Project_Scope_Water_Treatment_TBFC.pdf

PDF 17 KB Posted

Attached to
Water Treatment Program - Thomas B. Finan Center
Solicitation number
BPM058709
Issued by
Maryland

About this file

This is a Project Scope and Specification document for the Water Treatment Program at Thomas B. Finan Center (TBFC), a Maryland state and local contract opportunity. The contractor shall provide professional water treatment services for HVAC heating and cooling equipment, including furnishing all necessary equipment such as storage containers, meters, and pumps, along with chemical products, ongoing service, and freight. The primary objective is to control biological growth to mitigate equipment damage and operational disruption. A pre-bid meeting is scheduled for September 11, 2026. The contract term is annual and subject to termination by either party with 30 days written notice. The scope of work includes initial setup and application with a qualified vendor representative evaluating the existing HVAC mechanical setup and providing comprehensive guidance for system and chemical application. Ongoing service requires monthly site visits to inspect HVAC water systems, collect water samples, conduct chemical analysis, adjust treatment levels, and provide detailed written reports to TBFC personnel. During the cooling season, the vendor must collect two water samples from the cooling tower for certified laboratory Legionella analysis and formal reporting.

The vendor is required to provide technical support and contingency protocols, including assisting TBFC staff with installation of chemical feed and control equipment upon request. If tracked water parameters fall outside acceptable operational limits or Legionella culture counts are elevated, the vendor must immediately implement pre-planned, documented corrective protocols such as rapid hyperchlorination or automated blowdown adjustments. The vendor shall proactively recommend ongoing improvements for the HVAC water treatment program and overall system maintenance, with monthly reports documenting test parameters, actions taken, adjustments made, and actionable maintenance recommendations. No pricing terms, set asides, incumbent information, funding amounts, or other financial details are specified in this scope document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE & SPECIFICATION

Water Treatment Program

FACILITY: Thomas B. Finan Center (TBFC)

PRE-BID MEETING: September 11, 2026

CONTRACT TERM: Annual (subject to a 30-day written cancellation notice by either party)

1. PROJECT DESCRIPTION

The contractor shall provide professional water treatment services for the heating and cooling equipment at the Thomas

B. Finan Center (TBFC). The vendor is required to furnish all necessary equipment (including storage containers, meters, and pumps), chemical products, ongoing service, and freight.

The primary objective of the water treatment program is to control biological growth, thereby mitigating the risk of equipment damage or operational disruption to the HVAC system.

2. SCOPE OF WORK

Initial Set-up and Application

The vendor shall dispatch a qualified representative to the TBFC site to evaluate the existing HVAC mechanical setup.

The representative will provide comprehensive guidance and oversight for the initial application and setup of HVAC water treatment systems and chemicals.

On-going Service, Treatment, and Testing

A vendor representative shall conduct monthly site visits to the TBFC to perform the following:

Inspect all HVAC water systems, collect water samples, and conduct chemical analysis on treated waters.

Adjust chemical treatment levels as required to maintain optimal parameters.

Provide a detailed written report to designated TBFC personnel documenting service findings, test results, and corrective recommendations.

Supply necessary treatment chemicals specifically designed to control biological growth.

Legionella Testing: During the cooling season, collect two (2) water samples from the cooling tower for certified laboratory analysis and provide formal reporting on Legionella detection.

Recommendations and Reporting

The vendor shall proactively recommend ongoing improvements for the HVAC water treatment program and overall system maintenance.

Monthly reports must outline test parameters, actions taken, adjustments made, and actionable maintenance recommendations.

3. TECHNICAL SUPPORT & CONTINGENCY PROTOCOLS

The vendor shall assist TBFC staff with the installation of required chemical feed and control equipment upon request.

Corrective Action Requirement: If tracked water parameters fall outside acceptable operational limits or if Legionella culture counts are elevated, the vendor must immediately implement pre-planned, documented corrective protocols (e.g., rapid hyperchlorination or automated blowdown adjustments).

Thomas B. Finan Center — HVAC Water Treatment Program Specifications

Water Treatment Program
1. Project Description
2. Scope of Work
Initial Set-up and Application
On-going Service, Treatment, and Testing
Recommendations and Reporting

3. Technical Support & Contingency Protocols

File details come from the government source that posted it. Updated .