Project Matrix Form .xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Repair Ammunition Rail Trestle & Culvert, Naval Weapons Station Earle (NWSE), Colts Neck, New Jersey
- Solicitation number
- N4008525R2611
About this file
This is a project matrix form template requesting previous experience details from potential contractors for a rail trestle and culvert repair project at Naval Weapons Station Earle. The matrix requires contractors to list up to 5 previous projects, including project title, location, completion year, and final construction cost.
The form specifically seeks confirmation of experience in key areas including: reinforced concrete restoration and repair, culvert relining, dewatering, embankment stabilization, damaged culvert/utility repair, construction sequencing/phasing, cofferdam installation, compaction grouting, environmental permitting, and geopolymer mixing/placing. Companies must provide their basic information including DUNS number, CAGE code, address, small business status, and point of contact details. This matrix appears designed to evaluate contractor capabilities for a project involving repair of 16 degraded culverts and railroad embankment grouting work at NWSE.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project_Information_Form.docx | DOCX document | |
| Contractor_Information_Form.docx | DOCX document | |
| 25R2611 Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Matrix
| Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | ||||||
| (year) | Final Construction Cost | Projects exhibiting experience in reinforced concrete restoration and repair, relining of existing culverts, dewatering for construction, and embankment stabilization. (Y/N) | Experience in repair of damaged culvert pipes or utilities. (Y/N) | Experience with sequencing and/or phasing requirements (Y/N) | Experience with cofferdam installation. (Y/N) | Experience with compaction grouting (Y/N) | Experience with environmental permitting planning and submission (Y/N) | Experience in geopolymer mixing and placing (Y/N) |
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 |
Name of Firm/Company DUNS Cage Address SB Status POC POC Contact Information
Name of Firm/Company DUNS Cage Address SB Status POC POC Contact Information