Proposal Cost Form Final.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 23-256
- Issued by
- Clayton County, Georgia
About this file
The document is a Proposal Cost Form (Attachment B) for the Winter Weather Supply and Storage Building project for Clayton County, Georgia, solicited through RFP #23-256. The form is a comprehensive cost breakdown template designed to capture project expenses across multiple phases including Schematic Design, Design Development, Construction Documents, Bid/Negotiation, and Construction Administration. The form allows for detailed cost tracking across various project components such as insurance, general conditions, administrative costs, and specific construction elements like foundation, concrete, structural, electrical, plumbing, HVAC, doors, carpentry, and equipment.
The cost form includes a critical note specifying that the total project cost must encompass all labor, materials, equipment, tools, supervision, scheduling, safety program, coordination, engineering, testing, surveys, layout, cleanup, and other services required to complete the entire project. The form requires the proposer to complete the cost breakdown, sign, and date the document, with a clear indication that all permit fees will be the contractor's responsibility. While the specific dollar amounts are not filled in on this template, the form is structured to provide a comprehensive financial breakdown for the Winter Weather Supply and Storage Building project for Clayton County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23-256 ADD 1 Final.pdf | ||
| RFP 23-256 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Schematic Design (Site Development) | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Schematic Design (Site Development) | $ - 0 | |
| Design Development | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Design Development | $ - 0 | |
| Construction Documents | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Construction Documents | $ - 0 | |
| Bid/Negotiation | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Bid/Negotiation | $ - 0 | |
| Construction Administration | Hourly Rates | Total Cost |
| Insurance | ||
| General Conditions | ||
| General Administrative | ||
| Foundation | ||
| Concrete | ||
| Structural | ||
| Electrical | ||
| Plumbing | ||
| HVAC | ||
| Doors | ||
| Carpentry | ||
| Equipment | ||
| Sub-Total Cost Bid/Negotiation | $ - 0 | |
| Total Cost of the Project | $ - 0 |
Note: The Total Cost includes and encompasses the cost of all labor, materials, equipment, tools, supervision, scheduling, safety program, coordination, engineering, testing, surveys, layout, cleanup, and other things and services required to complete the entire Project in strict conformity with the Specifications, the Contract, all addenda, and authorized written clarifications issued prior to the Proposal date. All Permit Fees will be the responsibility of the contractor.
| _______________________________________________________________ _______________________________________ |
| Name Title |
| _______________________________________________________________ ______________________________________________ |
| Signature Date |
| ________________________________________________________ |
| Company Name |
RFP #23-256 Winter Weatehr Supply and Storage Building
ATTACHMENT B - PROPOSAL COST FORM
File details come from the government source that posted it. Updated .