Interior Renovation Project Summary

This Project Manual contains specifications for an interior renovation project at Delta Schoolcraft Intermediate School District (DSISD) in Escanaba, Michigan, prepared by Dynamic Design Group, Inc. The project includes comprehensive interior renovation work consisting of demolition of walls, floor and ceiling finishes, installation of new metal stud wall framing, wall and floor finishes, acoustical ceiling tiles (ACT), doors, hardware, and electrical, mechanical, and plumbing work. Bids are due Friday, May 29, 2026 at 2:00 P.M. EST, with public bid opening the same day at 2:10 P.M. EST. A mandatory prebid meeting for prime contractors is scheduled for Thursday, May 14, 2026 at 9:00 A.M. EST at the project site. The School Board will review and act on bids at a board meeting on June 11, 2026. The project requires a desired completion date of Friday, October 30, 2026, with on-site work beginning on or after Monday, June 22, 2026. The contract is structured as a lump sum (fixed price, stipulated sum) arrangement with a single prime bid competition.

All bidders must submit executed Familial Disclosure Affidavits and Iran Economic Sanctions Act Affidavits with their bids. Bid security is required in the form of a certified check or bid bond payable to the Owner for not less than 5% of the total bid amount. The accepted bidder must provide performance and payment bonds covering the total contract amount. This project is subject to Michigan prevailing wage and fringe benefit requirements under MCL 408.1101 et seq., with current wage rates specified for Delta County trades including carpenters, electricians, plumbers, HVAC workers, laborers, and equipment operators. Plans and specifications are available in hard copy for $150 plus $25 for mailing, or as electronic PDF copies for $25, obtainable from Dynamic Design Group, Inc., with copies also posted at Delta County and Marquette County builder's exchanges. Last requests for substitutions and requests for information are due 7 days prior to the bid due date.

View the file

Other files

File Type Posted
Inerior Renovation Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual including Specifications

Project title:

Interior Renovation Delta Schoolcraft Intermediate School District Escanaba, Michigan

Owner:

2525 3rd Avenue South Escanaba, Michigan 49829

Date: April 30, 2026

DDGi Project No.: 25-4669

Designer:

Dynamic Design Group, inc. 04-30-2026 900 1st Avenue South, Suite A Escanaba, MI 49829 Phone: 906-786-3300 Fax: 906-233-7391

25-4669 / 25-4669 DSISD, Interior Renovation, Escanaba, MI

00 0102 - 1 Project Information

SECTION 00 0102

PROJECT INFORMATION

PART 1 GENERAL

1.01 PROJECT IDENTIFICATION

A. Project Name:

1. Interior Renovation

2. Delta Schoolcraft Intermediate School District (DSISD)

3. Escanaba, Michigan

B. Project Number: 25-4669.

C. The Owner, hereinafter referred to as Owner: Delta Schoolcraft Intermediate School District

(DSISD)

1. Address: 2525 3rd Avenue South

2. City, State, Zip: Escanaba Michigan 49829

D. The Owners representative: Mr. Trent Bellingar.

1.02 NOTICE TO PROSPECTIVE BIDDERS

A. These documents constitute an Invitation to Bid to General Contractors for the construction of the project described below.

1.03 PROJECT DESCRIPTION

A. Summary Project Description: Interior renovation. Including demolition of walls, floor and ceiling finishes. New metal stud wall framing, wall and floor finishes, ACT ceilings, doors, hardware and frames. Electrical, Mechanical and Plumbing work included.

B. Contract Terms: Lump sum (fixed price, stipulated sum).

C. Site Examination: See Section 00 1113 Advertisement for Bids.

1.04 PROJECT CONSULTANTS

A. The Engineer, hereinafter referred to as Engineer: Dynamic Design Group, inc.

1. Address: 900 1st Ave. So., Suite A

2. City, State, Zip: Escanaba, MI 49829

3. Phone/Fax: (906) 786-3300 / (906) 233-7391.

1.05 PROCUREMENT TIMETABLE

A. Last Request for Substitution Due: 7 days prior to due date of bids.

B. Last Request for Information Due: 7 days prior to due date of bids.

C. Bids Due: Friday, May 29, 2026 @ 2:00 P.M. (E.S.T.)

D. Bid Opening: Same day, 2:10 P.M. (E.S.T.) local time.

E. Construction Start: See 00 4100 Bid Form.

F. Substantial Completion Date: See 00 4100 Bid Form.

G. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

00 0110 - 1 Table of Contents

SECTION 00 0110

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

A. 00 0102 - Project Information B. 00 0110 - Table of Contents C. 00 1113 - Advertisement for Bids D. 00 2113 - Instructions to Bidders E. 00 4100 - Bid Form F. Familial Disclosure Affidavit G. Iran Economic Sanction Act Affidavit H. 00 5000 - Contracting Forms and Supplements I. 00 7200 - General Conditions J. General Conditions for Construction Document K. 00 7300 - Supplementary Conditions L. 00 7343 - Prevailing Wage M. Prevailing Wage Rates for State of Michigan Funded Projects - Delta County

SPECIFICATIONS

2.01 DIVISION 01 -- GENERAL REQUIREMENTS

A. 01 2500 - Substitution Procedures B. Substitution Request Form (During Procurement) C. Subsitution Request Form (During Construction) D. 01 3000 - Administrative Requirements E. 01 5000 - Temporary Facilities and Controls F. 01 5713 - Temporary Erosion and Sediment Control G. 01 6000 - Product Requirements H. 01 7000 - Execution and Closeout Requirements I. 01 7800 - Closeout Submittals

2.02 DIVISION 02 -- EXISTING CONDITIONS

A. 02 4100 - Demolition

2.03 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

A. 06 4100 - Architectural Wood Casework

2.04 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

A. 07 2100 - Thermal Insulation B. 07 9200 - Joint Sealants

2.05 DIVISION 08 -- OPENINGS

A. 08 1213 - Hollow Metal Frames B. 08 1313 - Hollow Metal Doors C. 08 1400 - Wood Doors D. 08 4313 - Aluminum-Framed Storefronts E. 08 7100 - Door Hardware

00 0110 - 2 Table of Contents

2.06 DIVISION 09 -- FINISHES

A. 09 2216 - Non-Structural Metal Framing B. 09 2900 - Gypsum Board C. 09 5100 - Acoustical Ceilings D. 09 6500.01 - Resilient Flooring - Base E. 09 6500.02 - Resilient Flooring - Tile F. 09 6813 - Tile Carpeting G. 09 8116 - Acoustical Blanket Insulation H. 09 9123 - Interior Painting

2.07 DIVISION 10 -- SPECIALTIES

A. 10 1100 - Visual Display Units

2.08 DIVISION 12 -- FURNISHINGS

A. 12 3600 - Countertops

00 1113 - 1 Advertisement for Bids

SECTION 00 1113

ADVERTISEMENT FOR BIDS

SINGLE PRIME BIDS WILL BE RECEIVED FOR:

The Project:

Interior Renovation Delta Schoolcraft Intermediate School District (DSISD) Escanaba, Michigan

The Owner:

Delta Schoolcraft Intermediate School District (DSISD) 2525 3rd Avenue South Escanaba Michigan 49829

The Engineer:

Dynamic Design Group, inc., 900 1st Ave., So., Escanaba, MI 49829

To Potential Bidders:

Bids will be accepted by the Owner and are to be delivered to Dynamic Design Group, inc., 900 1st Ave. So., Suite A, Escanaba, MI 49829 on or before, Friday, May 29, 2026 @ 2:00 P.M. (E.S.T.).

Bids will be publicly opened and read aloud in the office of Dynamic Design Group on Thursday, May 29, 2026 @ 2:10 P.M. (E.S.T.). The School Board will review and act on the bids at the board meeting on June 11, 2026.

Project Description:

Interior renovation. Including demolition of walls, floor and ceiling finishes. New metal stud wall framing, wall and floor finishes, ACT ceilings, doors, hardware and frames. Electrical, Mechanical and Plumbing work included.

Prevailing Wage: This project is subject to the prevailing wage and fringe benefit requirements of MCL 408.1101, et seq. The Contractor shall comply with, and ensure that its subcontractors comply with, the Michigan Prevailing Wage Act, MCL 408.1101, et seq.

The School Board will not consider or accept a bid received after the date and time specified for bid submission. Bids shall be accompanied by a completed Familial Disclosure Affidavit and Iran Economic Sanctions Act Affidavit.

Plans and Specifications:

Plans and Specifications will be available on or after Thursday, April 30, 2026.

Terms of Obtaining Plans and Specifications:

Hard Copies: Printed paper documents can be purchased from the Office of the Engineer upon a payment of $150.00 nonrefundable fee plus $25.00 if mailed.

Electronic Copies: PDF copies can be purchased from the Office of the Engineer upon a payment of $25.00 nonrefundable fee. Electronic copies will be emailed n

Plans will be posted at the Delta County and Marquette County builder's exchanges.

Prebid Meeting:

A mandatory prebid meeting for Prime Contractors will be held at the project site on Thursday, May 14, 2026 @ 9:00 a.m. (E.S.T.).

Questions:

Direct all questions to the office of the Engineer: Dynamic Design Group, inc., telephone number (906) 786-3300.

00 1113 - 2 Advertisement for Bids

Bid Security:

Bidders will be required to provide Bid Security in the form of a Certified Check or Bid Bond payable to the Owner for not less than 5% of their total bid amount.

The project will require the Prime contractor to obtain a performance and payment bond in the amount to cover the total contract.

The Owner reserves the right to accept or reject any or all bids.

00 2113 - 1 Instructions to Bidders

SECTION 00 2113

INSTRUCTIONS TO BIDDERS

SUMMARY

1.01 DOCUMENT INCLUDES

A. Invitation

1. Bid Submission

2. Work Identified in Contract Documents

3. Contract Time

B. Bid Documents and Contract Documents

1. Definitions

2. Contract Documents Identification

3. Availability

4. Examination

5. Inquiries/Addenda

C. Site Assessment

1. Site Examination

2. Prebid Conference

D. Bid Submission

1. Submission Procedure

2. Bid Ineligibility

E. Bid Enclosures/Requirements

1. Security Deposit

2. Performance Assurance

3. Insurance

4. Bid Form Requirements

5. Fees for Changes in the Work

6. Bid Form Signature

F. Offer Acceptance/Rejection

1. Duration of Offer

2. Acceptance of Offer

1.02 RELATED DOCUMENTS

A. Document 00 1113 - Advertisement for Bids.

B. Document 00 4100 - Bid Form.

C. Document 00 7300 - Supplementary Conditions:

INVITATION

2.01 BID SUBMISSION

A. Offers submitted after the time listed on the bid form will be returned to the bidder unopened.

B. Offers will be opened publicly immediately after the time for receipt of bids. See time noted on

Advertisement for Bids.

C. Amendments to the submitted offer will be permitted if received in writing prior to bid closing and if endorsed by the same party or parties who signed and sealed the offer.

2.02 WORK IDENTIFIED IN THE CONTRACT DOCUMENTS

A. Work of this proposed Contract comprises building construction, including general construction Work.

2.03 CONTRACT TIME

A. Identify Contract Time in the Bid Form.

00 2113 - 2 Instructions to Bidders

B. Owner requires that under the work of this contract be completed as quickly as possible and consideration will be given to time of completion when reviewing the submitted bids.

BID DOCUMENTS AND CONTRACT DOCUMENTS

3.01 DEFINITIONS

A. Bid Documents: Contract Documents supplemented with Invitation To Bid, Instructions to Bidders, Information Available to Bidders, Bid Form Supplements To Bid Forms and Appendices identified.

B. Bid, Offer, or Bidding: Act of submitting an offer.

C. Bid Amount: Monetary sum identified by the Bidder in the Bid Form.

3.02 CONTRACT DOCUMENTS IDENTIFICATION

A. Contract Documents are identified as Project Number 25-4669, as prepared by Engineer, and with contents as identified in the Table of Contents.

3.03 AVAILABILITY

A. Bid Documents may be obtained at the office of Engineer . Or from the builders exchanges noted on the Invitation to Bid.

3.04 EXAMINATION

A. Bid Documents may be viewed at the office of Engineer. Or from the builders exchanges noted on the Invitation to Bid.

B. Upon receipt of Bid Documents verify that documents are complete. Notify Engineer should the documents be incomplete.

C. Immediately notify Engineer upon finding discrepancies or omissions in the Bid Documents.

3.05 INQUIRIES/ADDENDA

A. Addenda may be issued during the bidding period. All Addenda become part of Contract

Documents. Include resultant costs in the Bid Amount. Addenda will be distributed to ONLY those that obtain plans from our office and to the builders exchanges listed on the Invitation to Bid.

B. Verbal answers are not binding on any party.

SITE ASSESSMENT

4.01 SITE EXAMINATION

A. Examine the project site before submitting a bid.

B. A visit to the project site has been arranged for bidders as follows: See Invitation to Bid

4.02 PREBID CONFERENCE

A. All general contract bidders and suppliers are invited. Manditory for general contractors.

B. Representatives of Engineer will be in attendance.

BID SUBMISSION

5.01 SUBMISSION PROCEDURE

A. Bidders shall be solely responsible for the delivery of their bids in the manner and time prescribed.

B. Submit one copy of the executed offer on the Bid Forms provided, signed and sealed with the required security in a closed opaque envelope, clearly identified with bidder's name, project name and Owner's name on the outside.

C. Improperly completed information, irregularities in security deposit, may be cause not to open the Bid Form envelope and declare the bid invalid or informal.

00 2113 - 3 Instructions to Bidders

5.02 BID INELIGIBILITY

A. Bids that are unsigned, improperly signed or sealed, conditional, illegible, obscure, contain arithmetical errors, erasures, alterations, or irregularities of any kind, may at the discretion of the Owner, be declared unacceptable.

B. Bid Forms, Appendices, and enclosures that are improperly prepared may, at the discretion of Owner, be declared unacceptable.

BID ENCLOSURES/REQUIREMENTS

6.01 SECURITY DEPOSIT

A. Bids shall be accompanied by a security deposit as follows:

1. Bid Bond of a sum no less than 5 percent of the Bid Amount on AIA A310 Bid Bond Form.

2. Certified check in the amount of 5% of the total maximum bid amount.

B. Endorse the Bid Bond in the name of the Owner as obligee, signed and sealed by the principal (Contractor) and surety.

C. Endorse the certified check in the name of the Owner.

D. The security deposit will be returned after delivery to the Owner of the required Performance and Payment Bond(s) by the accepted bidder.

E. Include the cost of bid security in the Bid Amount.

F. If no contract is awarded, all security deposits will be returned.

6.02 PERFORMANCE ASSURANCE

A. Accepted Bidder: Provide a Performance bond as described in 00 7300 - Supplementary

Conditions.

B. Include the cost of performance assurance bonds in the Bid Amount.

6.03 INSURANCE

A. See the General Conditions for the insurance requirements.

B. Include the cost of obtaining and carring insurance through the duration of the project.

6.04 BID FORM REQUIREMENTS

A. Complete all requested information in the Bid Form and Appendices.

6.05 FEES FOR CHANGES IN THE WORK

A. Include the fees for overhead and profit on own Work and Work by subcontractors, identified in

Document 00 7300 - Supplementary Conditions .

B. Include in the Bid Form, the overhead and profit fees on own Work and Work by subcontractors, applicable for Changes in the Work, whether additions to or deductions from the Work on which the Bid Amount is based.

6.06 BID FORM SIGNATURE

A. The Bid Form shall be signed by the bidder, as follows:

1. Sole Proprietorship: Signature of sole proprietor in the presence of a witness who will also sign. Insert the words "Sole Proprietor" under the signature. Affix seal.

2. Partnership: Signature of all partners in the presence of a witness who will also sign.

Insert the word "Partner" under each signature. Affix seal to each signature.

3. Corporation: Signature of a duly authorized signing officer(s) in their normal signatures.

Insert the officer's capacity in which the signing officer acts, under each signature. Affix the corporate seal. If the bid is signed by officials other than the president and secretary of the company, or the president/secretary/treasurer of the company, a copy of the by-law resolution of their board of directors authorizing them to do so, must also be submitted with the Bid Form in the bid envelope.

00 2113 - 4 Instructions to Bidders

6.07 SELECTION AND AWARD OF ALTERNATES

A. If alternates are listed on the bid form:

1. Indicate variation of bid price for Alternates listed on the Bid Form. Unless otherwise indicated, indicate Alternates as a difference in bid price by adding to or deducting from the base bid price.

2. Bids will be evaluated on the base bid price and/or alternates in any order or combination.

OFFER ACCEPTANCE/REJECTION

7.01 DURATION OF OFFER

A. Bids shall remain open to acceptance and shall be irrevocable for a period of sixty (60) days after the bid closing date.

7.02 ACCEPTANCE OF OFFER

A. Owner reserves the right to accept or reject any or all offers.

B. After acceptance by Owner, Engineer on behalf of Owner, will issue to the successful bidder, a written notice of intent.

00 4100 - 1 Bid Form

SECTION 00 4100

BID FORM

PROJECT

Interior Renovation Delta Schoolcraft Intermediate School District (DSISD) Escanaba, Michigan

SUBMIT BID TO:

Dynamic Design Group, inc.

900 1st Ave. So., Suite A Escanaba, MI 49829

THIS BID IS ADDRESSED TO:

Delta Schoolcraft Intermediate School District (DSISD) 2525 3rd Avenue South Escanaba Michigan

BID CLOSES:

Friday, May 29, 2026 @ 2:00 P.M. (E.S.T.)

OFFER:

The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER and agrees to perform and furnish all Work as specified or indicated in the Construction Documents and Bidding Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Bidding documents.

BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to BIDDER’s, including without limitation those dealing with the disposition of Bid security. BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNERS’s Notice of Intent.

IN SUBMITTING THIS BID, BIDDER REPRESENTS, AS MORE FULLY SET FORTH IN THE

AGREEMENT, THAT:

Construction Documents - BIDDER has obtained and carefully studied (or accepts the consequences for not doing so) the entire set of Contract Documents including drawings, specifications, invitation to bid, supporting documents (if issued) and addenda (if issued).

It is the Engineers intent for all parties involved in the preparation of this bid to have in their possession the entire set of Contract Documents from which to prepare their bids(s). BIDDER acknowledges that at no time, was the drawing set and/or specifications separated and issued in parts to parties associated with the preparation of this bid, whether in hard copy or digital format.

BIDDER further acknowledges that all parties involved in the preparation of this bid have obtained and carefully studied the entire set of Contract Documents. It is the responsibility of BIDDER to verify that all parties have reviewed the entire set of Contract Documents.

00 4100 - 2 Bid Form

Addenda – BIDDER has examined and carefully studied any Addenda that has been issued.

Investigations and Examinations - BIDDER - does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.

BIDDER has given Engineer and Owner written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Bidding Documents and the written resolution thereof by Engineer and Owner is acceptance to BIDDER.

The Bidding Documents are generally sufficient to indicate and convey understanding of all terms conditions for performing and furnishing the Work for which this Bid is submitted.

Bidders Obligations - BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, drawings, any conflicts identified in the Construction Documents and Bidding Documents and all additional examinations, and data with the Construction Documents and Bidding Documents that will affect his bid.

Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by Dynamic Design Group, inc., of Escanaba for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the Sum of: THE CONTRACTORS TOTAL BID PRICE.

BASE BID

CONTRACTORS TOTAL BID PRICE

Cost to furnish all labor and materials and the cost of performance and payment bond.

__________________________________________________dollars ($____________________)

ALTERNATE BIDS

Bidder shall state the amount to add to, or deduct from, his Base Bid for the following alternates.

Additions and deductions shall include any modifications of work or additional work that the undersigned may be required to perform by reason of acceptance of the alternate. See applicable sections of the specifications and the drawings for detailed information.

Alternate Bid #1 (Remove/demolish VAV boxes)

State the amount to adjust the base bid to remove/demolish the VAV boxes, ductwork, and piping above and adjacent to Vestibule 128 as detailed on the mechanical plans.

(write in "ADD" or "DEDUCT") _______________________

Cost to furnish all labor and materials, and the cost of performance and payment bond associated with the above-described alternate.

__________________________________________________dollars ($____________________)

00 4100 - 3 Bid Form

All applicable federal taxes are included and State taxes are included in the Bid Sums.

ACCEPTANCE

This offer shall be open to acceptance and is irrevocable for sixty days from the bid closing date.

If this bid is accepted by Owner within the time period stated above, we will:

Execute the Agreement within seven days of receipt of Notice of Intent.

Commence work within seven days after written agreement is executed. Unless an alternate start date is mutually agreed upon.

If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to Owner by reason of our failure, limited in amount to the lesser of the face value of the security deposit or the difference between this bid and the bid upon which a Contract is signed.

In the event our bid is not accepted within the time stated above, the required security deposit shall be returned to the undersigned, in accordance with the provisions of the Instructions to Bidders;

unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time.

CONTRACT TIME

The project has a desired completion date of Friday, October 30, 2026. On-site work may begin on or after Monday, June 22, 2026. State the proposed construction start date and construction completion date.

If this Bid is accepted, and an Owner/Contractor contract/agreement is executed on Tuesday, June 16, 2026, we will:

Begin on-site construction on: __________________________ (Bidder to enter day, month, year).

Complete construction on: ______________________________(Bidder to enter day, month, year).

ADDENDA

The following Addenda have been received. The modifications to the Bid Documents noted below have been considered and all costs are included in the Bid Sum.

Addendum # _______ Dated ________________.

Addendum # _______ Dated ________________.

Addendum # _______ Dated ________________.

Addendum # _______ Dated ________________.

Addendum # _______ Dated ________________.

CONTRACTORS

List your appointed Project Coordinator:

Prime Contractor will be required to designate an on-site Project Coordinator that will represent the Prime Contractor on-site. List the individual:

Project Coordinator: ______________________________________________________________

FAMILIAL DISCLOSURE AFFIDAVIT AND IRAN ECONOMIC SANCTIONS

____Yes ____No - Acknowledge the Familial Disclosure Affidavit has been completed and submitted with the Contractor's Bid Form.

____Yes ____No - Acknowledge the Iran Economic Sanctions Compliance Affidavit has been completed and submitted with the Contractor's Bid Form.

00 4100 - 4 Bid Form

SUB-CONTRACTORS

Masonry subcontractor:___________________________________________________________

Electrical sucontractor:____________________________________________________________

HVAC subcontractor:_____________________________________________________________

Plumbing subcontractor:___________________________________________________________

BID FORM SIGNATURE(S)

Signature and certification:

I hereby certify that all statements herein are made on behalf of:

Insert Corporation, Partnership or Individual Submitting Bid above.

By presenting this bid and signing below, I acknowledge that at no time, did I separate the Contract Documents and/or issue parts of the Contract Documents to any parties involved in the preparation of this bid, either in hard copy or digital format. I further acknowledge that all parties involved in the preparation of this bid have completely reviewed and studied the entire set of Contract Documents.

I have full authority to make such statement and to submit this proposal.

Signature:_____________________________________________________________________

Printed Name:__________________________________________________________________

Company Name:________________________________________________________________

Address:_______________________________________________State_______Zip__________

Phone No.:____________________________________________________________________

Email:_________________________________________________________________________

Witnessed by, Printed Name:_______________________________________________________

Witnessed by, Signature:__________________________________________________________

FAMILIAL DISCLOSURE AFFIDAVIT

All Bids shall be accompanied by a sworn statement disclosing any familial relationship that exists between the owner(s) or any employee of the bidder and any member of the Board of Education of the District, the Superintendent of the District and/or any Delta Schoolcraft Intermediate School District Administrator.

The undersigned, owner or authorized officer of _____________________ (the bidder/contractor), pursuant to the familial disclosure requirement provided in the Delta Schoolcraft Intermediate School District Request for Proposals, hereby represent and warrant, except as provided below, that no familial relationships exist between the bidder/contractor or any employee of the bidder/contractor, and any member of the Delta Schoolcraft Intermediate School District Board of Education, the Superintendent and/or any Delta Schoolcraft Intermediate School District Administrator.

The following are the bidder’s familial relationship(s) with the Delta Schoolcraft Intermediate School District:

Bidder/Contractor Employee Name Related to: Relationship

1.____________________________________________________________

2.____________________________________________________________

There is no familial relationship that exists between the bidder/contractor and/or any employee of the bidder and any member of the Delta Schoolcraft Intermediate School District Board of Education, Superintendent, and/or any Delta Schoolcraft Intermediate School District Administrator.

Bidder:

(Company Name)

By:

(Signature) (Title)

This instrument was acknowledged before me, a Notary Public, in and for ___

County, _____________ on this day of __________________ , 2021

SS:

(Notary Public Signature)

My Commission expires: ________________

Acting in the County of: __________________

SWORN AND NOTARIZED AFFIDAVIT OF COMPLIANCE

IRAN ECONOMIC SANCTIONS ACT

Michigan Public Act No. 517 of 2012

All bidders must submit the following certification statement in compliance with Public Act No. 517 of 2012 (the “Iran Economic Sanctions Act”) and attach this form to the bid.

Delta Schoolcraft Intermediate School District shall not accept a bid that does not include this sworn and notarized certification statement. This form must be completed in its entirety.

The undersigned, the owner or authorized officer of (the

“Bidder”), pursuant to the compliance certification requirement provided in the Delta Schoolcraft Intermediate School District Request for Proposal, hereby certifies, represents and warrants that the Bidder (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, and that in the event the Bidder is awarded a contract as a result of the aforementioned Request for Proposal, the Bidder will not become an “Iran linked business” at any time during the course of performing the work or any services under the contract.

The Bidder further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification is made, whichever is greater, the cost of the Delta Schoolcraft Intermediate School District investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date it is determined that the person has submitted the false certification.

BIDDER:

STATE OF )

)ss.

COUNTY OF )

Name of Bidder By:

Its:

Date:

This instrument was acknowledged before me on the day of , 2021, by .

, Notary Public County, Michigan

My Commission Expires:

Acting in the County of:

00 5000 - 1 Contracting Forms and Supplements

SECTION 00 5000

CONTRACTING FORMS AND SUPPLEMENTS

PART 1 GENERAL

1.01 AGREEMENT AND CONDITIONS OF THE CONTRACT

A. See General Conditions.

B. The Agreement is based on AIA A101. Copies will be made available upon request.

C. The General Conditions are based on AIA A201. Supplementary Conditions are included.

1.02 FORMS

A. Use the following forms for the specified purposes unless otherwise indicated elsewhere in the

Contract Documents.

B. Bond Forms:

1. Bid Bond Form: AIA A310.

2. Performance and Payment Bond Form: AIA A312.

C. Post-Award Certificates and Other Forms:

1. Schedule of Values Form: AIA G703.

2. Application for Payment Forms: AIA G702 with AIA G703 (for Contractors).

1.03 REFERENCE STANDARDS

A. AIA A310 - Bid Bond; 2010.

B. AIA A312 - Performance Bond and Payment Bond; 2010.

C. AIA G702 - Application and Certificate for Payment; 1992.

D. AIA G703 - Continuation Sheet; 1992.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

00 7200 - 1 General Conditions

SECTION 00 7200

GENERAL CONDITIONS

FORM OF GENERAL CONDITIONS

1.01 THE GENERAL CONDITIONS APPLICABLE TO THIS CONTRACT IS ATTACHED FOLLOWING

THIS PAGE.

Contract Type: General Conditions for Construction Page 1 of 44 Document No. GCC201 for the following PROJECT:

Interior Renovation

THE OWNER:

2525 3rd Avenue South

THE ARCHITECT/ENGINEER:

Dynamic Design Group, inc.

900 1st Avenue South, Suite A Escanaba, MI 49829

TABLE OF ARTICLES

1 GENERAL PROVISIONS

2 OWNER

3 CONTRACTOR

4 ARCHITECT/ENGINEER

5 SUBCONTRACTORS

6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS

7 CHANGES IN THE WORK

8 TIME

9 PAYMENTS AND COMPLETION

10 PROTECTION OF PERSONS AND PROPERTY

11 INSURANCE AND BONDS

12 UNCOVERING AND CORRECTION OF WORK

13 MISCELLANEOUS PROVISIONS

14 TERMINATION OR SUSPENSION OF THE CONTRACT

15 CLAIMS AND DISPUTES

Contract Type: General Conditions for Construction Page 2 of 44

INDEX

(Numbers and Topics preceded with '*' are Section Headings)

Acceptance of Nonconforming Work:

9.6.6, 9.9.3, 12.3 Acceptance of Work:

9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work:

3.16, 6.2.1, 12.1 Accident Prevention:

Acts and Omissions:

3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.4.2, 13.7.1, 14.1,15.2 Addenda:

1.1.1, 3.11.1 Additional Costs, Claims for:

3.7.4, 3.7.5, 6.1.1, 7.3.7.5, 10.3,15.1.4 Additional Inspections and Testing:

9.4.2, 9.8.3, 12.2.1, 13.5 Additional Insured 11.1.4 Additional Time, Claims for:

3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2,15.1.5 Administration of the Contract:

3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid:

1.1.1 Aesthetic Effect:

4.2.13 Allowances:

3.8, 7.3.8 All-risk Insurance:

11.3.1, 11.3.1.1 Applications for Payment:

4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7.1, 9.10, 11.1.3 Approvals:

2.1.1, 2.2.2, 2.4, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10, 4.2.7, 9.3.2, 13.5.1 Arbitration:

8.3.1, 11.3.10, 13.1.1, 15.3.2, 15.4

ARCHITECT/ENGINEER:

Architect/Engineer, Definition of:

4.1.1 Architect/Engineer, Extent of Authority:

2.4.1, 3.12.7, 4.1, 4.2, 5.2, 6.3.1, 7.1.2, 7.3.7, 7.4, 9.2.1, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.5.1, 13.5.2, 14.2.2, 14.2.4, 15.1.3, 15.2.1 Architect/Engineer, Limitations of Authority and Responsibility: 2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4.1, 9.4.2, 9.5.3, 9.6.4,15.1.3, 15.2 Architect/Engineer's Additional Services and Expenses:

Architect/Engineer's Administration of the Contract:

3.1.3, 4.2, 3.7.4,15.2, 9.4.1, 9.5 Architect/Engineer's Approvals:

2.4.1, 3.1.3, 3.5.1, 3.10.2, 4.2.7 Architect/Engineer's Authority to Reject Work:

3.5.1, 4.2.6, 12.1.2, 12.2.1 Architect/Engineer's Copyright:

1.1.7,1.5 Architect/Engineer's Decisions:

3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3.1,7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2.1, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.5.2, 15.2,15.3 Architect/Engineer's Inspections:

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1,13.5 Architect/Engineer's Instructions:

3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.5.2 Architect/Engineer's Interpretations:

4.2.11,4.2.12 Architect/Engineer's Project Representative:

4.2.10 Architect/Engineer's Relationship with Contractor:

1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4,3.3.1,3.4.2, 3.5.1, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3.7, 12, 13.4.2, 13.5, 15.2 Architect/Engineer's Relationship with Subcontractors:

1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3.7 Architect/Engineer's Representations:

9.4.2, 9.5.1, 9.10.1 Architect/Engineer’s Site Visits:

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1,13.5 Asbestos:

10.3.1 Attorneys' Fees:

3.18.1, 9.10.2, 10.3.3 Award of Separate Contracts:

6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for Portions of the Work:

5.2 Basic Definitions:

1.1 Bidding Requirements:

1.1.1, 5.2.1, 11.4.1 Binding Dispute Resolution:

9.7.1, 11.3.9, 11.3.10, 13.1.1, 15.2.5, 15.2.6.1, 15.3.1, 15.3.2, 15.4.1 Boiler and Machinery Insurance:

11.3.2 Bonds, Lien:

7.3.7.4, 9.10.2, 9.10.3 Bonds, Performance, and Payment:

7.3.6.4, 9.6.7, 9.10.3, 11.3.9, 11.4 Building Permit:

Contract Type: General Conditions for Construction Page 3 of 44

2.4.1, 11.3.1.1, 12.2.1, 13.5.2, 13.5.3, 14.2.4 3.7.1 Capitalization 1.3

Certificate of Substantial Completion:

9.8.3, 9.8.4, 9.8.5 Certificates for Payment:

4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7.1, 9.10.1, 9.10.3, 14.1.1.3. 14.2.4, 15.1.3 Certificates of Inspection, Testing or Approval:

13.5.4 Certificates of Insurance:

9.10.2, 11.1.3 Change Orders:

1.1.1, 2.4.1, 3.4.2, 3.7.4, 3.8.2.3, 3.11.1, 3.12.8, 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.6, 7.3.9, 7.3.10, 8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.3.1.2,11.3.4, 11.3.9, 12.1.2, 15.1.3 Change Orders, Definition of:

7.2.1

CHANGES IN THE WORK:

2.2.1, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 7.4.1, 8.3.1, 9.3.1.1, 11.3.9 Claims, Definition of:

15.1.1

CLAIMS AND DISPUTES:

3.2.4, 6.1.1, 6.3.1, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4 Claims and Timely Assertion of Claims:

15.4.1 Claims for Additional Cost:

3.2.4, 3.7.4, 6.1.1, 7.3.9, 10.3.2, 15.1.4 Claims for Additional Time:

3.2.4, 3.7.46.1.1, 8.3.2, 10.3.2, 15.1.5 Concealed or Unknown Conditions, Claims for:

3.7.4 Claims for Damages:

3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1, 11.3.5, 11.3.7, 14.1.3, 14.2.4,15.1.6 Claims Subject to Arbitration:

15.3.1. 15.4.1 Cleaning Up:

3.15, 6.3 Commencement of the Work, Conditions Relating to:

2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.3.1, 11.3.6, 11.4.1 15.1.4 Commencement of the Work, Definition of:

8.1.2 Communications Facilitating Contract Administration:

3.9.1, 4.2.4 Completion, Conditions Relating to:

3.4.1, 3.11, 3.15, 4.2.2, 4.2.9. 8.2, 9.4.2, 9.8, 9.9.1, 9.10, 12.2, 13.7, 14.1.2

COMPLETION, PAYMENTS AND:

Completion, Substantial:

Compliance with Laws:

1.6.1, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 10.2.2, 11.1, 11.3, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14.1.1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3 Concealed or Unknown Conditions:

3.7.4, 4.2.8. 8.3.1, 10.3 Conditions of the Contract:

1.1.1, 6.1.1, 6.1.4 Consent, Written:

3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2., 9.3.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 11.3.1, 13.2, 13.4.2, 15.4.4.2 Consolidation or Joinder 15.4.4

CONSTRUCTION BY OWNER OR BY SEPARATE

CONTRACTORS:

1.1.4, 6 Construction Change Directive, Definition of:

7.3.1 Construction Change Directives:

1.1.1, 3.4.2, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, 9.3.1.1 Construction Schedules. Contractor's:

3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Contingent Assignment of Subcontracts:

5.4, 14.2.2.2 Continuing Contract Performance:

15.1.3 Contract, Definition of:

1.1.2

CONTRACT, TERMINATION OR SUSPENSION OF

THE:

5.4.1.1, 11.3.9, 14 Contract Administration:

3.1.3, 4, 9.4, 9.5 Contract Award and Execution, Conditions Relating to:

3.7.1, 3.10, 5.2, 6.1, 11.1.3, 11.3.6, 11.4.1 Contract Documents, The:

1.1.1 Contract Documents, Copies Furnished and Use of:

1.5.2, 2.2.5, 5.3 Contract Documents, Definition of:

1.1.1 Contract Sum:

3.7.4, 3.8, 5.2.3, 7.2, 7.3, 7.4, 9.1, 9.4.2, 9.5.1.4.

9.6.7, 9.7, 10.3.2, 11.3.1, 14.2.4, 14.3.2, 15.1.4, 15.2.5 Contract Sum, Definition of:

9.1 Contract Time:

3.7.4, 3.7.5, 3.10.2, 5.2.3, 7.2.1.3, 7.3.1, 7.3.5, 7.4, 8.1.1, 8.2.1, 8.3.1, 9.5.1, 9.7.1, 10.3.2, 12.1.1, 14.3.2, 15.1.5.1, 15.2.5 Contract Time, Definition of:

Contract Type: General Conditions for Construction Page 4 of 44

4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 13.7

8.1.1

CONTRACTOR:

Contractor, Definition of:

3.1, 6.1.2

Contractor's Construction Schedules:

3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Contractor's Employees:

3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6. 10.2, 10.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1, Contractor's Liability Insurance:

11.1 Contractor's Relationship with Separate Contractors and Owner's Forces:

3.12.5, 3.14.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4 Contractor's Relationship with Subcontractors:

1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2, 11.3.1.2, 11.3.7, 11.3.8 Contractor's Relationship with the Architect/Engineer:

1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9.

10.2.6, 10.3, 11.3.7, 12, 13.5, 15.1.2, 15.2.1 Contractor's Representations:

3.2.1, 3.2.2, 3.5.1, 3.12.6, 6.2.2, 8.2.1. 9.3.3, 9.8.2 Contractor's Responsibility for Those Performing the Work:

3.3.2, 3.18, 5.3.1, 6.1.3, 6.2, 9.5.1,10.2.8 Contractor's Review of Contract Documents:

3.2 Contractor's Right to Stop the Work:

9.7 Contractor's Right to Terminate the Contract:

14.1, 15.1.6 Contractor's Submittals:

3.10, 3.11, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9.10.3, 11.1.3, 11.4.2 Contractor's Superintendent:

3.9, 10.2.6 Contractor's Supervision and Construction Procedures:

1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.5, 7.3.7, 8.2, 10, 12, 14, 15.1.3 Contractual Liability Insurance:

11.1.1.8, 11.2 Coordination and Correlation:

1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1 Copies Furnished of Drawings and Specifications:

1.5, 2.2.5, 3.11 Copyrights:

1.5, 3.17 Correction of Work:

2.3, 2.4, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2, Correlation and Intent of the Contract Documents:

1.2

Damage to Construction of Owner or Separate Contractors:

3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 11.1.1, 11.3, 12.2.4 Damage to the Work:

3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4.1, 11.3.1, 12.2.4 Damages. Claims for:

3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1,

11.3.5. 11.3.7, 14.1.3, 14.2.4, 15.1.6 Damages for Delay:

6.1.1, 8.3.3, 9.5.1.6, 9.7, 10.3.2 Date of Commencement of the Work, Definition of:

8.1.2 Date of Substantial Completion, Definition of:

8.1.3 Day, Definition of:

8.1.4 Decisions of the Architect/Engineer:

3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 15.2, 6.3, 7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2.1, 9.4, 9.5.1, 9.8.4, 9.9.1,13.5.2, 14.2.2, 14.2.4, 15.1, 15.2 Decisions to Withhold Certification:

9.4.1, 9.5, 9.7, 14.1.1.3 Defective or Nonconforming Work, Acceptance, Rejection and Correction of:

2.3.1, 2.4.1, 3.5.1, 4.2.6. 6.2.5, 9.5.1, 9.5.2, 9.6.6, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Defective Work, Definition of:

3.5.1 Definitions:

1.1, 2.1.1, 3.1.1, 3.5.1, 3.12.1, 3.12.2, 3.12.3, 4.1.1, 15.1.1, 5.1, 6.1.2, 7.2.1, 7.3.1. 8.1, 9.1. 9.8.1 Delays and Extensions of Time:

3.2, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4.1, 8.3, 9.5.1, 9.7.1, 10.3.2, 10.4.1, 14.3.2, 15.1.5, 15.2.5 Disputes:

6.3.1, 7.3.9, 15.1, 15.2 Documents and Samples at the Site:

3.11 Drawings, Definition of:

1.1.5 Drawings and Specifications, Use and Ownership of:

3.11 Effective Date of Insurance:

8.2.2, 11.1.2 Emergencies:

10.6, 14.1.1.2, 15.1.4 Employees, Contractor’s:

3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1 Equipment, Labor, Materials or:

1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13.1, Contract Type: General Conditions for Construction Page 5 of 44

Cost, Definition of:

7.3.7 Costs:

2.4.1, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1. 6.2.3, 7.3.3.3, 7.3.7, 7.3.8,7.3.9, 9.10.2, 10.3.2, 10.3.6, 11.3, 12.1.2, 12.2.1, 12.2.4, 13.5, 14 Cutting and Patching:

3.14, 6.2.5

3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7. 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Execution and Progress of the Work:

1.1.3, 1.2.1, I.2.2, 2.2.3, 2.2.5, 3.1, 3.3.1,3.4.1, 3.5.1, 3.7.1, 3.10.1, 3.12, 3.14, 4.2, 6.2.2, 7.1.3, 7.3.5, 8.2, 9.5.1, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3.1, 15.1.3

Extensions of Time:

3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3, 7.4.1, 9.5.1, 9.7.1, 10.3.2, 10.4.1. 14.3, 15.1.5, 15.2.5 Failure of Payment:

9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2, Faulty Work:

(See Defective or Nonconforming Work) Final Completion and Final Payment:

4.2.1, 4.2.9, 9.10, 11.1.2, 11.1.3, 11.3.1, 11.3.5, 12.3.1, 14.2.4, 14.4.3 Financial Arrangements, Owner's:

2.2.1, 13.2.2, 14.1.1.4 Fire and Extended Coverage Insurance:

11.4

GENERAL PROVISIONS:

Governing Law:

13.1 Guarantees (See Warranty) Hazardous Materials:

10.2.4, 10.3 Identification of Subcontractors and Suppliers:

5.2.1 Indemnification:

3.17.1, 3.18, 9.10.2, 10.3.3,10.3.5, 10.3.6, 11.3.1.2, 11.3.7 Information and Services Required of the Owner:

2.1.2, 2.2, 3.2.2, 3.12.4, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2.1, 11.4, 13.5.1, 13.5.2, 14.1.1.4, 14.1.4, 15.1.3 Initial Decision:

15.2 Initial Decision Maker, Definition of :

1.1.8 Initial Decision Maker, Decisions:

14.2.2, 14.2.4, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5 Initial Decision Maker, Extent of Authority:

14.2.2, 14.2.4, 15.1.3, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5 Injury or Damage to Person or Property:

10.2.8, 10.4.1 Inspections:

3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 12.2.1, 13.5 Instructions to Bidders:

1.1.1 Instructions to the Contractor:

3.2.4, 3.3.1, 3.8.1, 5.2.1, 7, 8.2.2, 12, 13.5.2 Instruments of Service, Definition of:

Insurance, Loss of Use:

11.3.3 Insurance, Owner’s Liability:

11.2 Insurance, Property:

10.2.5, 11.3 Insurance, Stored Materials:

9.3.2, 11.4.1.4

INSURANCE AND BONDS

Insurance Companies, Consent to Partial Occupancy:

9.9.1, 11.4.1.5 Insurance Companies, Settlement with:

11.4.10 Intent of the Contract Documents:

1.2.1, 4.2.7, 4.2.12, 4.2.13, 7.4 Interest:

13.6 Interpretation:

1.2.3, 1.4, 4.1.1, 5.1, 6.1.2, 15.1.1 Interpretations, Written:

4.2.11, 4.2.12, 15.1.4 Judgment on Final Award:

15.4.2 Labor and Materials, Equipment:

1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Labor Disputes:

8.3.1 Laws and Regulations:

1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13.1, 4.1.1, 9.6.4, 9.9.1, 10.2.2, 11.1.1, 11.3, 13.1.1, 13.4, 13.5.1, 13.5.2, 13.6.1, 14, 15.2.8, 15.4 Liens:

2.1.2, 9.3.3, 9.10.2, 9.10.4, 15.2.8 Limitations, Statutes of:

12.2.5, 13.7, 15.4.1.1 Limitations of Liability:

2.3.1, 3.2.2, 3.5.1, 3.12.10, 3.17.1, 3.18.1, 4.2.6, 4.2.7, 4.2.12, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 10.2.5, 10.3.3, 11.1.2, 11.2.1, 11.3.7, 12.2.5, 13.4.2 Limitations of Time:

2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, 3.12.5,3.15.1, 4.2.7, 5.2, 5.3.1, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2.1, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.71, 9.8, 9.9, 9.10, 11.1.3, 11.3.1.5,11.3.6,11.3.10,12.2,13.5,13.7,14,15 Loss of Use Insurance:

Contract Type: General Conditions for Construction Page 6 of 44

1.1.7 Insurance:

3.18.1, 6.1.1, 7.3.7, 9.3.2, 9.8.4, 9.9.1, 9.10.2, 11 Insurance, Boiler and Machinery:

11.3.2 Insurance, Contractor’s Liability:

11.1 Insurance Effective Date of 8.2.2, 11.1.2

11.4.3 Material Suppliers:

1.5, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.6, 9.10.5 Materials, Hazardous:

10.2.4, 10.3 Materials, Labor, Equipment and:

1.1.3, 1.1.6, 1.5.1, 3.4.1, 3.5.1. 3.8.2, 3.8.3, 3.12, 3.13.1, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2,

9.3.3. 9.5.1.3, 9.10.2, 10.2.1.2, 10.2.4, 14.2.1.1, 14.2.1.2

Means, Methods. Techniques, Sequences and Procedures of Construction:

3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2 Mechanic's Lien:

2.1.2, 15.2.8 Mediation:

8.3.1, 10.3.5, 10.3.6, 15.2.1, 15.2.5, 15.2.6, 15.3, 15.4.1 Minor Changes in the Work:

1.1.1, 3.12.8, 4.2.8, 7.1, 7.4

MISCELLANEOUS PROVISIONS:

Modifications, Definition of:

1.1.1 Modifications to the Contract:

1.1.1, 1.1.2, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7.1, 10.3.2, 11.3.1 Mutual Responsibility:

6.2 Nonconforming Work, Acceptance of:

9.6.6, 9.9.3, 12.3 Nonconforming Work, Rejection and Correction of:

2.3.1, 2.4.1, 3.5.1, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Notice:

2.2.1, 2.3.1, 2.4.1, 3.2.4, 3.3.1, 3.7.2, 3.12.9, 5.2.1, 9.7.1, 9.10, 10.2.2, 11.1.3, 11.4.6, 12.2.2.1, 13.3.

13.5.1, 13.5.2, 14.1, 14.2, 15.2.8, 15.4.1 Notice, Written:

2.3.1, 2.4.1, 3.3.1, 3.9.2, 3.12.9. 3.12.10, 5.2.1, 9.7.1, 9.10, 10.2.2, 10.3, 11.1.3, 11.3.6, 12.2.2.1, 13.3, 14, 15.2.8, 15.4.1 Notice of Claims 3.7.4, 4.5, 10.2.8, 15.1.2, 15.4 Notice of Testing and Inspections:

13.5.1, 13.5.2 Observations, Contractor's:

3.2, 3.7.4 Occupancy:

2.2.2, 9.6.6, 9.8, 11.3.1.5 Orders, Written:

1.1.1, 2.3, 3.9.2, 7, 8.2.2, 11.3.9, 12.1, 12.2.2.1, 13.5.2, 14.3.1

OWNER:

Owner, Definition of:

2.1.1

Owner's Financial Capability:

2.2.1, 13.2.2, 14.1.1.4 Owner's Liability Insurance:

11.2 Owner's Loss of Use Insurance:

11.3.3 Owner's Relationship with Subcontractors:

1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2 Owner's Right to Carry Out the Work:

2.4, 14.2.2 Owner's Right to Clean Up:

6.3 Owner's Right to Perform Construction and to Award Separate Contracts:

6.1 Owner's Right to Stop the Work:

2.3 Owner's Right to Suspend the Work:

14.3 Owner's Right to Terminate the Contract:

14.2 Ownership and Use of Drawings, Specifications and Other Instruments of Service:

1.1.1, 1.1.6, 1.1.7, 1.5, 2.2.5, .3.2.2, 3.11.1, 3.17.1, 4.2.12, 5.3.1 Partial Occupancy or Use:

9.6.6, 9.9, 11.3.1.5 Patching, Cutting and:

3.14, 6.2.5 Patents:

3.17 Payment, Applications for:

4.2.5, 7.3.9, 9.2.1, 9.3, 9.4, 9.5, 9.6.3, 9.7.1, 9.8.5.

9.10.1, 14.2.3, 14.2.4, 14.4.3 Payment, Certificates for:

4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7.1, 9.10.1, 9.10.3, 13.7, 14.1.1.3, 14.2.4 Payment, Failure of:

9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2, Payment, Final:

4.2.1, 4.2.9, 9.8.2, 9.10, 11.1.2, 11.1.3. 11.4.1, 11.4.5, 12.3.1, 13.7, 14.2.4. 14.4.3 Payment Bond, Performance Bond and:

7.3.7.4, 9.6.7, 9.10.3, 11.4.9, 11.4 Payments, Progress:

9.3. 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3

PAYMENTS AND COMPLETION:

Contract Type: General Conditions for Construction Page 7 of 44

Owner, Information and Services Required of the 2.1.2, 2.2, 3.2.2, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.3.2, 9.6.1,9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2.1, 11.3,13.5.1, 13.5.2, 14.1.1.4, 14.1.4, 15.1.3 Owner's Authority:

1.5, 2.1.1, 2.3.1, 2.4.1, 3.4.2, 3.8.1, 3.12.10, 3.14.2, 4.1.2, 4.1.3, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5.4.1, 6.1, 6.3.1, 7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.1, 9.3.2, 9.5.1, 9.6.4, 9.9.1, 9.10.2, 10.3.2, 11.1.3, 11.3.3, 11.3.10, 12.2.2, 12.3.1, 13.2.2, 14.3, 14.4, 15.2.7

Payments to Subcontractors:

5.4.2, 9.5.1.3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 11.4.8, 14.2.1.2

PCB:

10.3.1 Performance Bond and Payment Bond:

7.3.6.4, 9.6.7, 9.10.3, 11.4.9, 11.4 Permits, Fees and Notices and Compliance with Laws:

2.2.2, 3.7, 3.13, 7.3.7.4, 10.2.2

PERSONS AND PROPERTY, PROTECTION OF:

Polychlorinated Biphenyl:

10.3.1 Product Data, Definition of:

3.12.2 Product Data and Samples, Shop Drawings:

3.1 1 , 3.12, 4.2.7 Progress and Completion:

4.2.2, 8.2, 9.8, 9.9.1, 14.1.4,15.1.3 Progress Payments:

9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3 Project, Definition of the:

1.1.4 Project Representatives:

4.2.10 Property Insurance:

10.2.5, 11.3

PROTECTION OF PERSONS AND PROPERTY:

Regulations and Laws:

1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.4.1, 9.6.4, 9.9.1, 10.2.2, 11.1,11.4, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14, 15.2.8, 15.4 Rejection of Work:

3.5.1, 4.2.6, 12.2.1 Releases and Waivers of Liens:

9.10.2 Representations:

3.2.1, 3.5.1, 3.12.6, 6.2.2. 8.2.1, 9.3.3, 9.4.2, 9.5.1.

9.8.2, 9.10.1 Representatives:

2.1.1, 3.1.1,3.9, 4.1.1, 4.2.1, 4.2.2, 4.2.10, 5.1.1, 5.1.2, 13.2.1 Responsibility for Those Performing the Work:

3.3.2, 3.18, 4.2.3, 5.3.1, 6.1.3, 6.2, 6.3, 9.5.1, 10 Retainage:

9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3 Review of Contract Documents and Field Conditions by Contractor 3.2, 3.12.7, 6.1.3 Review of Contractor’s Submittals by Owner and Architect/Engineer:

3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2, Review of Shop Drawings, Product Data and

Safety Precautions and Programs:

3.3.1, 4.2.2, 4.2.7, 5.3.1, 10.1, 10.2, 10.4 Samples, Definition of:

3.12.3 Samples, Shop Drawings, Product Data and:

3.11, 3.12, 4.2.7 Samples at the Site, Documents and:

3.11 Schedule of Values:

9.2, 9.3.1 Schedules, Construction:

1.4.1.2, 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Separate Contracts and Contractors:

1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 11.4.7, 12.1.2 Shop Drawings, Definition of:

3.12.1 Shop Drawings, Product Data and Samples:

3.11, 3.12, 4.2.7 Site, Use of:

3.13, 6.1.1, 6.2.1 Site Inspections:

3.2.2, 3.3.3, 3.7.1, 4.2, 9.4.2, 9.10.1,13.5 Site Visits, Architect/Engineer's:

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5 Special Inspections and Testing:

4.2.6, 12.2.1, 13.5 Specifications, Definition of the:

1.1.6 Specifications, The:

1.1.1, 1.1.6, 1.2.2, 1.5, 3.11, 3.12.10, 3.17, 4.2.14 Statute of Limitations:

13.7, 15.4.1.1 Stopping the Work:

2.3, 9.7, 10.3, 14.1 Stored Materials:

6.2.1, 9.3.2, 10.2.1.2, 10.2.4, 11.4.1.4 Subcontractor, Definition of:

5.1.1

SUBCONTRACTORS:

Subcontractors, Work by:

1.2.2, 3.3.2, 3.12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2, 9.6.7 Sub contractual Relations:

Contract Type: General Conditions for Construction Page 8 of 44

Samples by Contractor 3.12 Rights and Remedies:

1.1.2, 2.3, 2.4, 3.5.1, 3.7.4, 3.15.2, 4.2.6, 4.5, 5.3, 5.4, 6.1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.2, 12.2.4. 13.4, 14, 15.4 Royalties, Patents and Copyrights:

3.17 Rules and Notices for Arbitration:

15.4.1 Safety of Persons and Property:

10.2, 10.4

5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 11.4.7, 11.4.8, 14.1, 14.2.1 Submittals:

3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.7, 9.2, 9.3, 9.8, 9.9.1, 9.10.2, 9.10.3, 11.1.3 Submittals Schedule:

3.10.2, 3.12.5, 4.2.7 Subrogation, Waivers of:

6.1.1, 11.4.5, 11.3.7 Substantial Completion:

4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3,

12.2. 13.7

Substantial Completion, Definition of:

9.8.1 Substitution of Subcontractors:

5.2.3, 5.2.4 Substitution of Architect/Engineer:

4.1.3 Substitutions of Materials:

3.4.2, 3.5.1, 7.3.8 Sub-subcontractor, Definition of:

5.1.2 Subsurface Conditions:

3.7.4 Successors and Assigns:

13.2 Superintendent:

3.9, 10.2.6 Supervision…

This is the start of the file's text. The full file is on GovTribe.