Addendum 1 Schooner Landing Sewer Bypass.pdf

PDF 227 KB Posted

Attached to
Sewer Bypass-system with Installation of Pump Station
Solicitation number
S-KN0010-00005308
Issued by
Klamath County, Oregon

About this file

This document is an Addendum to the Bid Form for the Sewer Bypass-System with Installation of Pump Station project in Lincoln County and Newberg City, Oregon. The project involves installing a pump station that will connect to an existing 8-inch sewer pipe, with a short force main and gravity overflow pipe discharging to a terminal manhole. From the terminal manhole, an 8-inch HDPE gravity sewer line will be installed and connected to an existing downstream manhole. The bid form lists 17 individual bid items, including furnishing and installing equipment, piping, and other infrastructure. Bidders must submit the required bid security, a list of proposed subcontractors, and a bidder qualification statement.

The bid prices are provided on a unit price basis for the estimated quantities of work. The contract includes provisions for substantial completion and final payment deadlines, as well as liquidated damages. Funding sources and requirements are not explicitly stated in the provided documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EJCDC® C-410, Bid Form for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6

BASIS OF BID TABLE (Revision #1)

Bidder will perform the following work at the indicated unit prices:

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7

Item

No.

Description Unit

Estimated

Quantity

Bid Unit

Price Bid Price

Mobilization, Bonding, and

Insurance

LS 1

2 Erosion Control LS 1

3 Traffic Control LS 1

4 Construction Surveying LS 1

Furnish & Install 48” Terminal

Manhole w/Flat Top, Base, and

Grout Channel. Includes

Excavation, Backfill, and

Surface Removal/Replacement

LS 1

Furnish, Inspect, Start Up &

Test Pump Station Equipment

LS 1

Install Wet Well, Equipment, Controls, and Accessories

LS 1

Install Piping Connections to

Wet Well. Includes Excavation, Backfill, and Surface Removal/

Replacement

LS 1

Furnish & Install 8” HDPE

Sewer Pipe by Directional

Drilling or Open Trench.

Includes Excavation, Backfill, and Surface

Removal/Replacement

Depending on Installation

Method

LF 320

Furnish and Install 2” Schedule

80 Force Main by Directional

Drilling or Open Trench.

Includes Excavation, Backfill, and Surface

Removal/Replacement

Depending on Installation

Method

LF 20

Furnish and Install 3” Electrical

Conduit by Directional Drilling or Open Trench. Includes

Excavation, Backfill, and

Surface Removal/ Replacement

Depending on Installation

Method

LF 100

Core Drill and Modify Existing

Manhole

LS 1

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8

Item

No.

Description Unit

Estimated

Quantity

Bid Unit

Price Bid Price

Furnish and Install Drop

Assemblies, Kor-N-Seal Boots, and Accessories

LS 1

14 Connect to Existing Sewer Pipes EA 1

15 Plug and Abandon 6” or 8” Pipe EA 3

16 Hydroseeding and Planting LS 1

17 Furnish Extra Pump to City EA 1

Total of All Bid Items $

Total of All Bid Items

(in words):

ARTICLE 6 – TIME OF COMPLETION

6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.

ARTICLE 7 – ATTACHMENTS TO THIS BID

7.01 The following documents are submitted with and made a condition of this Bid:

A. Required Bid security in the form of a Bid Bond (EJCDC No. C 430); and;

B. List of Proposed Subcontractors (First-Tier Subcontractor Disclosure Form (EJCDC No. C-

440)

C. Required Bidder Qualification Statement

ARTICLE 8 – DEFINED TERMS

8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 9 – BID SUBMITTAL

This Bid is submitted by:

An Individual

Name (printed)

Attest:

[Signature]

[Printed name]

Title:

Addendum #1
C-410 Bid Form - Addendum #1 (Condensed)

File details come from the government source that posted it. Updated .