This document is a Project Statement for a state contract opportunity issued by the Michigan Department of Technology, Management and Budget (DTMB) for the Department of Natural Resources (DNR) for improvements at the Seven Lakes State Park. The project includes renovations or replacement of two park shelters, paving improvements throughout the park, and upgrades to the campground electrical system. The DNR seeks the services of a qualified engineer to provide design services for these improvements. A mandatory pre-proposal meeting is scheduled for September 21, 2022, and proposals are due by October 6, 2022 at 2:00 pm Eastern. The desired schedule is for design in 2022 and construction in 2023.
The project will comply with all relevant federal, state, and local codes, standards, and regulations. Attachments include existing drawings for the park's beach building and various roads and utilities. The contract opportunity is related to the state of Michigan and the local jurisdictions of Huron County and Holly Village.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 08/22)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division 3111 West St. Joseph Street
Lansing, Michigan 48909
FILE NUMBER
751/22335.SAA
PROPOSAL DUE DATE
October 6, 2022, at 2:00 p.m., EASTERN
CLIENT AGENCY
Department of Natural Resources
PROJECT NAME AND LOCATION
Seven Lakes State Park – ARPA Electric, Paving and Shelter Improvements PROJECT ADDRESS (if applicable) 14390 Fish Lake Rd, Holly, MI 48442
CLIENT AGENCY CONTACT
John Terpstra, Regional Field Planner, DNR
TELEPHONE NUMBER
248-672-7584
DTMB - DCD PROJECT DIRECTOR
Sheryl Ananich, AIA
TELEPHONE NUMBER
517-243-7605
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
Mandatory Pre-Proposal meeting – Wednesday, September 21, 2022 at 2pm at 14390 Fish Lake Rd, Holly, MI 48442. Please e-mail Sheryl Ananich, DTMB-DCD Project Director at ananichs@michigan.gov by Tuesday, September 20, 2022 at 2 pm to indicate your interest. Please provide the names of those attending, e-mail addresses and phone numbers for each person.
MANDATORY (Check box if Mandatory)
LEIN Check (Department of Corrections ONLY) All contractor / vendor representatives attending Preproposal Walk Through Meeting must submit a Vendor / Contractor LEIN Request form five business days prior to the meeting date (See the attached Vendor/Contractor LEIN Request Form). Send the LEIN Request form, filled and signed, by email to Daniel T. Smith at email address: smithD76@michigan.gov .
The email “Subject” must include (facility name, project name, date and time of Pre-Proposal Walk Through Meeting).
COVID 19 Precautions:
1. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed.
PROJECT DESCRIPTION/SERVICES REQUESTED
The DNR seeks to retain the services of a qualified engineer to develop plans for the following needs at Seven Lakes State Park:
1. A renovation/replacement of two shelters at Seven Lakes SP. The shelters are in poor condition and an engineer is needed to provide design services to either upgrade the existing shelters or provide design for new shelters. An evaluation and recommendation is needed by a design professional.
2. Targeted paving improvements will be developed throughout the park. The roads throughout the park are deteriorating, consisting of numerous potholes and cracking. Engineering plans are needed to address the current condition of the pavement.
3. Campground upgrades for the electrical system are needed. The campground electrical system is outdated and in need of upgrades to accommodate larger RV's, which represents a large portion of current users.
Design Review Meetings to be held at 50% and 90% reviews for Phase 400 and Phase 500 and as the PSC deems necessary. Microsoft Teams meetings are acceptable.
The PSC shall be responsible for running construction progress meetings twice a month for the duration of the project, including a Pre-Construction meeting.
Please provide a probable cost estimate for the anticipated work Two weeks review time is anticipated for each submission No multiple substantial completions are anticipated at this time
Please NOTE:
Proposal responses MUST be uploaded to SIGMA VSS. Please enter the total cost for all phases as the bid amount.
Please remember that individual attachments can be no larger than 6mb.
Please do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response. SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
Responses should not be emailed to the Project Director.
NIGP CODES
90607, 90610, 90672, 92517, 92531, 92533, 92586, 90922, 90976, 91065, 91223, 91394
DESIRED SCHEDULE OF WORK
Design in 2022. Construction in 2023.
ACCEPTING RFP QUESTIONS UNTIL: September 29, 2022 at 2:00 pm Please do not submit online questions via VSS. ALL questions should be emailed to Sheryl Ananich at ananichs@michigan.gov address no later than 2:00 p.m., Eastern on 9/29/22
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s)
1. Existing drawings – Seven Lakes Beach Building 1974
2. Existing drawings – Seven Lakes Various Roads Utilities 1987
File details come from the government source that posted it. Updated .