Project Statement 24055.pdf
PDF 154 KB Posted
- Solicitation number
- RFP - 171 - 240000001338
- Issued by
- Lenawee County, Michigan
About this file
This document is a Project Statement issued by the Michigan Department of Technology, Management and Budget (DTMB) for a Smoke Purge System Repair/Replacement project at the Gus Harrison Correctional Facility located in Adrian, Michigan. The project will be managed by the DTMB Design and Construction Division and the Department of Corrections. The scope of work includes evaluating the existing smoke purge system in Units 4, 5, and segregation, reviewing the existing emergency generator size/panels, and designing the necessary repairs and replacements to the smoke purge system to meet MDOC Smoke Purge Guidelines. A mandatory pre-proposal meeting is scheduled for February 28, 2024, and proposals are due on March 21, 2024. The desired construction completion is by Fall 2025.
The proposal must be submitted electronically through the SIGMA VSS system, and the total cost for all phases should be provided as the bid amount. Firms are encouraged to combine their technical and cost proposals into a single attachment not exceeding 6MB. The project is subject to various federal, state, and local regulations and standards. No specific pricing terms, set asides, incumbents, or funding details are provided in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 10/22)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
3111 West St. Joseph Street Lansing, Michigan 48909
FILE NUMBER
472/24055.DPL
PROPOSAL DUE DATE
Thursday, March 21, 2024, at 2:00 p.m., EASTERN
CLIENT AGENCY
Department of Corrections
PROJECT NAME AND LOCATION
Gus Harrison Correctional Facility (ARF) – Smoke Purge System Repair / Replace
PROJECT ADDRESS (if applicable) 2727 E. Beecher St., Adrian, MI 49221
CLIENT AGENCY CONTACT
Tyler Slamka
TELEPHONE NUMBER
517.265.3900
DTMB - DCD PROJECT DIRECTOR
David Lenz, AIA
TELEPHONE NUMBER
517.614.5150
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
MANDATORY Pre – Proposal Meeting 2:00 p.m., EASTERN on Wednesday, February 28, 2024, at the Gus Harrison Correctional Facility, 2727 E. Beecher St., Adrian, MI 49221. Interested attendees are requested to meet at the north parking lot visitor entrance at the corner of East Beecher and Parr Highway.
MANDATORY (Check box if Mandatory)
PROJECT DESCRIPTION/SERVICES REQUESTED:
Phase 100 – Professional Architectural / Engineering Services for the following work:
• Phase 100 evaluate the existing smoker purge system in Units 4, 5, and segregation. Existing drawings are NOT accurate
• Review existing emergency generator size / panels
Phase 400 and 500 Professional Architectural/Engineering services for the following work:
• Design to repair and replace smoke purge system as necessary.
• Required to meeting MDOC Smoke Purge Guidelines. Existing drawings are available for review.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.
• Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission.
• Please remember that attachments can be no larger than 6mb.
• Please do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response. SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov mailto:sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Responses should not be emailed to the Project Director.
NIGP CODES
90644, 92507, 92533, 92567, 92584
DESIRED SCHEDULE OF WORK
Construction to be completed by Fall 2025
ACCEPTING RFP QUESTIONS UNTIL:
Please do not submit online questions via VSS. ALL questions should be emailed to David Lenz at lenzd@michigan.gov address no later than 2:00 p.m., Eastern on March 19, 2024.
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s) mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov mailto:lenzd@michigan.gov
File details come from the government source that posted it. Updated .