PS Schooner Landing~1.pdf
PDF 9 MB Posted
- Solicitation number
- S-KN0010-00005308
- Issued by
- Klamath County, Oregon
About this file
This document is the Contract Documents and Specifications for the Schooner Landing Sewer Bypass Project #2022-039, issued by the City of Newport, Oregon. The project consists of installing a pump station connected to an existing 8" sewer pipe, with a short force main and gravity overflow pipe discharging to a terminal manhole. From the terminal manhole, an 8" HDPE gravity sewer line will be installed and connected to an existing downstream manhole. Key items include furnishing and installing the pump station and accessories, a 48" diameter terminal manhole, 320 LF of 8" HDPE pipe, 20 LF of 2" HDPE force main, and 100 LF of 3" electrical conduit. Bids are due by 2:00 pm on January 24, 2023, and an optional pre-bid conference will be held on January 10, 2023. The work is to be substantially completed within 90 calendar days of the Notice to Proceed, and final completion within 120 calendar days.
The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Pricing is on a unit price basis, and the contract is subject to Oregon prevailing wage requirements. A 5% bid bond is required, as well as a 5% retainage on progress payments. No sales or use taxes apply, as Oregon has no such taxes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE CITY OF NEWPORT
NEWPORT, OREGON
O R EG O N
CONTRACT DOCUMENTS AND SPECIFICATIONS FOR
SCHOONER LANDING SEWER BYPASS
PROJECT
#2022-039
DECEMBER 22, 2022
Prepared By:
Chris Beatty, P.E.
(541) 5 7 4 - 3 3 7 6
169 SW Coast Highway
Newport, OR 97365
This page intentionally left blank.
TABLE OF CONTENTS
SCHOONER LANDING SEWER BYPASS PROJECT
#2022-039
PART 1: CONTRACT DOCUMENTS
BIDDING PHASE DOCUMENTS
C-111 ADVERTISEMENT FOR BIDS
C-200 INSTRUCTIONS TO BIDDERS
C-410 BID FORM
C-430 BID BOND (PENAL SUM)
C-440 FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM
C-451 QUALIFICATIONS STATEMENT
OWNER-CONTRACTOR AGREEMENT FORMS
C-510 NOTICE OF AWARD
C-520 AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT
(STIPULATED PRICE)
CONTRACT COMMENCEMENT DOCUMENTS
C-550 NOTICE TO PROCEED
C-610 PERFORMANCE BOND
C-615 PAYMENT BOND
CONTRACT ADMINISTRATION FORMS
C-620 CONTRACTORS APPLICATION FOR PAYMENT
C-625 CERTIFICATE OF SUBSTANTIAL COMPLETION
CONTRACT TERMS AND CONDITIONS
C-700 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT
C-800 SUPPLEMENTARY CONDITIONS
CONTRACT WORK ORDER FORMS
C-940 WORK CHANGE DIRECTIVE
C-941 CHANGE ORDER
C-942 FIELD ORDER
PART 2: TECHNICAL SPECIFICATIONS
Division 1 - General Requirements Section 011000 – Summary Section 013000 – Submittals Section 016600 – Testing and Startup
Division 31 – Earthwork
Section 312300 – Earthwork Section 312319 – Site Dewatering Section 312500 – Erosion Prevention and Sediment Controls
Division 32 – Site Work
Section 329200 – Seeding
Division 33 – Utilities
Section 330516 – Precast Concrete Structures Section 333113 – Piping and Accessories Section 333216 – Small Sewage Pumping Systems
Division 40 – Process Integration
Section 406300 – Pump Station Control
PART 3: CONSTRUCTION DRAWINGS
C-111 Advertisement for Bids
ADVERTISEMENT FOR BIDS
City of Newport
Lincoln County, Oregon
The City of Newport, OR (Owner) is requesting bids for the construction of the following project:
SCHOONER LANDING BYPASS PROJECT
Bids may be submitted in person, by mail, or electronically by emailing scanned documents to the following address:
Chris Beatty, PE Senior Project Manager City of Newport 169 SW Coast Highway Newport, OR 97365 c.beatty@newportoregon.gov
The envelope or body of the email shall plainly identify (1) the Project name, (2) the bidder name, and (3) the Bidder’s contractor’s license number. To ensure your bid is accepted in its entirety, please combine all documents into a single PDF file attached to your email. Bidders shall be responsible for calling the City office at 541-574-3376 before the proposal deadline to confirm the bid was received.
Scanned documents attached to the email shall include the Bid Form (P-400) and all forms identified in Article
6.01 of the Bid Form. A scanned copy of the fully executed bid bond is acceptable for bid submission.
Proposals must be received by the City by 2:00 pm, January 24, 2023 and then at said office publicly opened and read aloud. Bids received after this time will not be accepted. All interested parties are invited to attend the bid opening. Subcontractor declarations must be delivered to Owner as above no later than 4:00 p.m. on the day of the bid opening.
A brief description of the scope of work is provided below:
The sewer bypass-system project consists of the installation of a pump station that will be connect to an existing upstream 8” sewer pipe. Downstream from the pump station, a short force main and gravity overflow pipe will discharge to a terminal manhole. From the terminal manhole an 8” HDPE gravity sewer line will be installed and connected to an existing downstream manhole. The following are major items that are required to complete the project:
• Furnish and install one (1) prefabricated pump station and accessories.
• Furnish Extra Pump to the City of Newport for future use.
• Furnish and Install one (1) 48” diameter terminal manhole.
• Furnish and Install approx. 320 lineal feet of 8“ HDPE pipe.
• Furnish and Install approx. 20 lineal feet of 2” HDPE force main.
• Furnish and Install approx. 100 lineal feet of 3” electrical conduit.
• Trench excavation and backfill for piping.
• Excavation and backfill for structures.
• Concrete curb, AC Pavement, and landscaping removal and replacement.
• Connections to existing pipe and manhole mailto:c.beatty@newportoregon.gov
C-111 Advertisement for Bids
Bidding documents may be examined and downloaded at the OregonBuys website at: https://oregonbuys.gov/ following registration.
Pre-bid inquiries shall be directed to Chris Beatty, Senior Project Manager, at 541-574-3376 or c.beatty@newportoregon.gov
No bid will be considered unless fully completed in the manner provided in the Instructions to Bidders, and accompanied by a bid security, executed in favor of the Owner, in the amount not less than 10% of the total amount of the bid.
This contract is for public work and is subject to ORS 279C.800 to 279C.870 regarding prevailing wage rates.
Licensing under ORS 468A.710 is not required. The contracting agency may cancel the procurement or reject any or all bids in accordance with ORS 279B.100.
An optional pre-bid conference will be held at 2:00 p.m., January 10, 2023 at the Newport City Hall Council Chamber, 169 SW Coast Highway, Newport, OR 97365.
Dated this 22nd day of December, 2022. By order of: Chris Beatty, PE, Senior Project Manager
Advertisement Dates:
News Times (Newport): December 28, 2022 Daily Journal of Commerce (Portland): December 28, 2022 December 30, 2022 January 4, 2023 January 6, 2023 January 6, 2023 https://oregonbuys.gov/ mailto:c.beatty@newportoregon.gov
EJCDC® C-200, Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
INSTRUCTIONS TO BIDDERS
FOR CONSTRUCTION CONTRACTS
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Copyright © 2013:
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882 www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474 www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723 www.asce.org
The copyright for this EJCDC document is owned jointly by the three sponsoring organizations listed above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC documents; please direct all inquiries regarding EJCDC copyrights to NSPE.
NOTE: EJCDC publications may be purchased at www.ejcdc.org, or from any of the sponsoring organizations above.
http://www.nspe.org/ http://www.acec.org/ http://www.asce.org/ http://www.ejcdc.org/
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
INSTRUCTIONS TO BIDDERS
Page
Article 1 – Defined Terms
Article 2 – Copies of Bidding Documents
Article 3 – Qualifications of Bidders
Article 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 5 – Bidder’s Representations
Article 6 – Pre-Bid Conference
Article 7 – Interpretations and Addenda
Article 8 – Bid Security
Article 9 – Contract Times
Article 10 – Liquidated Damages
Article 11 – Substitute and “Or-Equal” Items
Article 12 – Subcontractors, Suppliers, and Others
Article 13 – Preparation of Bid
Article 14 – Basis of Bid
Article 15 – Submittal of Bid
Article 16 – Modification and Withdrawal of Bid
Article 17 – Opening of Bids
Article 18 – Bids to Remain Subject to Acceptance
Article 19 – Evaluation of Bids and Award of Contract
Article 20 – Bonds and Insurance
Article 21 – Signing of Agreement
Article 22 – Sales and Use Taxes
Article 23 – Contracts to be Assigned
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be administered is: City of Newport, 169 S.W. Coast Highway, Newport, Oregon 97365;
phone # (541) 574-3366.
B. Owner – City of Newport, Lincoln County, Oregon.
C. Engineer – Ken Condit, P.E., Harper Houf Peterson Righellis Inc., 205 Spokane Street, Suite 200, Portland, OR 97202, phone # 503-221-1131 (o) or 503-330-9978 (c).
D. Responsible (Bidder) - Meeting the requirements of ORS 279C.375 and OAR 137-049- 0390 .
E. Responsive – Having the characteristic of substantial compliance in all material respects with applicable solicitation requirements.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit written evidence such as previous experience, present commitments, and such other evidence as called out below.
A. Bidder shall submit a Statement of Qualifications with the Bid. Oregon Department of Transportation prequalification will not be accepted.
B. Statement of Qualifications shall show evidence of successful completion of at least three (3) similar projects in scope, size, complexity, and type within the last ten (10) years, and shall include owner references for said projects.
C. All Bidders must have a valid license from the Construction Contractors Board (CCB) and shall be capable of obtaining all required bonds and insurance.
D. ORS 279C.836 requires that all independent contractors working on qualifying public works projects, with a contract price that exceeds $100,000 must obtain and file with the Construction Contractors Board (CCB) a public works bond with a corporate surety authorized to do business in Oregon for the amount of $30,000 before starting work on a contract or subcontract for a public works project.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;
OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site. Such Reports include: No such information is available for this project.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). No such information is available for this project.
c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site. No such information is available for this project.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work; and
J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 An optional pre-bid conference will be held at 2:00 p.m., January 10, 2023, at the Newport City Hall Council Chamber, 169 SW Coast Highway, Newport, OR 97365. A Site
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5 visit is scheduled immediately following the pre-bid conference. Directions to the Site will be available at the pre-bid conference.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 Pre-bid inquiries shall be directed to Chris Beatty, PE, Project Manager, at 541-574-3376 or at c.beatty@newportoregon.gov
7.02 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.03 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten percent (10%) of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on form EJCDC C-430) issued by a surety meeting the requirements of Paragraphs 6.01 and
6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 Not Used.
12.02 Not Used.
12.03 In accordance with ORS 279C.370, when the contract value as estimated by the public contracting agency is more than $100,000, the Bidder must disclose first-tier subcontractors. Proposed first-tier subcontractors shall be listed on the form contained in these Contract Documents (Section 00440).
A. Form must be submitted to the location specified in the Invitation to Bid, on the advertised bid closing date, and within two (2) working hours after the bid closing time.
B. Bidder shall list on the Form; subcontractors that will be furnishing labor or will be furnishing labor and materials in connection with the public improvement contract;
and will have a contract value equal to, or greater than 5% of the total project bid or $15,000, whichever is greater, or $350,000 regardless of the percentage of the total project bid.
C. Failure to provide the First-Tier Subcontractor Disclosure Form will result in the bid being deemed non-responsive and a contract will not be awarded to that bidder.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 Bids submitted by corporations and partnerships shall be submitted as follows:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7
A. A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
B. A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown.
13.03 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign.
The state of formation of the firm and the official address of the firm shall be shown.
13.04 A Bid by an individual shall show the Bidder’s name and official address.
13.05 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
13.06 All names shall be printed in ink below the signatures.
13.07 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.08 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
13.09 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 [Deleted]
14.02 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8
ARTICLE 15 – SUBMITTAL OF BID
15.01 The Bidding Documents bound herein include all Bid Forms, Bid Security Forms, and Supplements to Bid Forms that are required. These Bidding Documents shall be bound together.
15.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.”
15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened. Facsimile (fax) or email bids will not be considered. Bids received after the bid due time will not be considered.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 Not Used.
16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner’s rights for evaluating bids and awarding contracts include:
A. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9
B. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible under ORS 279C.375.
C. Owner may reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder.
D. Owner reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
E. Owner may reject all bids for good cause if found to be in the public interest to do so.
F. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work. the right to waive all minor informalities not involving price, time, or changes in the Work.
19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
C. More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. When Bid Form has multiple schedules of Work, Bidder may Bid on one or more schedules.
D. If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project. Award will be identified by a Notice of Award within 60 calendar days of the Bid opening.
E. Any protests of award must be filed with the Owner within seven (7) calendar days from the Notice of intent to Award.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 10
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
Dates on the Agreement shall be filled in by the Owner so that required bonds may be properly dated.
ARTICLE 22 – SALES AND USE TAXES
22.01 The State of Oregon has no sales tax or use tax. Said taxes shall not be included in Bid.
ARTICLE 23 – RETAINAGE
23.01 In accordance with ORS 279C.550 through 279C.570, retainage will be withheld from progress payments at a rate of five percent (5%) of the value of work completed.
EJCDC® C-410, Bid Form for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, BID FORM
FOR CONSTRUCTION CONTRACTS
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
BID FORM
City of Newport Project # 2022-039
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page ii
Page
Article 1 – Bid Recipient
Article 2 – Bidder’s Acknowledgements
Article 3 – Bidder’s Representations
Article 4 – Bidder’s Certification
Article 5 – Basis of Bid
Article 6 – Time of Completion
Article 7 – Attachments to this Bid
Article 8 – Defined Terms
Article 9 – Bid Submittal
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
City of Newport, Chris Beatty, PE, Sr. Project Engineer 169 SW Coast Highway Newport, Oregon 97365
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
E. Bidder certifies that Bidder will comply with ORS 279C.838 or 279C.840 regarding prevailing wage rates.
F. Bidder ⃝ is ⃝ is not a resident bidder as defined in ORS 279A.120.
If not, provide State of residence:_______________
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
A. Unit Price Bid: City of Newport, Schooner Landing Sewer Bypass Project
5.02 Abbreviations used in Basis of Bid table
LS Lump Sum
LF Linear Foot
EA Each
SF Square Foot
TN Ton
SY Square Yard
HR Hour
AC Acre
5.03 Bidder agrees with all of Article 13.03 of the General Conditions
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6
BASIS OF BID TABLE
Bidder will perform the following work at the indicated unit prices:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7
Item No.
Description Unit Estimated Quantity
Bid Unit Price
Bid Price
Mobilization, Bonding, and Insurance
LS 1
2 Erosion Control LS 1
3 Traffic Control LS 1
4 Construction Surveying LS 1
Excavation – Wet Well, Terminal Manhole, Force Main, and Overflow Pipe
CY 40
Excavation – Sewer Pipe Trenches
CY 180
7 Excavation – 3” Conduit CY 30
Crushed Rock Backfill – Bedding, Pipe Zone, Trench, General
CY 240
Sawcut and Remove Existing
ACP
LS 1
ACP Replacement – 4” Thick Level 3 HMAC
TN 10
Crushed Rock Backfill Base and Leveling Course
CY 12
Concrete Curb Removal and Replacement
LS 1
13 Hydroseeding and Planting LS 1
Furnish, Inspect, Start Up & Test Pump Station Equipment
LS 1
Install Wet Well, Equipment, Controls, and Accessories
LS 1
Install Piping Connections to Wet Well
LS 1
17 Furnish Extra Pump to City EA 1
Furnish & Install 48” Manhole w/Flat Top, Base, and Grout Channel
LS 1
Core Drill and Modify Existing Manhole
LS 1
Furnish and Install Drop Assemblies, Kor-N-Seal Boots, and Accessories
LS 1
Furnish & Install 8” HDPE Sewer Pipe
LF 320
Furnish and Install 2” HDPE Force Main
LF 20
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8
Item No.
Description Unit Estimated Quantity
Bid Unit Price
Bid Price
Furnish and Install 3” Electrical Conduit
LF 100
24 Connect to Existing Sewer Pipes EA 1
25 Plug and Abandon 6” or 8” Pipe EA 3
Total of All Bid Items $
Total of All Bid Items (in words):
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security in the form of a Bid Bond (EJCDC No. C 430); and;
B. List of Proposed Subcontractors (First-Tier Subcontractor Disclosure Form (EJCDC No. C- 440)
C. Required Bidder Qualification Statement
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 9 – BID SUBMITTAL
This Bid is submitted by:
An Individual
Name (printed)
Attest:
[Signature]
[Printed name]
Title:
Submittal Date:
Address for giving notices:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9
Telephone Number:
Fax Number:
Contact Name and e-mail address:
Bidder’s License No.:
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address):
169 SW Coast Highway
Newport, Oregon 97365
BID
Bid Due Date: 2:00 pm, January 24, 2023
Description: SCHOONER LANDING SEWER BYPASS PROJECT
Newport, Oregon
BOND
Bond Number:
Date:
Penal sum $
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .