Project_Specifications.pdf
PDF 815 KB Posted
- Attached to
- INDU Roofing & Siding Replacement Federal contract opportunity
- Solicitation number
- 140P6424B0003
About this file
This document is a solicitation notice for a Roofing & Siding Replacement project at Indiana Dunes National Park in Porter County, Indiana.
The National Park Service is issuing an Invitation for Bids (IFB) for this project, which has an estimated value between $500,000 and $1,000,000. The work will consist of replacing the roofs, siding, and doors for several buildings at the park. This will be a firm-fixed price contract expected to be awarded to a prime contractor in late spring/early summer 2024, with performance required to be completed within 180 days of the Notice to Proceed. The project is set aside 100% for Service-Disabled Veteran-Owned Small Businesses under NAICS code 238160. An organized site visit is scheduled for May 7, 2024, and questions will be accepted until May 10, 2024. Offers must be submitted by email by 12:00 PM ET on May 29, 2024, with a virtual bid opening taking place at that time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6424B0003_Amd_0003.pdf | ||
| Revised_Bid_Opening_Information_0003.docx | DOCX document | |
| Questions_and_Answers_-_INDU_Roof_0002.pdf | ||
| Sol_140P6424B0003_Amd_0002.pdf | ||
| Sol_140P6424B0003_Amd_0001.pdf | ||
| Construction_Contract_Administration.pdf | ||
| Project_Specifications_-_Pictures_(Appendix_B).pdf | ||
| WD_-_Porter_County__IN.pdf | ||
| Sol_140P6424B0003.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Project_Specifications_-_Drawings_(Appendix_A).pdf | ||
| Notice_to_Contractors.pdf | ||
| Submittal_List.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Div. 1 V. 2022-9-6 1 | P a g e
SECTION 01 10 00
INDIANA DUNES NATIONAL PARK
HEADQUARTERS
1100 MINERAL SPRINGS ROAD,
PORTER INDIANA 46304
ROOFING AND SIDING REPLACEMENT
(B-102, B-108, B118 & B119)
PMIS 228286, 236478, 255512, 304966
Drawing No: 190134
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
10/27/2023
Div. 1 V. 2022-9-6 2 | P a g e
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 21 00 – Thermal Insulation Section 07 25 00 – Weather Barriers Section 07 46 46 – Fiber Cement Siding Section 07 53 23 – EPDM ROOFING
DIVISION 08 – OPENINGS
Section 08 11 13 Hollow Metal Doors and Frames
APPENDIX
A. DRAWINGS
B. PICTURES
Div. 1 V. 2022-9-6 3 | P a g e
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The Indiana Dunes National Park Headquarters is a group of buildings built around 1976 which started as a Nike Missile Base. This facility manages the operations that protect and preserve approximately 15,000 acres of natural resources and historical and cultural areas.
The existing roof and siding facilities have come to their end-of-life span, and it is time to replace them. This project concerns only four of the sixteen buildings in this area.
1.2 Work Covered by the Contract Documents:
A. Project Location: Indiana Dunes National Park Headquarters, 1100 Mineral Springs Road, Porter, IN 46304.
B. Work consists of:
a. Replacing the flat roof of two buildings (B-118 & B-119) and a bid additive for a third (B-108). See details in Section 07 53 23 1.1D and Table No. 1. Estimate 10% decking, fascia, and roof framing to be replaced per building.
b. Replace the siding of four buildings (B-102, B-108, B-118, & B-119). Estimate 10% OSB and wall framing to be replaced per building.
c. Replace all doors from three buildings (B-108, B-118, & B-119). Estimate 10% OSB and wall framing to be replaced per building.
C. All work will be performed under a single contract.
D. Period of performance: Work shall be completed within 180 calendar days of the start date provided on the Notice to Proceed.
ITEM 2 – PROTECTING EXISTING UTILITIES
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative (COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
Div. 1 V. 2022-9-6 4 | P a g e
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
Superintendent's Compendium - Indiana Dunes National Park (U.S. National Park Service) (nps.gov) ( https://www.nps.gov/indu/learn/management/compendium.htm)
A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of
7 a.m. to 4 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year Day Martin Luther King Jr.’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day https://www.nps.gov/indu/learn/management/compendium.htm https://www.nps.gov/indu/learn/management/compendium.htm https://www.nps.gov/indu/learn/management/compendium.htm
Div. 1 V. 2022-9-6 5 | P a g e
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding
Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan (see Appendix A Sheet C03). Do not disturb portions of project site beyond areas in which the work is indicated.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances. Coordinate with COR if there will be any interruption at the driveways and emergency areas.
C. Define site disturbance area, including earthwork and clearing of vegetation, to: N/A.
D. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract
Sum as required.
2. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements; provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Waste Operation:
a. Toilets: Contractor provided for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.
b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate as shown on site plan or coordinated with COR.
E. Security and Protection facilities:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022
Div. 1 V. 2022-9-6 6 | P a g e
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant Protection: N/A.
4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
5. Temporary Enclosures: N/A.
6. Site Enclosure Fence: N/A.
7. Security Enclosure and Lockup: N/A.
3.4 Storage - Staging Areas:
A. Confine storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage and staging areas may be discussed at the preconstruction briefing. The park does not have any bays or storage areas in this complex.
3.5 Preservation of Natural Features: N/A.
3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters.
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Occupancy Requirements for Buildings:
Div. 1 V. 2022-9-6 7 | P a g e
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
B. New/Existing Buildings Unoccupied: N/A.
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. Locations and dimensions shall also be noted on as built drawing set.
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
D. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
Div. 1 V. 2022-9-6 8 | P a g e
3.10 Fire and Life Safety:
A. As a minimum, conduct weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and Park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management
A. Noise Control: Perform roof and siding installation operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer or COR.
B. Repetitive and/or intermittent, high-level noise: Permitted only during daytime.
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the
Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.nps.gov/orgs/1671/do-business-with-us.htm
Div. 1 V. 2022-9-6 9 | P a g e
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies.
7. Recognition that work will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: As a minimum, conduct 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
Div. 1 V. 2022-9-6 10 | P a g e
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA
29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain four sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors functioning within the park to properly cleanup, mitigate, and remediate, if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the local 911 Emergency Response, COR and or the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16. The form will be provided by the Contracting Officer.
No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: Administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been
Div. 1 V. 2022-9-6 11 | P a g e received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Quality Control Plan.
9.2 Project Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selections.
Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the
Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than one manufacturer, the description of the proposed item must reflect the characteristics and
Div. 1 V. 2022-9-6 12 | P a g e level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the
Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.
9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.
Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Updated Schedule of Values: Break down each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work
Div. 1 V. 2022-9-6 13 | P a g e activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the
CO.
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
Div. 1 V. 2022-9-6 14 | P a g e
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.
B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
C. Information shall include operation and maintenance manuals for each warranted product.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
Thermal Insulation 15 | P a g e
SECTION 07 21 00
SECTION 07 21 00 - THERMAL INSULATION
PART 2 - GENERAL
2.1 SUMMARY
A. Section Includes:
1. Extruded polystyrene foam-plastic board.
2.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Sustainable Design Submittals:
1. Documentation of required Quality Assurance Sustainability Standards Certifications must be provided for all products in tested wall assembly as required in this section.
2. Product Data: For adhesives and sealants indicating compliance with General Emissions evaluation and VOC content requirements.
2.3 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Research reports.
PART 3 - PRODUCTS
3.1 EXTRUDED POLYSTYRENE FOAM-PLASTIC BOARD
A. Extruded polystyrene boards in this article are also called "XPS boards."
B. Extruded Polystyrene Board, Type X : ASTM C578, Type X, 15-psi (104-kPa) minimum compressive strength; unfaced; maximum flame-spread and smoke-developed indexes of 25 and 450, respectively, per ASTM E84.
1. Owens Corning Foamular NGX
(https://www.owenscorning.com/en-us/insulation/commercial/foamular-xps)
Dupont Styrofoam (https://www.dupont.com/brands/styrofoam.html)
Kingspan (https://www.kingspan.com/us/en/products/rigid-insulation/)
Thermal Insulation 16 | P a g e
2. Fire Propagation Characteristics: Passes NFPA 285 testing as part of an approved assembly.
3.2 ACCESSORIES
A. Insulation for Miscellaneous Voids:
1. Spray Polyurethane Foam Insulation: ASTM C1029, Type II, closed cell, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, per ASTM E84.
B. Insulation Anchors, Spindles, and Standoffs: As recommended by manufacturer.
C. Adhesive for Bonding Insulation: Product compatible with insulation and air and water barrier materials, and with demonstrated capability to bond insulation securely to substrates without damaging insulation and substrates.
PART 4 - EXECUTION
4.1 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and applications.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.
C. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
D. Provide sizes to fit applications and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.
4.2 INSTALLATION OF SLAB INSULATION
A. On vertical slab edge and foundation surfaces, set insulation units using manufacturer's recommended adhesive according to manufacturer's written instructions.
1. If not otherwise indicated, extend insulation a minimum of 24 inches (610 mm) below exterior grade line.
B. On horizontal surfaces, loosely lay insulation units according to manufacturer's written instructions. Stagger end joints and tightly abut insulation units.
1. If not otherwise indicated, extend insulation a minimum of 24 inches (610 mm) in from exterior walls.
Thermal Insulation 17 | P a g e
4.3 INSTALLATION OF FOUNDATION WALL INSULATION
A. Butt panels together for tight fit.
B. Adhesive Installation: Install with adhesive or press into tacky waterproofing or damp proofing according to manufacturer's written instructions.
4.4 INSTALLATION OF CAVITY-WALL INSULATION
A. Foam-Plastic Board Insulation: Install pads of adhesive spaced approximately 24 inches (610
mm) o.c. both ways on inside face and as recommended by manufacturer. Fit courses of insulation between wall ties and other obstructions, with edges butted tightly in both directions. Press units firmly against inside substrates.
1. Supplement adhesive attachment of insulation by securing boards with two-piece wall ties designed for this purpose and in masonry walls.
4.5 INSTALLATION OF INSULATION IN FRAMED CONSTRUCTION
A. Blanket Insulation: Install in cavities formed by framing members according to the following requirements:
1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.
2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
3. Maintain 3-inch (76-mm) clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.
4. For wood-framed construction, install blankets according to ASTM C1320 and as follows:
a. With faced blankets having stapling flanges, lap blanket flange over flange of adjacent blanket to maintain continuity of vapor retarder once finish material is installed over it.
5. Vapor-Retarder-Faced Blankets: Tape joints and ruptures in vapor-retarder facings, and seal each continuous area of insulation to ensure airtight installation.
a. Exterior Walls: Set units with facing placed toward interior of construction.
B. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:
Thermal Insulation 18 | P a g e
1. Glass-Fiber Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft. (40 kg/cu. m).
2. Spray Polyurethane Insulation: Apply according to manufacturer's written instructions.
Weather Barriers 19 | P a g e
SECTION 07 25 00
SECTION 07 25 00 - WEATHER BARRIERS
PART 5 - GENERAL
5.1 SUMMARY
A. Section Includes:
1. Building paper.
2. Building wrap.
3. Flexible flashing.
4. Drainage material.
5.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
5.3 INFORMATIONAL SUBMITTALS
A. Evaluation Reports: For water-resistive barrier, from ICC-ES.
PART 6 - PRODUCTS
6.1 WATER-RESISTIVE BARRIER
A. Building Wrap: ASTM E1677, Type I air barrier; with flame-spread and smoke-developed indexes of less than 25 and 450, respectively, when tested according to ASTM E84; UV stabilized; and acceptable to authorities having jurisdiction.
1. Tyvek® Fluid Applied Weather Barrier Systems :
https://www.dupont.com/content/dam/dupont/amer/us/en/performance-building-solutions/public/documents/en/101-1_DuPont_EPD_Tyvek_Fluid-Applied.pdf
2. Water-Vapor Permeance: Not less than 25 perms per ASTM E96/E96M, Desiccant Method (Procedure A).
3. Flame Propagation Test: Materials and construction shall be as tested according to
NFPA 285.
B. Building-Wrap Tape: Pressure-sensitive plastic tape recommended by building-wrap manufacturer for sealing joints and penetrations in building wrap.
https://www.dupont.com/content/dam/dupont/amer/us/en/performance-building-solutions/public/documents/en/101-1_DuPont_EPD_Tyvek_Fluid-Applied.pdf https://www.dupont.com/content/dam/dupont/amer/us/en/performance-building-solutions/public/documents/en/101-1_DuPont_EPD_Tyvek_Fluid-Applied.pdf
Weather Barriers 20 | P a g e
6.2 FLEXIBLE FLASHING
A. Butyl Rubber Flashing: Composite, self-adhesive, flashing product consisting of a pliable, butyl rubber compound, bonded to a high-density polyethylene film, aluminum foil, or spunbonded polyolefin to produce an overall thickness of not less than 0.025 inch (0.6 mm)
1. DuPont™ Weathermate™ Flexible Flashing (https://www.dupont.com/content/dam/dupont/amer/us/en/performance-building-solutions/public/documents/en/weathermate-flexible-flashing-pis-43-D100103-enUS.pdf)
2. Flame Propagation Test: Materials and construction shall be as tested according to
NFPA 285.
B. Rubberized-Asphalt Flashing: Composite, self-adhesive, flashing product consisting of a pliable, rubberized-asphalt compound, bonded to a high-density polyethylene film, aluminum foil, or spunbonded polyolefin to produce an overall thickness of not less than 0.040 inch (1.0 mm).
1. TEXTROFLASH : https://www.h-b.com/products/textroflash-flashing
2. Flame Propagation Test: Materials and construction shall be as tested according to
NFPA 285.
6.3 DRAINAGE MATERIAL
A. Drainage Material: Product shall maintain a continuous open space between water-resistive barrier and exterior cladding to create a drainage plane and shall be used under siding.
1. Flame Propagation Test: Materials and construction shall be as tested according to
NFPA 285.
PART 7 - EXECUTION
7.1 WATER-RESISTIVE BARRIER INSTALLATION
A. Cover sheathing with water-resistive barrier as follows:
1. Cut back barrier 1/2 inch (13 mm) on each side of the break in supporting members at expansion- or control-joint locations.
2. Apply barrier to cover vertical flashing with a minimum 4-inch (100-mm) overlap unless otherwise indicated.
B. Building Paper: Apply horizontally with a 2-inch (50-mm) overlap and a 6-inch (150-mm) end lap; fasten to sheathing with galvanized staples or roofing nails.
C. Building Wrap: Comply with manufacturer's written instructions and warranty requirements.
1. Seal seams, edges, fasteners, and penetrations with tape.
2. Extend into jambs of openings and seal corners with tape.
Weather Barriers 21 | P a g e
7.2 FLEXIBLE FLASHING INSTALLATION
A. Apply flexible flashing where indicated to comply with manufacturer's written instructions.
1. Lap seams and junctures with other materials at least 4 inches (100 mm) except that at flashing flanges of other construction, laps need not exceed flange width.
2. Lap flashing over water-resistive barrier at bottom and sides of openings.
3. Lap water-resistive barrier over flashing at heads of openings.
7.3 DRAINAGE MATERIAL INSTALLATION
A. Install drainage material over building wrap and flashing to comply with manufacturer's written instructions.
Fiber Cement Siding 22 | P a g e
SECTION 07 46 46
SECTION 07 46 46 - FIBER-CEMENT SIDING
PART 8 - GENERAL
8.1 SUMMARY
A. Section includes fiber-cement siding.
8.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: For fiber-cement siding including related accessories.
8.3 INFORMATIONAL SUBMITTALS
A. Product certificates.
B. Product test reports.
C. Research/evaluation reports.
D. Sample warranty.
8.4 CLOSEOUT SUBMITTALS
A. Maintenance data.
8.5 QUALITY ASSURANCE
A. Mockups: Build mockups to verify selections made under Sample submittals and to demonstrate aesthetic effects and to set quality standards for fabrication and installation.
1. Build mockup of typical wall area.
8.6 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace products that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 30 years from date of Substantial Completion.
Fiber Cement Siding 23 | P a g e
PART 9 - PRODUCTS
9.1 FIBER-CEMENT SIDING
A. General: ASTM C1186, Type A, Grade II, fiber-cement board, noncombustible when tested according to ASTM E136; with a flame-spread index of 25 or less when tested according to
ASTM E84.
2. James Hardie HZ5 Engineered for Climate Lap Siding https://products-specpoint.mydeltek.com/product/6e0ce200-a616-4d62-9a31-4855a2fdc9a_10a52d06- 511f-4a50-a029-ab3926ca0676?groupby=sectionNumber%2520false%252CproductType%2520false&sortby=sectionN umber%252CproductType%252Ctype%252ClastUpdated&sp=%27074646+-+FIBER- CEMENT+SIDING%27%25%7C%25%27Fiber-Cement+Siding%27&sn=074646+-+FIBER-
CEMENT+SIDING
Fiber Cement Lap Siding | HardiePlank Lap Siding | James Hardie
B. Labeling: Provide fiber-cement siding that is tested and labeled according to ASTM C1186 by a qualified testing agency acceptable to authorities having jurisdiction.
C. Nominal Thickness: Not less than 5/16 inch (8 mm).
D. Horizontal Pattern: Boards 8-1/4 to 8-1/2 inches (210 to 216 mm) wide in beaded-edge style.
1. Texture: Wood grain.
E. Factory Priming: Manufacturer's standard acrylic primer.
9.2 FIBER-CEMENT SOFFIT – N/A
9.3 ACCESSORIES
A. Siding Accessories, General: Provide starter strips, edge trim, outside and inside corner caps, and other items as recommended by siding manufacturer for building configuration.
B. Fasteners:
1. For fastening to wood, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1 inch (25 mm) into substrate.
2. For fastening to metal, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1/4 inch (6 mm), or three screw-threads, into substrate.
3. For fastening fiber cement, use stainless-steel fasteners.
C. Insect Screening for Soffit Vents: Aluminum, 18-by-16 (1.4-by-1.6-mm) mesh.
D. Continuous Soffit Vents: Aluminum, hat-channel shape.
https://www.jameshardie.com/products/hardieplank-lap-siding
Fiber Cement Siding 24 | P a g e
1. Net-Free Area: 8 sq. in./linear ft. (560 sq. cm/m). (Contractor shall confirm dimensions)
2. Finish: #332422 Cocoa Brown 17% of Red, 3% of Magenta, 17% of Blue, 13% of
Green and 50% of Black. For the wall color. Federal Standard 595c (aka AMS) 10032 is a darker brown. For the trim color.
PART 10 - EXECUTION
10.1 INSTALLATION
A. General: Comply with manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
1. Install fasteners no more than 24 inches (600 mm) o.c.
B. Install joint sealants as specified and produce a weathertight installation.
10.2 ADJUSTING AND CLEANING
A. Remove damaged, improperly installed, or otherwise defective materials and replace with new materials complying with specified requirements.
B. Clean finished surfaces according to manufacturer's written instructions and maintain in a clean condition during construction.
(EPDM) ROOFING 25 | P a g e
SECTION 07 53 23
ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
PART 11 - GENERAL
11.1 SCOPE OF WORK
Indiana Dunes National Park.
Two Project Locations:
A. Project location: Head Quarters – 1100 Mineral Springs Road, Porter Indiana 46304.
B. Building(s) Name/Identifier: See TABLE NO. 1.
C. Work consists of the following:
1. Full tear-off of roof system at areas indicated on Drawings or in Photographs provided.
a. Removal of existing roofing system down to existing roof deck.
2. Re-cover preparation of entire roof area where tear-off occurs, including installation of new roofing system.
3. Removal of flashings and counter flashings.
4. See table No. 1 for more details.
5. Removal and replacement of gutters and downspouts.
6. Removal and replacement of plumbing vents and boots in kind.
7. Temporary roofing during construction where required. Temporary roofing shall maintain the project roof is watertight and able to prevent leaks and damage to the building and structure until the reroofing work is completed. Contractor is to make sure that at the completion of work each day the projects roof is 100% watertight.
8. Remove and replace the existing roof membranes and associated roof flashings, the existing rigid roof insulations down to deck and patch any openings in the structural decking as required before installing the new ridged roof insulation, roof insulation crickets, expansion joints, all associated roof flashings, counter flashings, and metal copings. Provide new roof drains.
9. National Park Service (NPS) requires the existing roof decks to be walked after demolition has been completed with their onsite Contracting Office Representative (COR) or designated Project Inspector prior to installation of any new roof materials to ascertain if any water penetration has caused deterioration and corrosion of the existing decks which are to remain. If there are areas of concern the COR may require the Contractor to perform pull out tests to determine if the existing decking in question can remain or if it will need to be replaced. This can include visible areas of water damage or insect related damage, and concrete decks for spalling and other visible damage. Testing and replacement of these types of unforeseen damaged areas will be by Change Order if required.
D. Roof Area:
(EPDM) ROOFING 26 | P a g e
1. Refer to proposed roof plan with general dimensions ± See also TABLE NO.1.
2. Note the Contractor is encouraged to field verify roof dimensions prior to bidding.
TABLE NO. 1
BLDG NO NAME DECKING
REQUIRED
INSULATION
TOP ROOF
LAYER
AREA
(SF)
PROVIDE
GUTTERS
LENGTH
(FT)
PROVIDE
DOWNSPOUT
S LENGTH (FT)
B118 FIRE STATION 2 WOOD R30 EPDM (BLACK) 61' ONE @ 17'
B112 BUILDING & UTILITIES WOOD R30 EPDM (BLACK) 126'-11" THREE @ 17' EA
BLDG NO NAME DECKING
REQUIRED
INSULATION
TOP ROOF
LAYER
AREA
(SF)
PROVIDE
GUTTERS
LENGTH
(FT)
PROVIDE
DOWNSPOUT
S LENGTH (FT)
B108 CUSTODIAL SERVICES WOOD/STEEL R30 EPDM (BLACK) 1,291 53' TWO @ 18' EA
GENERAL NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD.
2. THE CONTRACTOR SHALL TAKE ROOF CORE TO CONFIRM EXISTING ROOF LAYERS AND INSULATION.
3. NEW INSULATION NEED TO MEET A MINIMUM OF R30.
4. THE CONTRACTOR SHALL INCLUDE IN THEIR PROPOSAL IF THE PERIMETTER FASCIA NEED TO BE RAISE TO MEET THE
NEW INSULATION REQUIREMENTS.
HEAD QUARTERS
BID ADDITIVE 1
EPDM ROOF REPLACEMENT
14,521
(EPDM) ROOFING 27 | P a g e
11.2 SUMMARY
A. Section Includes:
1. Selective Demolition
2. Adhered ethylene-propylene-diene-terpolymer (EPDM) roofing system.
3. Roof insulation.
4. Cover board.
5. Walkways.
6. Sheet Metal Flashing and Trim.
7. Gutter and downspouts.
8. Vents and plumbing boots.
11.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
11.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include roof plans, sections, details, and attachments to other work and adjacent materials, including the following:
1. Layout and thickness of insulation.
2. Base flashings and membrane terminations.
3. Flashing details at penetrations.
4. Tapered insulation, thickness, and slopes.
5. Roof plan showing orientation of the roof deck and orientation of roof membranes.
6. Insulation layout plans including tapered roof insulation and cricket locations clearly identified and indicate all roof slopes.
C. Samples: For the following products:
1. Roof membrane and flashings of color required.
2. Walkway pads or rolls, of color required.
3. Cover Board.
D. Wind Uplift Resistance Submittal: For roofing system, indicating compliance with wind uplift performance requirements.
11.5 INFORMATIONAL SUBMITTALS
A. Manufacturer Certificates:
1. Performance Requirement Certificate: Signed by roof membrane manufacturer, certifying that roofing system complies with requirements specified in "Performance Requirements" Article.
(EPDM) ROOFING 28 | P a g e
a. Submit evidence of complying with performance requirements from manufacturers site visit sign off.
2. Special Warranty Certificate: Signed by roof membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty.
B. Product Test Reports: For components of roof membrane and insulation, for tests performed by a qualified testing agency, indicating compliance with specified requirements.
C. Research reports.
D. Field Test Reports:
1. Insulation adhesives test results and manufacturer's requirements.
E. Field quality-control reports.
F. Sample warranties.
G. Operation and Maintenance Manuals.
11.6 CLOSEOUT SUBMITTALS
A. Maintenance data. For roofing system to include in maintenance manuals.
11.7 SUBMITTAL COORDINATION
A. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of the submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
11.8 QUALITY ASSURANCE
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .