Project Matrix 21R0272.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- N40085-21-R-0272
About this file
This sources sought notice from the Department of the Navy seeks capabilities statements from small businesses for the replacement caisson of Dry Dock 1 located at the Portsmouth Naval Shipyard in Kittery, Maine. Interested vendors must submit capabilities packages including a contractor information form, project information form documenting a minimum of two and maximum of five relevant past construction projects between $10 million to $100 million in costs completed in the last ten years. Projects must demonstrate experience with caisson or naval architecture construction including steel fabrication for graving docks or dry docks, mechanical and electrical systems, and coordination of industrial pumps and controls. Capabilities statements are due by September 23, 2021. The anticipated contract award is February 2022 for offsite fabrication and installation of the replacement caisson, removal and demolition of the existing caisson, and handling of hazardous materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Information Form 21R0272.docx | DOCX document | |
| Contractor Information Form 21R0272.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Size | Scope | Complexity | ||||||||||
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | |||||||||
| (month/year) | Was your firm Prime or Sub? | DB or DBB | DoD / Fed (Y/N) | Final construction cost of $10M or > | Caisson construction or naval architecture construction including but not limited to: caisson for graving dock, marine transportation, floating dry dock, lock closure gates, etc. | a) Construction of a steel caisson gate for graving dry docks or similar steel fabrication of naval architecture, including mechanical and electrical outfitting. | b) Experience with Ship Work Breakdown Systems (SWBS) specifications | c) Coordination and timely commissioning of industrial pump systems and electrical controls. | ||||
| 0 | Example Project - Suzanna Bridge Repairs | Wapatoolie, IL | May-16 | Prime | DBB | N | $14M | Bridge | No | Yes | Yes | |
| 1 | ||||||||||||
| 2 | ||||||||||||
| 3 | ||||||||||||
| 4 | ||||||||||||
| 5 |
File details come from the government source that posted it. Updated .