This document is a Questions and Answers guide for the PROTECT Competitive Grant Program, updated September 25, 2026, administered by the Federal Highway Administration (FHWA) under the Infrastructure Investment and Jobs Act. The PROTECT program establishes federal grants to plan for and strengthen surface transportation resilience against weather events, natural disasters, and changing conditions including severe storms, flooding, drought, wildfire, sea level rise, extreme weather, and earthquakes.
Eligible applicants include units of local government, special purpose districts, and public authorities with transportation functions, including transit agencies and Indian Tribes. Federal Land Management Agencies may apply jointly only with State Departments of Transportation. Entities in U.S. Territories are eligible for Planning Grants, Resilience Improvement Grants, Community Resilience and Evacuation Routes Grants, and At-Risk Coastal Infrastructure Grants, though Territories are limited to At-Risk Coastal Infrastructure Grants. Grant recipients may subaward projects to other entities while retaining full responsibility for compliance. Joint applications are permitted with multiple eligible applicants, though only one designated lead applicant receives the award and manages funds. Eligible facilities include highways, public roads (both Federal-aid highways and local/rural roads), and State-owned forest roads, but exclude airport runways and automated people movers. Projects located on facilities not owned by the applicant require State DOT concurrence documentation.
Federal share requirements are 80% for Resilience Improvement Grants with 20% non-Federal match, while Indian Tribes and territories may request up to 100% Federal share. In-kind matching is allowable, and toll credits may be used toward match requirements. The 10% limitation on development phase activities for Resilience Improvement Grants applies separately from the 20% match requirement. Applicants must submit completed application templates (25-page limit) through Grants.gov by published deadlines. Projects in base floodplains require identification of the floodplain and documentation of implementation of risk mitigation plans under the Robert T. Stafford Act. Planning Grants may fund design and engineering activities without development phase limitations. The 40% new capacity limitation applies to construction of additional travel lanes but not drainage facility improvements. A 25% rural set-aside exists based on Census-defined urban areas. Award announcements for FY 2024-2026 are anticipated December 2026, with required funding obligation dates by September 30, 2025 through September 30, 2029 depending on fiscal year. Previously submitted applications from FY 2022-2023 and FY 2024-2025 are not carried forward and must be resubmitted under the FY 2024-2026 NOFO.
PROTECT NOFO QAs_2026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY24-FY26 PROTECT App Template-Resilience.docx | DOCX document | |
| FY24-FY26 PROTECT App Template-Planning.docx | DOCX document | |
| FY24-FY26 PROTECT NOFO-FHWA-PROT-26-001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROTECT Competitive Grant Program Notice Of Funding Opportunity
Questions & Answers
Updated September 25, 2026
The Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving Transportation (PROTECT) Formula and Competitive Grant Programs were established under section 11405 of the Infrastructure Investment and Jobs Act (IIJA) (Pub. L. No. 117-58, November 15, 2021), codified at 23 U.S.C. 176. The following Questions and Answers (Q&As) focus on the PROTECT Competitive Grant Program and the Notices of Funding Opportunity (NOFO) for Fiscal Years (FY) 2022-2023 (posted April 11, 2023) and FY 2024-2026 (revised version posted August 27, 2026, and replace the PROTECT NOFO Q&As dated December 17, 2024). Unless otherwise noted, references to “PROTECT Program” or “PROTECT grants” in this document refer to the PROTECT Competitive Grant Program.
Except for the statutes and regulations cited, the contents of this document do not have the force and effect of law and are not meant to bind the States or the public in any way. This document is intended only to provide information regarding existing requirements under the law or agency policies.
Eligible Applicants
1. Does the list of eligible applicants include regional councils or water and sewer authorities that manage pump stations to remove water from roadways?
Answer: Entities eligible to apply for a PROTECT Competitive Grant are statutorily defined under 23 U.S.C. 176 and include a unit of local government and a special purpose district or public authority with a transportation function. When applying for a PROTECT Competitive Grant, regional councils, water and sewer authorities, public authorities and other special purpose districts must demonstrate that they meet the eligibility criteria as a unit of local government or a special purpose district or public authority with a transportation function under 23 U.S.C. 176.
2. Are there conditions under which a grant recipient can subaward the project and its management?
Answer: An eligible entity selected to receive a PROTECT grant is the direct recipient of the grant funds. An eligible entity that receives a grant may choose to work with another entity using a contract or subaward to deliver the PROTECT project. The PROTECT grant recipient retains the responsibility for ensuring completion of the grant activities and for compliance with the terms and conditions of the grant award and Federal https://www.fhwa.dot.gov/environment/protect/discretionary/ requirements (2 CFR 200.332). Applicants should describe their proposed approach for implementing the project in their application.
3. Which Federal Land Management Agencies (FLMAs) can apply jointly with a State?
And what State Agencies are acceptable lead applicants?
Answer: The Federal Land Management Agencies (FLMAs) include: the Bureau of Indian Affairs, U.S. Forest Service, National Park Service, U.S. Fish and Wildlife Service, Bureau of Land Management, Bureau of Reclamation, and the Department of Defense, including the U.S. Army Corps of Engineers and Military Surface Deployment and Distribution Command (SDDC). For programs such as the PROTECT Competitive Grant Program administered under Title 23 of the United States Code, the term “State” means a State Department of Transportation (DOT). If an FLMA submits a joint application with an entity other than a State DOT, then the application would be ineligible for consideration for a PROTECT Competitive Grant. (23 U.S.C. 176(d)(2)(F)).
4. Are entities that are otherwise eligible under the PROTECT Competitive Grant
Program and located in a U.S. Territory eligible to apply for a grant?
Answer: Yes, otherwise eligible entities located in U.S. Territories are eligible to apply for Planning Grants, Resilience Improvement Grants, Community Resilience and Evacuation Routes Grants, and At-Risk Coastal Infrastructure Grants (23 U.S.C.
176(d)(2)). However, U.S. Territories are only eligible to apply for At-Risk Coastal Infrastructure Grants (23 U.S.C. 176(d)(4)(C)).
5. Are transit agencies eligible to apply directly for PROTECT grant funding?
Answer: Yes, entities eligible to apply for a PROTECT grant include a public authority with a transportation function. A transit agency is an eligible entity if it is an operator of a public transportation facility or service eligible under Chapter 53 of Title 49, which means a facility or service that provides regular, continuing shared-ride surface transportation service that is open to the general public or open to a segment of the general public defined by age, disability, or low income. See 49 U.S.C. 5302(15).
6. Please explain the correct meaning of a special purpose district or public authority with a transportation function.
Answer: A “public authority” means a Federal, State, county, town, or township, Indian tribe, municipal or other local government or instrumentality with authority to finance, build, operate, or maintain toll or toll-free facilities. (23 U.S.C. 101(a)(22)). If a special purpose district applies for a PROTECT grant it should include appropriate documentation that it was established in accordance with applicable State law.
7. Can joint applications be submitted?
Answer: Yes. However, if an application has joint applicants each applicant must be an eligible applicant. Only one entity can be the recipient. The application should identify the eligible lead applicant who will be the recipient of the grant funds if the project is selected for an award. The lead applicant will be responsible for financial administration of the project and will be the recipient of the PROTECT Competitive Grant Program award. For example, non-profit organizations are not eligible applicants and therefore cannot be a lead or joint applicant but can be identified in an application as a having a role in the delivery of the project. Joint applications should include a description of the roles and responsibilities of each joint applicant and should be signed by, or include a letter of support from, each applicant. In addition, the application should describe in detail all of the other public and private parties who are involved in delivering the project, including a specific description of the role of each entity in delivering the project.
Eligible Facility
8. Are Federally owned and maintained roads, parking lots and lands eligible for funding under this NOFO?
Answer: Federally owned facilities may be eligible for funding under this NOFO if the application is submitted by an eligible applicant and the proposed project meets the eligibility requirements of one of the funding categories under Section B of the NOFO.
FHWA will review project specific information provided in an application to make an eligibility determination.
9. In identifying eligible highway projects, the law refers to “highway projects eligible for assistance under Title 23, U.S.C.” What type of highway projects does this include?
Answer: PROTECT funds can be used on public roads for eligible highway projects identified in 23 U.S.C. 176. An eligible highway facility can be determined by looking at the definition of “highway” in 23 U.S.C. 101(a)(11). Under this definition, a highway project is (A) located on a road, street, or parkway, (B) includes right-of-way, a bridge, a railroad-highway crossing, a tunnel, a drainage structure including public roads on dams, a sign, a guardrail, and a protective structure, in connection with a highway, or (C) a portion of any interstate or international bridge or tunnel and the approaches thereto, the cost of which is assumed by a State transportation department, including such facilities as may be required by the United States Customs and Immigration Services in connection with the operation of an international bridge or tunnel. Upon determining the facility is eligible for funding, then PROTECT-eligible activities may be identified for that facility.
If Title 23 funds could be spent (or have been spent) for an eligible project on the highway, then the highway is eligible for PROTECT funds for eligible activities under that program.
PROTECT grant funds may be used for an eligible purpose on a public road that is (1) a Federal-aid highway (as defined in 23 U.S.C. 101(a)(6)), or (2) other than a Federal-aid highway (including highways functionally classified as local roads or rural minor collectors). A “public road” means any road or street under the jurisdiction of and maintained by a public authority and open to public travel (23 U.S.C. 101(a)(23)).
10. Is a public road that is not a public highway, located within a State-owned and managed forest, an eligible facility?
Answer: Yes. PROTECT Competitive Grant funds may be used for an eligible PROTECT project located on a public road that is (1) a Federal-aid highway (as defined in 23 U.S.C. 101(a)(6)), or (2) other than a Federal-aid highway (including highways functionally classified as local roads or rural minor collectors). A “public road” means any road or street under the jurisdiction of and maintained by a public authority and open to public travel (23 U.S.C. 101(a)(23)).
11. Would an airport runway or an airport Automated People Mover electric train system be eligible for a PROTECT grant?
Answer: No. Neither an airport runway nor an airport automated people mover electric train system would be an eligible project under the PROTECT Competitive Grant Program. The purpose of this grant program is to plan for and strengthen surface transportation to be more resilient to current and future weather events, natural disasters, and changing conditions, such as severe storms, flooding, drought, levee and dam failures, wildfire, rockslides, mudslides, sea level rise, extreme weather, including extreme temperature, and earthquakes. Generally, activities located within the boundary of an airport facility are not considered surface transportation. However, this does not preclude an eligible applicant from submitting an application for an eligible activity on an eligible facility located adjacent to an airport facility.
12. If the application includes a planning or resilience improvement project on a State-owned and maintained road, would a letter of support be required when submitting the grant application?
Answer: If an eligible applicant submits an application for an eligible activity on an eligible facility that it does not own or have jurisdiction over, documentation of consultation with the State DOT including the State DOT’s concurrence to carry out the proposed project on its facility must be submitted with the application. If the project selected to receive a PROTECT grant is a construction project, the applicant must ensure that all Federal and State required approvals are met before FHWA will obligate funds to the project.
Applications
13. What does the 25-page project narrative limit refer to?
Answer: The 25-page project narrative limit refers to the Application Template.
Applicants must complete one of the PROTECT Competitive Grant Program Application Templates (either the Planning Grant Template or Resilience Grant Template) and include it as an attachment to Item 15 of their SF-424. The Application Template, when completed, should not exceed 25 pages.
FHWA will only review the completed Application Template and the allowable supplemental documents (e.g., budget, schedule, design plans, project location map, etc.)
specified within the Application Template instructions.
14. Can PROTECT grant funds be used to replace gas or diesel vehicles with electric bikes, scooters, and vehicles?
Answer: No. Replacing gas or diesel vehicles with electric bikes, scooters, and vehicles is not consistent with the purpose of the PROTECT Competitive Grant Program which is to plan for and strengthen surface transportation to be more resilient to current and future weather events, natural disasters, and changing conditions, such as severe storms, flooding, drought, levee and dam failures, wildfire, rockslides, mudslides, sea level rise, extreme weather, including extreme temperature, and earthquakes.
15. Can an eligible entity submit one application for a project that has more than one component with independent utility?
Answer: Yes. FHWA strongly encourages applicants to identify in their applications the project components that have independent utility and detail costs and requested PROTECT grant funding for those components separately. If the application identifies one or more independent project components, the application should clearly identify how each independent component addresses the selection criteria in Section F of the NOFO in addition to describing how the full proposal, of which the independent component is a part, addresses selection criteria. Each component must meet the FHWA National Environmental Policy Act (NEPA) requirements with respect to independent utility.
Independent utility means that the component will represent a transportation improvement that is usable and represents a reasonable expenditure of FHWA funds even if no other improvements are made in the area and will be ready for intended use upon completion of that component's construction. All project components that are presented together in a single application should demonstrate a relationship or connection between them.
16. Can project development planning be included with an application for a Resilience
Improvement Grant?
Answer: Yes. PROTECT Resilience Improvement Grants may be used for development phase and construction phase activities of the same project. However, no more than 10% of a Resilience Improvement Grant may be used for project development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, preliminary engineering and design work, and other preconstruction activities (See Section B.2. of the NOFO: Limitations on Awards). Applicants requesting a grant for pre-construction and construction activities for the same project should submit one application for the entire project.
17. Can an eligible entity submit more than one application for different projects?
Answer: Yes. Eligible entities may submit multiple applications, but only one application may be submitted per project.
18. Can an eligible entity submit a project for multiple grant funding categories?
Answer: Yes. Applicants may use one application to submit the same project for multiple grant categories if the project meets the eligibility criteria for multiple categories. For example, a project to improve resilience of a coastal evacuation route could be eligible under all three Resilience Grant categories. Applicants would need to be sure to submit all the information needed for each category under which they are applying and are encouraged to use the appropriate application template for each category. Applicants should indicate which grant category or categories they are applying. However, FHWA reserves the discretion to determine which funding category from which to make an award for a project, including a category for which the applicant did not apply. The technical merit criteria remain the same across the three Resilience Grant categories, but the funding amounts vary. FHWA may award a project under a different Resilience Grant category to meet funding requirements.
Resilience Improvement Plans
Please see the Resilience Improvement Plan Questions and Answers, available at https://www.fhwa.dot.gov/environment/protect/rip/
Federal Share and Match Requirements
19. In general, for Resilience Improvement Grants, there is an 80% Federal and 20% non-Federal match requirement. There is also a 10% limitation on the amount of PROTECT grant funds that may be used for eligible project development (pre-construction) activities associated with a resilience improvement project. Does the 20% match requirement apply to the overall total project (pre-construction plus construction) cost or is a 20% match required for pre-construction costs and then another 20% match for construction costs?
Answer: The 20% non-Federal match requirement applies to the total project cost. A grant recipient may use up to 10% of PROTECT grant funds to fully fund eligible pre-https://www.fhwa.dot.gov/environment/protect/rip/ construction activities as long as the recipient satisfies the non-Federal match requirement applicable to the total project cost prior to project close out.
20. Is in-kind matching allowable for the non-Federal match?
Answer: Yes. In-kind matching may be used toward the non-Federal match requirement, as long as the requirements of 2 CFR 200.306 and 2 CFR 200.434 are met. The USDOT’s Understanding Non-Federal Match Requirements webpage also provides information related to non-Federal match: https://www.transportation.gov/grants/dot-navigator/understanding-non-federal-match-requirements.
21. Can an Indian Tribe request 100 percent Federal share for a project?
Answer: Yes. An Indian Tribe (as defined in 23 U.S.C. 207(m)(1)) applying for a Resilience Improvement Grant, Community Resilience and Evacuation Route Grant, or At-Risk Coastal Infrastructure Grant, can request up to 100 percent Federal share. (23 U.S.C. 176(d)(5)(E)(ii)(II)). Applications from Indian Tribes must specify what Federal share they are requesting for the project.
22. If an Indian Tribe is a joint applicant on an application where another entity is the lead, would the project qualify for 100% Federal share?
Answer: No. For consideration whether the Federal share of an eligible Resilience Improvement project, Community Resilience and Evacuation Route project, or At-Risk Coastal Infrastructure project may be up to 100%, an Indian Tribe (as defined under 23 U.S.C. 207(m)(1)) must be the lead applicant and must also be the recipient of the PROTECT grant funds.
23. What is the Federal share for projects carried out in the U.S. Virgin Islands, Guam, American Samoa, or the Commonwealth of the Northern Mariana Islands?
Answer: In accordance with 23 U.S.C. 120(g), the Federal share for a PROTECT project carried out in the Virgin Islands, Guam, American Samoa, or the Commonwealth of the Northern Mariana Islands, the Federal share is 100% of the total cost of the project. (23 U.S.C. 120(g)).
24. Can toll credits be used for the non-Federal match?
Answer: A State may use toll credits toward the non-Federal share requirement for PROTECT Discretionary Grant funds. States should refer to 23 U.S.C. 120(i) for the requirements governing the use of toll credits. Please reference Federal-Aid Guidance Non-Federal Matching Requirements at https://www.fhwa.dot.gov/legsregs/directives/policy/fedaid_guidance_nfmr.pdf for additional information.
https://www.transportation.gov/grants/dot-navigator/understanding-non-federal-match-requirements https://www.transportation.gov/grants/dot-navigator/understanding-non-federal-match-requirements https://www.fhwa.dot.gov/legsregs/directives/policy/fedaid_guidance_nfmr.pdf
Benefit Cost Analysis (BCA)
25. What resources are available to assist with the BCA?
Answer: The FHWA PROTECT Resources page provides a list of resources on BCA at https://www.fhwa.dot.gov/environment/protect/resources/ under “Benefit-Cost Analysis Resources”. The page includes a new FHWA resource titled “Best Practices for Resilience Investment Benefit-Cost Analysis” (June 2026). This FHWA document provides additional information and resources for analysts completing a BCA for resilience investment. The resource expands on several topics covered in the U.S. DOT Benefit-Cost Analysis Guidance for Discretionary Grant Programs, but it does not supersede or have any effect on that resource.
26. When does a project need to be included in a Resilience Improvement Plan to receive priority consideration without submittal of a BCA?
Answer: The project should be on the applicable Resilience Improvement Plan prior to the NOFO application deadline in order to waive the need for a BCA to receive priority for Resilience Improvement Grants. FHWA considers proposed grant projects to be "on the applicable Resilience Improvement Plan" if the project is on a list within the Resilience Improvement Plan or the project is identified in a vulnerable area on a map (and the project is clearly labeled and identified). The Resilience Improvement Plan should convey basic project details. The applicant would need to submit the applicable State DOT or MPO Resilience Improvement Plan with their application to receive the priority consideration.
27. What are appropriate support data sources for Indian Tribes in place of the BCA?
Answer: Information on the data necessary for a benefit cost analysis are available in the USDOT Benefit-Cost Analysis Guidance for Discretionary Grant Programs at https://www.transportation.gov/mission/office-secretary/office-policy/transportation-policy/benefit-cost-analysis-guidance. BCA support data sources could include data sources on Average Annual Daily Traffic (available through the Highway Performance Monitoring System at https://www.fhwa.dot.gov/policyinformation/hpms/shapefiles.cfm), Crash Modification Factors (available through the Crash modification Factors Clearinghouse at https://www.cmfclearinghouse.org/), Fatal Crash Data by Roadway (available through the Fatality Analysis Reporting System at https://cdan.dot.gov/query), Bridge Condition (available through InfoBridge at https://infobridge.fhwa.dot.gov/Data), and Population Changes (available through the Census at https://www.census.gov/quickfacts/fact/table/US/PST045222).
28. Are the additional co-benefits of nature-based components (e.g., habitat, recreational and educational opportunities) allowed to be included in the BCA?
Answer: The USDOT BCA guidance does not provide a general methodology for calculating non-transportation benefits of nature-based transportation solutions, but it https://www.fhwa.dot.gov/environment/protect/resources/ https://www.fhwa.dot.gov/policy/otps/Best_Practices_for_Resilience_Investment_BCA.pdf https://www.fhwa.dot.gov/policy/otps/Best_Practices_for_Resilience_Investment_BCA.pdf https://www.transportation.gov/mission/office-secretary/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.transportation.gov/mission/office-secretary/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.transportation.gov/mission/office-secretary/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.fhwa.dot.gov/policyinformation/hpms/shapefiles.cfm https://www.fhwa.dot.gov/policyinformation/hpms/shapefiles.cfm https://www.fhwa.dot.gov/policyinformation/hpms/shapefiles.cfm https://www.cmfclearinghouse.org/ https://www.cmfclearinghouse.org/ https://www.cmfclearinghouse.org/ https://cdan.dot.gov/query https://cdan.dot.gov/query https://infobridge.fhwa.dot.gov/Data https://infobridge.fhwa.dot.gov/Data https://www.census.gov/quickfacts/fact/table/US/PST045222 https://www.census.gov/quickfacts/fact/table/US/PST045222 does provide some information regarding wildlife impacts and stormwater runoff reduction, which some nature-based solutions may provide. In cases where a nature-based solutions may provide additional benefits for which there is not a standard methodology outlined in the USDOT BCA guidance, applicants should provide a detailed qualitative description of the baseline conditions and the impacts due to the project.
Nonmarket benefits will be considered, but the impacts should be tied directly to the project itself. In addition, the applicant should provide a qualitative description of the baseline and the impact due to the project. A quantitative analysis may be considered, but the methodology should be justified using a published methodology or approach.
Eligible Activities
29. Would a project to realign a road and add height to bring it out of the floodplain be eligible for a PROTECT grant?
Answer: Yes. The relocation of a road in a base floodplain to higher ground above projected flood elevation levels is an eligible Resilience Improvement activity. The application should include the best available understanding of risks, impacts, and vulnerabilities pertaining to the location of the current road and the proposed area of realignment. Any project that encroaches a floodplain must comply with 23 CFR
650.111. Note that if any of part of the project is proposed to be carried out, in whole or in part, within a base floodplain, under 23 U.S.C. 176(d)(5)(B)(ii) the application must include the following:
1. Identification of the floodplain in which the project is to be located and disclosure of that information to the USDOT Secretary in the application; and
2. Indication, whether, if selected, the eligible entity will implement one or more components of the risk mitigation plan under section 322 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. § 5165) with respect to the area.
See “Statutory Requirements for Resilience Projects in Floodplains” section below for more information.
30. Is the expansion or construction of a roadway to improve traffic during an emergency evacuation an eligible activity?
Answer: Yes, if the following two conditions are met:
(1) The evacuation route must be designated by the eligible entity to apply for a PROTECT Competitive Grant with jurisdiction over the area in which the route is located. For purposes of the PROTECT Competitive Grant Program, “evacuation route” means a transportation route or system that is owned, operated, or maintained by a Federal, State, Tribal, or local government used to transport the public away from emergency events or to transport emergency responders and recovery resources, and is designated by the eligible entity with jurisdiction over the area (23 U.S.C. 176(a)(2)); and
(2) In the application for a Community Resilience and Evacuation Route Grant, the eligible entity must notify the USDOT Secretary that the existing evacuation route is not sufficient to adequately facilitate evacuations including the transportation of emergency responders and recovery resources. The notification should be data driven and evidence based, supporting the need for additional evacuation facilities, and aligning with the purpose and definition of evacuation routes. (23 U.S.C. 176(d)(4)(B)(ii)(II)). For additional information, see “Criteria” section below.
31. Would purchase of Intelligent Transportation Systems focused on freight mobility to reduce congestion be eligible for a PROTECT Grant?
Answer: No, if the sole purpose of a project is to reduce congestion and freight delays, it would not be an eligible activity under the PROTECT Competitive Grant Program. The purpose of the PROTECT Program is to plan for and strengthen surface transportation to be more resilient to current and future weather events, natural disasters, and changing conditions, such as severe storms, flooding, drought, levee and dam failures, wildfire, rockslides, mudslides, sea level rise, extreme weather, including extreme temperature, and earthquakes. Each of the four PROTECT Competitive Grant funding categories have specific project eligibilities to achieve this purpose. If an application is submitted for a PROTECT Competitive Grant, the applicant would have to demonstrate how use of the PROTECT Competitive Grant funds for an Intelligent Transportation System focused on freight mobility to reduce congestion is eligible under one of the four grant funding categories and meets the purpose of the PROTECT Competitive Grant Program.
32. Would a project to purchase and install a flood warning system with automated gates to close a roadway or underpass that is subject to flooding be eligible for PROTECT Grant funds?
Answer: It depends. Flood warning systems with automated gates may be eligible activities under the Community Resilience and Evacuation Route Grants. PROTECT Competitive Grants support the cost of making surface transportation assets more resilient to current and future weather events, natural disasters, and changing conditions, such as severe storms, flooding, drought, levee and dam failures, wildfire, rockslides, mudslides, sea level rise, extreme weather, including extreme temperature, and earthquakes. A flood warning system with automated gates could be eligible to the extent the system makes the asset more resilient. To the extent that the primary purpose of a project is to address resilience, it could be eligible to be fully funded (up to the applicable Federal share) (see “Resilience Costs” section below). However, other project components that are not inherently resilience-focused should generally be funded from other sources, including other Title 23 programs. FHWA will review project specific information provided in an application to make an eligibility determination. Please see Community Resilience and Evacuation Route Grants Section B for eligible activities.
33. Is the construction of microgrids for resilience purposes eligible under the Resilience Improvement Grant or Community Resilience and Evacuation Route Grant categories?
Answer: It depends. The purpose of the PROTECT Competitive Grant Program is to plan for and strengthen surface transportation to be more resilient to current and future weather events, natural disasters, and changing conditions, such as severe storms, flooding, drought, levee and dam failures, wildfire, rockslides, mudslides, sea level rise, extreme weather, including extreme temperature, and earthquakes. Each of the four PROTECT Competitive Grant funding categories have specific project eligibilities to achieve this purpose. If an application is submitted for a PROTECT Competitive Grant, the applicant would have to demonstrate (1) the transit microgrids are eligible as a public transportation facility or service eligible for assistance under Chapter 53 of Title 49, U.S.C., and (2) the proposed project is eligible under one of the funding categories described in Section B of the NOFO.
34. What is considered to be “new capacity” subject to the 40% limitation? Would
PROTECT Grant funding only support 40% of a project’s construction cost?
Answer: An eligible entity that receives a Resilience Grant may not use more than 40% of the amount of the grant for the construction of new capacity. (23 U.S.C.
176(d)(5)(G)(i)(I)). For purposes of the PROTECT Competitive Grant Program, “capacity” generally refers to the ability of a road to accommodate traffic volume. “New capacity” means constructing additional travel lanes (such as general purpose lanes or managed lanes or high occupancy vehicle lanes). The limitation, however, does not apply to adding hydraulic capacity to culverts or other drainage facilities. The balance of the grant funds could be used for other eligible activities under the applicable grant for a Resilience Improvement, Community Resilience and Evacuation Route, or At-Risk Coastal Infrastructure project.
35. What is considered an existing evacuation route under the PROTECT Competitive
Grant Program? Would a roadway have to be designated as an Evacuation Route to be eligible?
Answer: An existing evacuation route means a route that is in operation and open to public travel. To be eligible to receive a PROTECT Community Resilience and Evacuation Route Grant, the route must have been designated as an evacuation route by the eligible entity with jurisdiction over the area in which the route is located.
36. For At-Risk Coastal Infrastructure Grants, would projects along the Intracoastal
Waterway be eligible?
Answer: Yes, the Intracoastal Waterway is a tidal area connected to the Atlantic Ocean and projects along the waterway may be eligible for At-Risk Coastal Infrastructure grants. (23 U.S.C. 176(d)(4)(C)(i)(I). FHWA will review project specific information provided in an application to make an eligibility determination.
37. Can you apply for design and engineering funding for a specific roadway project within the Planning Grant category?
Answer: Yes, project planning activities are eligible under the PROTECT Planning Grants. This may include the costs of eligible project development phase activities, including planning, feasibility analysis, revenue forecasting, environmental review, preliminary engineering and design work, other preconstruction activities, and other activities consistent with the purpose of a planning grant under 23 U.S.C. 176(d)(3). (23 U.S.C. 176(d)(5)(F)(ii)). Planning Grants are not subject to the 10 percent limitation on development phase activities.
38. Could a project be selected for an award if it does not meet any of the priority selection considerations?
Answer: It depends. As described in Section F of the NOFO, FHWA will apply the priority considerations to select among projects with similar merit. An application may be determined eligible to proceed to the technical review and may be rated highly recommended or recommended; however, if the proposed project does not meet one or more of the priority considerations it will not be as competitive as other applications that are more responsive to the priority selection considerations.
Rural Set-Aside
39. PROTECT Competitive Grants have a 25% rural set-aside, a project will be designated as rural if it is located outside of an urban area with a population greater than 200,000. Does the PROTECT Program use the Census urban and rural boundaries or does this program use the FHWA adjusted urban boundaries to make that determination?
Answer: FHWA is using the Census-defined urban areas. To determine whether a project is within a rural area, an eligible entity may use the U.S. Census Bureau population data or FHWA’s urban boundaries maps available at https://hepgis-usdot.hub.arcgis.com/pages/036f196d89d94e899ed27b0cb40f34de, which were developed to correlate with the definition of urbanized area under Title 23 of the United States Code.
Resilience Costs
40. Can PROTECT funding be used for the entire Federal share of an eligible project?
Answer: Yes, if the eligible purpose of the project is primarily for resilience. This means the scope of the entire project is eligible for a PROTECT Competitive Grant. The amount of the Federal share is calculated based on the total project cost of the entire eligible project.
https://hepgis-usdot.hub.arcgis.com/pages/036f196d89d94e899ed27b0cb40f34de https://hepgis-usdot.hub.arcgis.com/pages/036f196d89d94e899ed27b0cb40f34de
A PROTECT project can be found to have a primary purpose for resilience if it better anticipates, prepares for, and adapts to changing conditions and withstands and responds to disruptions; and is better able to continue to serve the primary function of the project during and after weather events and natural disasters for the expected life of the project;
or it reduces the magnitude and duration of impacts of current and future weather events and natural disasters to a project; or it has the absorptive capacity, adaptive capacity, and recoverability to decrease project vulnerability to current and future weather events or natural disasters. (23 U.S.C. 176(a)(4))
Only costs that are necessary, reasonable, and allocable to the eligible project would be eligible to be fully funded up to the applicable Federal share.
41. What factors can be considered when determining whether an eligible project is primarily for the purpose of resilience?
Answer: Factors that could demonstrate that the primary purpose of an eligible project as a whole is resilience include, but are not limited to:
• Design that accommodates sea level rise.
• Design that accommodates increased flood levels.
• Upgrades that are intended to meet or exceed design standards adopted by FHWA
(or promulgated in law) that address natural hazard resilience.
• Seismic retrofitting.
• Purpose of the project as defined in project development (such as the Purpose and
Need) or planning documents.
• Project contained in a Resilience Improvement Plan, or similar.
• Project addresses natural hazard risks identified in an asset management plan.
Criteria
42. How should an applicant notify the USDOT Secretary of insufficient evacuation routes?
Answer: In an application for a Community Resilience and Evacuation Route Grant, the applicant should clearly state that, through the application, they are notifying the Secretary that the existing evacuation route is not sufficient to adequately facilitate evacuations including the transportation of emergency responders and recovery resources. Data-driven evidence should be included with the application to explain why the existing route is not sufficiently adequate and how capacity expansion of the evacuation route will swiftly and safely accommodate evacuations.
Funding
43. Is there a projected timeline for award of funds or maximum allowable timeframe for expenditure of grant funds?
Answer: The announcement of projects selected to receive an FY 2024-2026 PROTECT Competitive Grant is anticipated to be made in December 2026 Notification that a project has been selected to receive a PROTECT grant does not mean an award has been made.
PROTECT funds will be awarded upon the execution of a grant agreement.
Each fiscal year of funding has a required funding obligation date as noted in the table below. Obligation of a PROTECT Competitive Grant Program grant occurs when the selected applicant enters a grant agreement with the FHWA. Grant agreements are executed when there is an accurate cost estimate for the funded project or phase of the project and that project or phase of the project is ready to begin.
Fiscal Year Funding Funding Obligation Date 2022 September 30, 2025 2023 September 30, 2027 and September 30, 20311 2024 September 30, 2027 2025 September 30, 2028 2026 September 30, 2029
The deadline for expenditure of grant funds will be documented in the grant agreement depending on the fund source.
Other
44. Are letters of support needed from entities or stakeholders that do not have a substantive role in the project?
Answer: No, letters of support for a project are not required from entities and stakeholders that do not have a substantive role in the delivery of the project. However, applicants should describe in detail all the other public and private parties who are involved in delivering the project, including a specific description of the role of each entity in delivering the project.
If an applicant provides letters of support or other supporting documentation, it must be submitted as part of the application package through Grants.gov. FHWA will not review supplemental materials other than those submitted through Grants.gov. All application
1 Section 3104 of the Continuing Appropriations and Extensions Act, 2027 (Pub. L. No. 119-103) made contract authority for FY23 PROTECT competitive grants available for obligation until September 30, 2027. Section 127 of the Transportation, Housing and Urban Development, and Related Agencies Appropriations Act, 2026 (division D of Pub. L. No. 119-75) made budget authority for FY23 Resilience Improvement Grants and At-Risk Coastal Infrastructure Grants available for obligation until September 30, 2031.
materials, including letters of support, must be submitted to Grants.gov by the application deadline.
FY 2022-2023 NOFO
45. Where can I find information about awards under the FY 2022-2023 PROTECT Competitive Grant awards?
Answer: Information on awards for the FY 2022-2023 PROTECT Competitive Grant Program are available at:
https://www.fhwa.dot.gov/environment/protect/competitive/grant_recipients/.
Resubmission of Applications
46. Can previously submitted PROTECT grant applications that were not selected to receive an award be resubmitted?
Answer: Yes, applicants who are planning to re-apply using materials prepared for prior competitions should ensure that their application fully addresses the criteria and considerations described in the FY 2024 – FY 2026 NOFO and that all relevant information is up to date.
Applicants must resubmit the application. FHWA will not carry over applications from the FY 2022-2023 PROTECT Competitive NOFO into the FY 2024-2026 application period.
47. Can recipients who have completed project activities covered by a PROTECT grant award apply for additional activities that are related to the overall project that has been funded?
Answer: Yes. However, to be competitive, the applicant should demonstrate the extent to which the previously funded project phase has met estimated project schedules and budget. A previous PROTECT award, or application, does not affect competitiveness under the FY 2024 – 2026 NOFO competition.
48. Will applications previously submitted for the FY 2024 and 2025 NOFO before the original deadline of February 24, 2025 be considered?
Answer: Applications for the FY 2024 and FY 2025 NOFO (released October 25, 2024) and submitted prior to the original deadline of February 24, 2025 will not be considered, and all applicants must reapply under the revised FY 2024-2026 NOFO dated August 27, 2026.
Statutory Requirements for Resilience Projects in Floodplains
49. What type of information is required to be included in an application if a project is located in a floodplain?
Answer: The PROTECT Competitive Grant Program requires applicants to provide two pieces of information in an application for a project located (in whole or in part) in a base floodplain.
1) As part of the application, applicants must identify the floodplain in which the project is located and disclose that information to the USDOT Secretary in the application (23 U.S.C. 176(d)(5)(B)(ii)(I)). The base floodplain includes the area subject to flooding by the base flood, which is a flood or tide having a 1-percent chance of being exceeded in any given year (23 CFR 650.105(b-c)). Any project that encroaches a floodplain must comply with 23 CFR 650.111. Base floodplain information may be available through various sources, including the Federal Emergency Management (FEMA) National Flood Hazard Layer Viewer (https://www.fema.gov/flood-maps/national-flood-hazard-layer) or Flood Map Service Center (https://msc.fema.gov/portal/home), or information developed by the highway agency, if National Flood Insurance Program (NFIP) maps are not available.
2) Indicate in the application, whether, if selected, the eligible entity will implement one or more components of the risk mitigation plan under section 322 of the Robert T.
Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. § 5165) with respect to the area. (23 U.S.C. 176(d)(5)(B)(ii)(II). For example, this can include a description of how applicable State or local hazard mitigation plans address flooding risks to the area in which the project is located. More information on State and local hazard mitigation plans can be found at https://www.fema.gov/emergency-managers/risk-management/hazard-mitigation-planning.
To assist FHWA’s application intake and eligibility review to determine compliance with 23 U.S.C. 176(d)(5)(B)(ii), FHWA encourages all applicants to indicate whether or not a project is located in whole or in part in a base floodplain.
https://www.fema.gov/flood-maps/national-flood-hazard-layer https://msc.fema.gov/portal/home https://www.fema.gov/emergency-managers/risk-management/hazard-mitigation-planning https://www.fema.gov/emergency-managers/risk-management/hazard-mitigation-planning
| Eligible Applicants |
| Eligible Facility |
| Applications |
| Resilience Improvement Plans |
| Federal Share and Match Requirements |
| Benefit Cost Analysis (BCA) |
| Eligible Activities |
| Rural Set-Aside |
| Resilience Costs |
| Criteria |
| Funding |
| Other |
| FY 2022-2023 NOFO |
| Resubmission of Applications |
| Statutory Requirements for Resilience Projects in Floodplains |
File details come from the government source that posted it. Updated .