Text version
MOBILIZATION 011900-1
USDA FOREST SERVICE, R-4
DUTCH JOHN OFFICE/BUNKHOUSE REMODEL
SECTION 011900 - MOBILIZATION
GENERAL
SUMMARY
This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
MEASUREMENT AND PAYMENT
The measurement shall be lump sum for mobilization. Payment shall be as follows:
Bond premiums will be reimbursed after receipt of the evidence of payment.
50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
Progress payments for mobilization and preparatory work shall be subject to retainage.
PRODUCTS (NOT USED)
EXECUTION (NOT USED)
END OF SECTION 011900
May 2021
SUBMITTALS 013300-2
DUTCH JOHN OFFICE/BUNKHOUSE REMODEL
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
1.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
SUBMITTALS 013300-3
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
1.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
SUBMITTALS 013300-4
g. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
E. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
SUBMITTALS 013300-5
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 3 - EXECUTION
3.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution.
Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
SUBMITTALS 013300-6
3.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive
– additional submittals may be required by specific specifications:
TABLE 013000-1
Spec.
Section Section Title
Sub-sec-tion
Required Submittal
099100 Paint 3.3 Color Selection Sheets 099110 Exterior Painting 1.2A Product Data 074646 Fiber Cement Siding Color selection sheets 074646 Fiber Cement Siding Product Data 085413 Fiberglass Windows Product Data 096816 Sheet Carpeting Color Selection Sheets 096816 Sheet Carpeting Product Data
END OF SECTION 013300
SELECTIVE DEMOLITION 017320-1
DUTCH JOHN OFFICE/BUNKHOUSE REMODEL
SECTION 017320 - SELECTIVE DEMOLITION
PART 4 - GENERAL
4.1 SUMMARY
A. This Section includes demolition and removal of the following:
1. Selected portions of a building.
2. Repair procedures for selective demolition operations.
4.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Government.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
4.3 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from Project site.
4.4 PROJECT CONDITIONS
A. Conduct selective demolition so Government operations will not be disrupted. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.
B. Maintain access to existing building amenities, pathways, and other adjacent occupied or used facilities.
1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the COR.
C. Government assumes no responsibility for condition of areas to be selectively demolished.
SELECTIVE DEMOLITION 017320-2
1. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.
4.5 MEASUREMENT AND PAYMENT
A. There will be separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.
PART 5 - PRODUCTS
5.1 REPAIR MATERIALS
A. Use repair materials identical to existing materials.
1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
2. Use materials whose installed performance equal or surpasses that of existing materials.
PART 6 - EXECUTION
6.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to CO.
6.2 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct roads, without permission from CO. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
2. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.
3. Protect existing site improvements, appurtenances, and landscaping to remain.
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
SELECTIVE DEMOLITION 017320-3
C. Temporary Enclosures: Provide temporary enclosures for protection of existing building and construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.
6.3 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations.
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by CO, items may be removed to a suitable, protected storage location during selective demolition [and cleaned] and reinstalled in their original locations after selective demolition operations are complete.
6.4 PATCHING AND REPAIRS
A. General: Promptly repair damage to adjacent construction caused by selective demolition operations.
B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.
1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations.
C. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.
D. Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
SELECTIVE DEMOLITION 017320-4
E. Ceilings: Patch and repair existing ceilings as necessary to provide an even-plane surface of uniform appearance.
6.5 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
B. Dispose of universal hazardous waste as required above.
C. Burning: Do not burn demolished materials.
D. Disposal: Transport demolished materials off Government property and legally dispose of them.
END OF SECTION 017320
FEBRUARY 2021
FIBER CEMENT SIDING 074646-1
USDA FOREST SERVICE, R4
DUTCH JOHN OFFICE/BUNKHOUSE REMODEL
SECTION 074646 - FIBER-CEMENT SIDING AND SOFFITS
GENERAL
SUMMARY
Section includes:
Fiber-cement siding.
Vented fiber cement soffit Fascia
ACTION SUBMITTALS
Product Data: For each type of product.
Samples: For fiber-cement siding including related accessories.
INFORMATIONAL SUBMITTALS
Warranty.
CLOSEOUT SUBMITTALS
Maintenance data.
WARRANTY
Special Warranty: Manufacturer agrees to repair or replace products that fail in materials or workmanship within specified warranty period.
Verify available warranties and warranty periods for fiber-cement siding and soffit.
Warranty Period: 10 years from date of Substantial Completion.
MEASUREMENT AND PAYMENT
There will be no separate measurement or payment for work in this Section. Payment will be included in the contract unit price as shown on the Schedule of Items.
This product is part of an optional bid item.
PRODUCTS
FIBER-CEMENT SIDING
FIBER CEMENT SIDING 074646-2
General: ASTM C 1186, Type A, Grade II, fiber-cement board, noncombustible when tested according to ASTM E 136; with a flame-spread index of 25 or less when tested according to ASTM E 84.
Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
CertainTeed Corporation.
GAF.
James Hardie Building Products, Inc.
Miratec
The International Building Code requires fiber-cement siding to be third-party tested and labeled according to ASTM C 1186.
Labeling: Provide fiber-cement siding that is tested and labeled according to ASTM C 1186 by a qualified testing agency acceptable to authorities having jurisdiction.
Nominal Thickness: Not less than 5/16 inch.
Retain one or more of first four paragraphs below or revise to suit Project. "Horizontal Pattern" Paragraph includes some sizes advertised by manufacturers listed; verify availability before retaining. Widths are board sizes; exposure is 1-1/4 to 1-1/2 inches (32 to 38 mm) less.
Panel Texture: 48-inch-wide sheets with wood-grain texture.
Factory priming is generally offered as an optional feature by manufacturers listed.
Factory Priming: Manufacturer's standard acrylic primer.
ACCESSORIES
Siding Accessories, General: Provide starter strips, edge trim, outside and inside corner caps, and other items as recommended by siding manufacturer for building configuration.
Trim: 5/8” thickness X 3 ½” width composite trim, prefinished trim for corners and battens or equal.
Flashing: Provide aluminum flashing at window and door heads and where indicated.
Finish for Aluminum Flashing: Siliconized polyester coating.
Fasteners:
For fastening to wood, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1 inch into substrate.
For fastening to metal, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1/4 inch, or three screw-threads, into substrate.
For fastening fiber cement, use hot-dip galvanized fasteners.
EXECUTION
INSTALLATION
http://www.specagent.com/Lookup?ulid=9170 http://www.specagent.com/Lookup?uid=123456981246 http://www.specagent.com/Lookup?uid=123456981247 http://www.specagent.com/Lookup?uid=123456981248
FIBER CEMENT SIDING 074646-3
General: Comply with manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
Install fasteners no more than 24 inches o.c.
Install joint sealants to produce a weathertight installation.
ADJUSTING AND CLEANING
Remove damaged, improperly installed, or otherwise defective materials and replace with new materials complying with specified requirements.
Clean finished surfaces according to manufacturer's written instructions and maintain in a clean condition during construction.
END OF SECTION 074646
JANUARY
FIBERGLASS WINDOWS 085413-1
DUTCH JOHN OFFICE/BUNKHOUSE REMODEL
SECTION 085413 - FIBERGLASS WINDOWS (LC – Light Commercial)
PART 7 - GENERAL
7.1 SUMMARY
A. Section includes fiberglass-framed windows.
7.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
7.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include plans, elevations, sections, hardware, accessories, insect screens, operational clearances, and details of installation, including anchor, flashing, and sealant installation.
7.4 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Sample warranties.
7.5 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace fiberglass windows that fail in materials or workmanship within specified warranty period.
1. Warranty Period:
a. Window: 10 years from date of Substantial Completion.
b. Glazing Units: Five years from date of Substantial Completion.
PART 8 - PRODUCTS
8.1 WINDOW PERFORMANCE REQUIREMENTS
A. Product Standard: Comply with AAMA/WDMA/CSA 101/I.S.2/A440 for definitions and minimum standards of performance, materials, components, accessories, and fabrication unless more stringent requirements are indicated.
B. Performance Class and Grade: AAMA/WDMA/CSA 101/I.S.2/A440 as follows:
1. Minimum Performance Class: LC.
2. Minimum Performance Grade: 25.
FIBERGLASS WINDOWS 085413-2
C. Thermal Transmittance: NFRC 100 maximum whole-window U-factor of 0.30 Btu/sq. ft.
x h x deg F.
D. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window SHGC of
ANY.
8.2 FIBERGLASS WINDOWS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Alpen High Performance Products.
2. Kolbe Windows.
3. Milgard Manufacturing, Inc.
4. Pella Corporation.
5. Marvin Windows and Doors.
B. Operating Types: As indicated on Drawings.
C. Frames and Sashes: Pultruded fiberglass complying with AAMA/WDMA/CSA 101/I.S.2/A440 and with exposed exterior fiberglass surfaces finished with manufacturer's standard enamel coating complying with AAMA 613 or
AAMA 623.
1. Exterior Color: As selected by COR from manufacturer's full range.
2. Interior Finish: Matching exterior color and finish.
D. Glass: Clear annealed glass, ASTM C1036, Type 1, Class 1, q3.
1. Kind: Fully tempered where indicated on Drawings.
E. Insulating-Glass Units: ASTM E2190.
1. Glass: ASTM C1036, Type 1, Class 1, q3.
a. Tint: Clear.
b. Kind: Fully tempered where indicated on Drawings.
2. Filling: Fill space between glass lites with air.
3. Low-E Coating: Pyrolytic on second surface.
F. Glazing System: Manufacturer's standard factory-glazing system. Laminated glass on south facing windows and insulated glass in the remainder of locations. See plans
G. Hardware, General: Provide manufacturer's standard corrosion-resistant hardware sized to accommodate sash weight and dimensions.
1. Exposed Hardware Color and Finish: As selected by COR from manufacturer's full range.
H. Weather Stripping: Provide full-perimeter weather stripping for each operable sash unless otherwise indicated.
http://www.specagent.com/Lookup?ulid=55 http://www.specagent.com/Lookup?uid=123457121550 http://www.specagent.com/Lookup?uid=123457121545 http://www.specagent.com/Lookup?uid=123457121546
FIBERGLASS WINDOWS 085413-3
I. Fasteners: Noncorrosive and compatible with window members, trim, hardware, anchors, and other components.
1. Exposed Fasteners: Do not use exposed fasteners to greatest extent possible. For application of hardware, use fasteners that match finish hardware being fastened.
8.3 ACCESSORIES
A. Jamb Extensions: Stain-grade Pacific Hemlock.
8.4 FABRICATION
A. Fabricate fiberglass windows in sizes indicated. Include a complete system for installing and anchoring windows.
B. Glaze fiberglass windows in the factory.
C. Weather strip each operable sash to provide weathertight installation.
D. Mullions: Provide mullions and cover plates, matching window units, complete with anchors for support to structure and installation of window units. Allow for erection tolerances and provide for movement of window units due to thermal expansion and building deflections. Provide mullions and cover plates capable of withstanding design wind loads of window units.
E. Complete fabrication, assembly, finishing, hardware application, and other work in the factory to greatest extent possible. Disassemble components only as necessary for shipment and installation. Allow for scribing, trimming, and fitting at Project site.
PART 9 - EXECUTION
9.1 INSTALLATION
A. Comply with manufacturer's written instructions for installing windows, hardware, accessories, and other components. For installation procedures and requirements not addressed in manufacturer's written instructions, comply with installation requirements in ASTM E2112.
B. Install windows level, plumb, square, true to line, without distortion, anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent construction to produce weathertight construction.
C. Adjust operating sashes and hardware for a tight fit at contact points and weather stripping for smooth operation and weathertight closure.
D. Clean exposed surfaces immediately after installing windows. Remove excess sealants, glazing materials, dirt, and other substances.
E. Remove and replace sashes if glass has been broken, chipped, cracked, abraded, or damaged during construction period.
FIBERGLASS WINDOWS 085413-4
END OF SECTION 085413
MARCH 2020
RESILIENT WALL BASE AND ACCESSORIES 096530-1
DUTCH JOHN OFFICE/BUNKHOUSE REMODEL
SECTION 096530 - RESILIENT WALL BASE AND ACCESSORIES
PART 10 - GENERAL
10.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
10.2 SUMMARY
A. This Section includes the following:
1. Wall base.
B. Related Sections include the following:
1. Division 1 Section "LEED Requirements" for additional LEED requirements.
10.3 SUBMITTALS
A. Product Data: For each type of product indicated.
10.4 DELIVERY, STORAGE, AND HANDLING
A. Store resilient products and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F (10 deg C) or more than 90 deg F (32 deg C).
10.5 PROJECT CONDITIONS
A. Maintain temperatures within range recommended by manufacturer, but not less than [70 deg F (21 deg C)] <Insert temperature> or more than [95 deg F (35 deg C)] <Insert temperature>, in spaces to receive floor tile during the following time periods:
1. 48 hours before installation.
2. During installation.
3. 48 hours after installation.
B. After postinstallation period, maintain temperatures within range recommended by manufacturer, but not less than [55 deg F (13 deg C)] <Insert temperature> or more than [95 deg F (35 deg C)] <Insert temperature>.
C. Install resilient products after other finishing operations, including painting, have been completed.
10.6 MEASUREMENT AND PAYMENT
RESILIENT WALL BASE AND ACCESSORIES 096530-2
A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price as shown on the Schedule of Items for the building.
PART 11 - PRODUCTS
11.1 MANUFACTURERS
A. Products: Subject to compliance with requirements, provide one of the products listed in other Part 2 articles.
11.2 COLORS AND PATTERNS
A. Colors and Patterns: Selected by COR
11.3 RESILIENT WALL BASE <Insert drawing designation, e.g., WB-1.>
A. Wall Base: ASTM F 1861.
1. Armstrong World Industries, Inc.; <Insert product>.
2. Azrock Commercial Flooring, DOMCO; <Insert product>.
3. Johnsonite; <Insert product>.
B. Type (Material Requirement): [TV (vinyl)]
C. Group (Manufacturing Method): [I (solid, homogeneous)
D. Style: [Cove (with top-set toe)]
E. Minimum Thickness: [0.125 inch
F. Height: 6 inches (152 mm).
G. Lengths: [Coils in manufacturer's standard length]
H. Outside Corners: [Job formed
I. Inside Corners: [Job formed
J. Surface: Smooth.
11.4 INSTALLATION MATERIALS
A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic cement based formulation provided or approved by resilient product manufacturers for applications indicated.
B. Adhesives: Water-resistant type recommended by manufacturer to suit resilient products and substrate conditions indicated.
1. Use adhesives that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):
a. Cove Base Adhesives: 50 g/L.
RESILIENT WALL BASE AND ACCESSORIES 096530-3
PART 12 - EXECUTION
12.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances, moisture content, and other conditions affecting performance.
1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of resilient products.
2. Proceed with installation only after unsatisfactory conditions have been corrected.
12.2 PREPARATION
A. Prepare substrates according to manufacturer's written recommendations to ensure adhesion of resilient products.
B. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents.
C. Use trowelable leveling and patching compound to fill cracks, holes, and depressions in substrates.
D. Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation.
1. Do not install resilient products until they are the same temperature as the space where they are to be installed.
E. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation. After cleaning, examine substrates for moisture, alkaline salts, carbonation, and dust. Proceed with installation only after unsatisfactory conditions have been corrected.
12.3 RESILIENT WALL BASE INSTALLATION
A. Apply wall base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required.
B. Install wall base in lengths as long as practicable without gaps at seams and with tops of adjacent pieces aligned.
C. Tightly adhere wall base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates.
D. Do not stretch wall base during installation.
E. On masonry surfaces or other similar irregular substrates, fill voids along top edge of wall base with manufacturer's recommended adhesive filler material.
F. Premolded Corners: Install premolded corners before installing straight pieces.
RESILIENT WALL BASE AND ACCESSORIES 096530-4
G. Job-Formed Corners:
1. Outside Corners: Use straight pieces of maximum lengths possible. Form without producing discoloration (whitening) at bends. Shave back of base at points where bends occur and remove strips perpendicular to length of base that are only deep enough to produce a snug fit without removing more than half the wall base thickness.
2. Inside Corners: Use straight pieces of maximum lengths possible. Form by cutting an inverted V-shaped notch in toe of wall base at the point where corner is formed.
Shave back of base where necessary to produce a snug fit to substrate.
12.4 CLEANING AND PROTECTION
A. Perform the following operations immediately after completing resilient product installation:
1. Remove adhesive and other blemishes from exposed surfaces.
2. Sweep and vacuum surfaces thoroughly.
3. Damp-mop surfaces to remove marks and soil.
a. Do not wash surfaces until after time period recommended by manufacturer.
B. Protect resilient products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. Use protection methods recommended in writing by manufacturer.
END OF SECTION 096
May 2021
SHEET CARPETING 096816-1
DUTCH JOHN OFFICE/BUNKHOUSE REMODEL
SECTION 096816 - SHEET CARPETING
PART 13 - GENERAL
13.1 SUMMARY
A. Section Includes:
1. Woven carpet.
13.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
13.3 ACTION SUBMITTALS
A. Product Data: For each type of product, including VOC.
B. Samples: For each exposed product and for each color and texture required.
13.4 INFORMATIONAL SUBMITTALS
A. Sample warranties.
13.5 CLOSEOUT SUBMITTALS
A. Maintenance data.
13.6 QUALITY ASSURANCE
A. Installer Qualifications: Certified by the International Certified Floorcovering Installers Association at the Commercial II certification level.
13.7 WARRANTY
A. Special Warranty for Carpet: Manufacturer agrees to repair or replace components of carpet installation that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 10 years from date of Substantial Completion.
PART 14 - PRODUCTS
14.1 PATTERNED LOOP PILE CARPET: CP
SHEET CARPETING 096816-2
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. Mohawk Group (The); Mohawk Carpet, LLC.
2. PacifiCrest Mills, Inc.
3. Stanton Carpet Corporation.
4. Tandus; a Tarkett company.
B. Color: As selected by COR from manufacturer's full range.
C. Pattern: Runaway II or Aftermath II by Tarkett/ Tandus. Either may be selected by the users.
D. Fiber Content: 100 percent Dynex SD Nylon.
E. Pile Characteristic: Level-loop pile.
F. Soil Protection: Applied at 2% of face weight
G. Gage: 5/64”
H. Stitches per Row: 8.5/in
I. Pile thickness: 0.08” as per ASTM D5848
J. Average Pile Height: 0.185”
K. Backing: Powerbond Cushion.
L. Performance Characteristics:
1. Critical Radiant Flux Classification: Not less than 0.45 W/sq. cm according to
NFPA 253.
2. Electrostatic Propensity: Less than 3.0 kV according to AATCC 134.
14.2 INSTALLATION ACCESSORIES
A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet manufacturer.
B. Adhesives: Water-resistant, mildew-resistant, nonstaining type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet and is recommended or provided by carpet manufacturer.
1. Verify adhesives have a VOC content of 50 g/L or less.
C. Seam Adhesive: Hot-melt adhesive tape or similar product recommended by carpet manufacturer for sealing and taping seams and butting cut edges at backing to form secure seams and to prevent pile loss at seams.
PART 15 - EXECUTION
http://www.specagent.com/Lookup?ulid=9642 http://www.specagent.com/Lookup?uid=123457019699 http://www.specagent.com/Lookup?uid=123457019700 http://www.specagent.com/Lookup?uid=123457019704 http://www.specagent.com/Lookup?uid=123457019703 http://www.arcomnet.com/sustainable_design.aspx?topic=168
SHEET CARPETING 096816-3
15.1 EXAMINATION
A. Concrete Slabs:
1. Moisture Testing: Perform tests so that each test area does not exceed 1000 sq. ft and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas.
a. Anhydrous Calcium Chloride Test: ASTM F 1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000 sq. ft. in 24 hours.
b. Relative Humidity Test: Using in situ probes, ASTM F 2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement.
15.2 PREPARATION
A. General: Comply with CRI's "CRI Carpet Installation Standard" and with carpet manufacturer's written installation instructions for preparing substrates.
B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider, and protrusions more than 1/32 inch, unless more stringent requirements are required by manufacturer's written instructions.
C. Concrete Substrates: Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by adhesive and carpet manufacturers.
D. Broom and vacuum clean substrates to be covered immediately before installing carpet.
15.3 CARPET INSTALLATION
A. Comply with CRI's "CRI Carpet Installation Standard" and carpet manufacturer's written installation instructions for the following:
1. Direct-glue-down installation.
B. Comply with carpet manufacturer's written instructions and Shop Drawings for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile.
At doorways, center seams under the door in closed position.
1. Stretch-in Carpet Installation: Install carpet cushion seams at 90-degree angle with carpet seams.
C. Install borders with mitered corner seams.
D. Do not bridge building expansion joints with carpet.
SHEET CARPETING 096816-4
E. Cut and fit carpet to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet manufacturer.
F. Extend carpet into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.
G. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on carpet as marked on subfloor. Use nonpermanent, nonstaining marking device.
H. Protect carpet against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods recommended in writing by carpet manufacturer and carpet adhesive manufacturer.
END OF SECTION 096816
NOVEMBER 2020
| Bond premiums will be reimbursed after receipt of the evidence of payment. |
| 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums. |
| Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums. |
| Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance. |
| Progress payments for mobilization and preparatory work shall be subject to retainage. |
| 1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. |
| 1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed... |
| 2. If intermediate submittal is necessary, process it in same manner as initial submittal. |
| 3. Allow 14 days for processing each re-submittal. |
| 4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing. |
| 1. Indicate name of firm or entity that prepared each submittal on label or title block. |
| 2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO. |
| 3. Include the following information on label for processing and recording action taken: |
| 1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document. |
| 1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. |
| 2. Mark each copy of each submittal to show which products and options are applicable. |
| 3. Include the following information, as applicable: |
| 1. Preparation: Include the following information, as applicable: |
| 2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring. |
| 1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. |
| 1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies. |
| 2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. |
| 3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control." |
| 1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the... |
| 2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ. |
| 3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws. |
| 4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions. |
| 1. Selected portions of a building. |
| 2. Repair procedures for selective demolition operations. |
| 1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the COR. |
| 1. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical. |
| 1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. |
| 2. Use materials whose installed performance equal or surpasses that of existing materials. |
| 1. Do not close or obstruct roads, without permission from CO. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations. |
| 2. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction. |
| 3. Protect existing site improvements, appurtenances, and landscaping to remain. |
| 1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. |
| 2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces. |
| 3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-sup... |
| 4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. |
| 1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations. |
| Fiber-cement siding. |
| Vented fiber cement soffit |
| Fascia |
| Verify available warranties and warranty periods for fiber-cement siding and soffit. |
| Warranty Period: 10 years from date of Substantial Completion. |
| Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: |
| Finish for Aluminum Flashing: Siliconized polyester coating. |
| For fastening to wood, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1 inch into substrate. |
| For fastening to metal, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1/4 inch, or three screw-threads, into substrate. |
| For fastening fiber cement, use hot-dip galvanized fasteners. |
| Install fasteners no more than 24 inches o.c. |
| 1. Warranty Period: |
| 1. Minimum Performance Class: LC. |
| 2. Minimum Performance Grade: 25. |
| 1. Alpen High Performance Products. |
| 2. Kolbe Windows. |
| 3. Milgard Manufacturing, Inc. |
| 4. Pella Corporation. |
| 5. Marvin Windows and Doors. |
| 1. Exterior Color: As selected by COR from manufacturer's full range. |
| 2. Interior Finish: Matching exterior color and finish. |
| 1. Kind: Fully tempered where indicated on Drawings. |
| 1. Glass: ASTM C1036, Type 1, Class 1, q3. |
| 2. Filling: Fill space between glass lites with air. |
| 3. Low-E Coating: Pyrolytic on second surface. |
| 1. Exposed Hardware Color and Finish: As selected by COR from manufacturer's full range. |
| 1. Exposed Fasteners: Do not use exposed fasteners to greatest extent possible. For application of hardware, use fasteners that match finish hardware being fastened. |
| 1. Wall base. |
| 1. Division 1 Section "LEED Requirements" for additional LEED requirements. |
| 1. 48 hours before installation. |
| 2. During installation. |
| 3. 48 hours after installation. |
| 1. Armstrong World Industries, Inc.; <Insert product>. |
| 2. Azrock Commercial Flooring, DOMCO; <Insert product>. |
| 3. Johnsonite; <Insert product>. |
| 1. Use adhesives that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24): |
| 1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of resilient pr... |
| 2. Proceed with installation only after unsatisfactory conditions have been corrected. |
| 1. Do not install resilient products until they are the same temperature as the space where they are to be installed. |
| 1. Outside Corners: Use straight pieces of maximum lengths possible. Form without producing discoloration (whitening) at bends. Shave back of base at points where bends occur and remove strips perpendicular to length of base that are only deep enou... |
| 2. Inside Corners: Use straight pieces of maximum lengths possible. Form by cutting an inverted V-shaped notch in toe of wall base at the point where corner is formed. Shave back of base where necessary to produce a snug fit to substrate. |
| 1. Remove adhesive and other blemishes from exposed surfaces. |
| 2. Sweep and vacuum surfaces thoroughly. |
| 3. Damp-mop surfaces to remove marks and soil. |
| 1. Woven carpet. |
| 1. Warranty Period: 10 years from date of Substantial Completion. |
| 1. Mohawk Group (The); Mohawk Carpet, LLC. |
| 2. PacifiCrest Mills, Inc. |
| 3. Stanton Carpet Corporation. |
| 4. Tandus; a Tarkett company. |
| 1. Critical Radiant Flux Classification: Not less than 0.45 W/sq. cm according to NFPA 253. |
| 2. Electrostatic Propensity: Less than 3.0 kV according to AATCC 134. |
| 1. Verify adhesives have a VOC content of 50 g/L or less. |
| 1. Moisture Testing: Perform tests so that each test area does not exceed 1000 sq. ft and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas. |
| 1. Direct-glue-down installation. |
| 1. Stretch-in Carpet Installation: Install carpet cushion seams at 90-degree angle with carpet seams. |