Project_Information_Form.docx

DOCX document 24 KB Posted

Attached to
P502 Replace MCAS Beaufort Fuel Pier, Marine Corps Air Station Beaufort, South Carolina
Solicitation number
N4008525R2522
Issued by

About this file

This document is a Sources Sought notice for the P502 Replace MCAS Beaufort Fuel Pier project at the Marine Corps Air Station Beaufort in South Carolina. The Naval Facilities Engineering Command, Mid-Atlantic is seeking eligible small businesses capable of performing Design-Bid-Build services for this project, which will replace an existing fuel pier with a new reinforced concrete pile-supported fuel pier and associated infrastructure. The project includes new concrete piles, decking, a storage shed, mooring dolphins, fuel piping, and raising the elevation of the pier and adjacent Quilali Road to address sea level rise. The total construction cost is estimated to be between $25 million and $100 million. Interested small businesses are requested to submit a capabilities package, including project information forms demonstrating relevant experience with fuel transfer facilities and waterfront construction. Responses are due by November 1, 2024. The government will determine if this procurement will be set aside for small businesses after reviewing the industry response to this sources sought notice.

View the file

Other files

File Type Posted
P502 Sources Sought Notice Final X2.docx DOCX document
P502 Sources Sought Notice Final (003).docx DOCX document
Project Matrix Form.xlsx XLSX spreadsheet
Contractor_Information_Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – PROJECT INFORMATION FORM

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| 1|_| 2|_| 3|_| 4|_| 5
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of submission due date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build (fully designed project)

|_| Other (explain):
If Design-Build, provide the following information:
|_| Design accomplished in-house
Lead design firm name:
Years working together:
Address:

10. Provide a detailed description of the project:

11. Percentage of work you self-performed on this project: %.

Provide a detailed description of the work your firm self-performed on this project:

Form may be expanded. Please DO NOT change content of the form

File details come from the government source that posted it. Updated .