PRS.docx
DOCX document 13 KB Posted
- Attached to
- USNS COMFORT (T-AH 20) Lifeboat Systems
- Solicitation number
- N3220522Q0120
About this file
This Performance Requirements Summary outlines the requirements for procuring Fassmer and Global Davit lifeboat systems for the USNS COMFORT (T-AH 20). Key performance standards include meeting the schedule for contract deliverables as outlined in the Performance Work Statement, successfully completing all testing with acceptance of results by the U.S. Coast Guard and ABS, and ensuring the accuracy of all manuals, operating procedures, technical documentation and other deliverables with no more than four errors per document. Lifeboat systems must also meet storage, outfitting and expiration date requirements for all associated equipment and provisions as defined in the Performance Work Statement. The Department of the Navy Military Sealift Command is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220522Q0120-0002.docx | DOCX document | |
| N3220522Q0120-0001.docx | DOCX document | |
| PWS.docx | DOCX document | |
| CSS.docx | DOCX document | |
| Technical Data Non-Disclosure.docx | DOCX document | |
| JA COMFORT Lifeboat System_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary (PRS) The performance standards for this PWS are stated in the PRS Below:
| Performance Objective and PWS Paragraph |
| Metric Type |
| Performance Standards* |
| Frequency |
| Acceptable |
Quality level
(AQL)
Method of Inspection /Surveillance Method
Para 14 POAM
Deliverables required by the Contract meet the schedule provided in the PWS.
| Schedule |
| Contract deliverables shall be submitted to the COR in accordance with the POAM times required by the PWS. |
| Continual |
| 100% of the deliverables are submitted on schedule. |
| COR Tracking |
Para 7 Testing
Successful completion of testing and the acceptance of the test results by Regulatory Bodies.
| Quality |
| Contractor shall successfully complete Testing and; gain USCG and ABS acceptance of the test results. |
| Continual |
| 100% of testing will be completed successfully on the first attempt with test results accepted by USCG and ABS. |
| COR |
Tracking / USCG and ABS acceptance of Test results.
Para 8 Manuals/Operating Procedures/Training and Attachment 2 of PWS
Accuracy of Deliverables Required by the Contract
| Quality |
| Material/Part Lists, Tech Manuals, Maintenance Plan and Other Deliverables associated with Para 8. |
| Continual |
| No more than 4 Errors per |
Deliverable
COR
Review for completion and accuracy
Para 10 (10.1 and 10.2) Delivery Requirements
Quality of Deliverables Required by the Contract submitted to MSC and to USCG and ABS approval.
| Quality |
| Reports, Drawings, Cost Estimates, and other Deliverables associated with Para 10.1 and 10.2. are Correct when submitted. |
| Continual |
| No more than 4 Errors per |
Deliverable
COR
Review for completion and accuracy
Para 10 (10.3) Lifeboat Systems
Contractor shall meet the requirements for storage, outfitting and expiration dates of associated equipment and provisions provided in the PWS.
| Quality |
| Reports, Drawings, Cost Estimates, and Deliverables are Correct when submitted. |
| Continual |
| No more than 4 Errors per |
Deliverable Inspection at storage location and delivery location.