The document is a Proposal Cost Form (Attachment B) for the Winter Weather Supply and Storage Building project for Clayton County, Georgia, solicited through RFP #23-256. The form is a comprehensive cost breakdown template designed to capture project expenses across multiple phases including Schematic Design, Design Development, Construction Documents, Bid/Negotiation, and Construction Administration. The form allows for detailed cost tracking across various project components such as insurance, general conditions, administrative costs, and specific construction elements like foundation, concrete, structural, electrical, plumbing, HVAC, doors, carpentry, and equipment.

The cost form includes a critical note specifying that the total project cost must encompass all labor, materials, equipment, tools, supervision, scheduling, safety program, coordination, engineering, testing, surveys, layout, cleanup, and other services required to complete the entire project. The form requires the proposer to complete the cost breakdown, sign, and date the document, with a clear indication that all permit fees will be the contractor's responsibility. While the specific dollar amounts are not filled in on this template, the form is structured to provide a comprehensive financial breakdown for the Winter Weather Supply and Storage Building project for Clayton County.

View the file

Other files

File Type Posted
23-256 ADD 1 Final.pdf PDF
RFP 23-256 Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Schematic Design (Site Development)Hourly RatesTotal Cost
Insurance
General Conditions
General Administrative
Foundation
Concrete
Structural
Electrical
Plumbing
HVAC
Doors
Carpentry
Equipment
Sub-Total Cost Schematic Design (Site Development)$ - 0
Design DevelopmentHourly RatesTotal Cost
Insurance
General Conditions
General Administrative
Foundation
Concrete
Structural
Electrical
Plumbing
HVAC
Doors
Carpentry
Equipment
Sub-Total Cost Design Development$ - 0
Construction DocumentsHourly RatesTotal Cost
Insurance
General Conditions
General Administrative
Foundation
Concrete
Structural
Electrical
Plumbing
HVAC
Doors
Carpentry
Equipment
Sub-Total Cost Construction Documents$ - 0
Bid/NegotiationHourly RatesTotal Cost
Insurance
General Conditions
General Administrative
Foundation
Concrete
Structural
Electrical
Plumbing
HVAC
Doors
Carpentry
Equipment
Sub-Total Cost Bid/Negotiation$ - 0
Construction AdministrationHourly RatesTotal Cost
Insurance
General Conditions
General Administrative
Foundation
Concrete
Structural
Electrical
Plumbing
HVAC
Doors
Carpentry
Equipment
Sub-Total Cost Bid/Negotiation$ - 0
Total Cost of the Project$ - 0

Note: The Total Cost includes and encompasses the cost of all labor, materials, equipment, tools, supervision, scheduling, safety program, coordination, engineering, testing, surveys, layout, cleanup, and other things and services required to complete the entire Project in strict conformity with the Specifications, the Contract, all addenda, and authorized written clarifications issued prior to the Proposal date. All Permit Fees will be the responsibility of the contractor.

_______________________________________________________________ _______________________________________
Name Title
_______________________________________________________________ ______________________________________________
Signature Date
________________________________________________________
Company Name

RFP #23-256 Winter Weatehr Supply and Storage Building

ATTACHMENT B - PROPOSAL COST FORM

File details come from the government source that posted it. Updated .