Project Information Form 23R2622.docx
DOCX document 24 KB Posted
- Solicitation number
- N4008523R2622
About this file
This document contains a sources sought notice from the Department of the Navy Naval Facilities Engineering Command for structural repair services on Bridge 2 at the Portsmouth Naval Shipyard in Kittery, Maine. The scope of work includes recoating steel elements, steel repairs, miscellaneous repairs to the bridge such as concrete spall repair and scupper replacement, and repaving of the bridge and south approach. Interested small businesses are requested to submit capabilities packages by March 2nd, 2023 demonstrating experience on similar projects over $7.5 million involving historic structure renovation, phased construction, over water work, and steel bridge coating removal and replacement. The North American Industry Classification System code for this project is 237310 for highway, street, and bridge construction up to $45 million. Responses will be used to determine if setting aside the acquisition for small businesses is in the government's best interest.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Matrix 23R2622.xlsx | XLSX spreadsheet | |
| 23R2622 Sources Sought Notice.pdf | ||
| Contractor Information Form 23R2622.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – PROJECT INFORMATION FORM
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.
| 1. |
| Contractor Name: |
| 2. | ||||
| Project No. (check one): | ||||
| |_| 1 | |_| 2 | |_| 3 | |_| 4 | |_| 5 |
| 3. |
| Contract Number: |
| Delivery/Task Order No.: |
| Project Number: |
| Title: |
| Location: |
| 4. |
| Award Date (mm/dd/yy): |
| 5. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of submission due date) |
| This is the |_| total project |_| subcontract price. |
| 6. | ||
| Type of work: | ||
| |_| New Construction | |_| Repair | |_| Renovation |
| 7. |
| Customer/Owner Name: |
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 8. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 9. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build (fully designed project)
| |_| Other (explain): |
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
| Address: |
10. Provide a detailed description of the project:
11. Percentage of work you self-performed on this project: %.
Provide a detailed description of the work your firm self-performed on this project:
Form may be expanded. Please DO NOT change content of the form
File details come from the government source that posted it. Updated .