plan.pdf | ||
| Cochise Plan.pdf | ||
| Bonner Plan.pdf | ||
| Electrical Detail Drawing.pdf | ||
| Davis Bacon Rates.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .