Project Map.pdf
PDF 10 MB Posted
- Attached to
- ITB - St Marys FY 2025 LMIG Project
- Solicitation number
- PE-66960-NONST-2026-000000048
- Issued by
- Camden County, Georgia
About this file
This is a Project Map document prepared by the City of St. Marys, Georgia Public Works Department for the 2025 Local Maintenance and Improvement Grant (LMIG) Pavement Repair Plan. The project, identified as 2025-1005, involves pavement milling and overlay work on a roadway section in St. Marys, Georgia, with the project originating at the edge of pavement of Colerain Road and terminating at the edge of pavement of Kings Bay Road. The map delineates specific areas requiring milling and overlay operations as well as areas requiring leveling and overlay work. The project encompasses multiple street segments including Mission Forest Drive, Tapique Lane, Tapique Circle, Gary Circle, Cole Rain Road, Kings Bay Road, Aidan Court, Yoa Place, Julian Place, and North Dellwood Place. A significant consideration noted on the map is that pavement adjacent to the median may require the removal of tree roots prior to beginning milling operations. The map was drawn to a scale of 1 inch equals 100 feet and is sealed by a Professional Engineer (License No. 21692) with a seal date of December 3, 2025.
No pricing terms, set asides, incumbent information, funding sources, or contract award details are provided in this project map document. The map serves primarily as a visual planning and reference tool for the identified pavement repair project areas and boundaries rather than as a procurement or bidding document containing procurement-related terms or conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| St Marys LMIG FY 2025 _ Invitation to Bid (Ne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
DELLW
O
O
D PLACE
JULIAN PLACE
YO
A PLACE
AIDAN CT
TAPIQUE CIR
GARY CIR
MISSION FOREST DR
TAPIQUE LANE
TAPIQUE CIR
KINGS BAY ROAD
CO
LE
RA
IN
R
OA
D
GARY CIR
PAVEMENT ADJACENT TO THE MEDIAN MAY
REQUIRE THE REMOVAL OF TREE ROOTS PRIOR
TO BEGINNING THE MILLING OPERATIONS.
NORTH
DRAWN BY :
SCALE :
DATE:
PROJ:
Ph on e (9
) 8
-4
St . M ar ys
, G eo rg ia pw w or ks st m ar ys ga .g ov
O sb or ne S tre et
C ity o f S t.
M ar ys
, G eo rg ia
Pu bl ic W or ks
D ep ar tm en t
ST
. M
AR
YS
LM
IG
P
AV
IN
G
PAVEMENT
REPAIR
PLAN
12-3-25
ACA
1" = 100'
2025-1005
AutoCAD SHX Text
AREAS TO BE MILLED AND OVERLAYED
AutoCAD SHX Text
START PROJECT AT EDGE OF PAVEMENT OF COLERAIN ROAD
AutoCAD SHX Text
END PROJECT AT EDGE OF PAVEMENT OF KINGS BAY ROAD
AutoCAD SHX Text
AREAS TO BE LEVELD AND OVERLAYED
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE SEALED:
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text No. 21692
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text O
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text C.
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text 12-3-25
| Sheets and Views |
| 2025 LMIG |
File details come from the government source that posted it. Updated .