Project Drawings Summary
This is a set of project drawings prepared by NBP Engineers, Inc. for Fort Valley State University (FVSU) related to boiler replacements in the Gayles-Felton Academic Classroom & Lab Building (ACL) and the Computer Technology and Mathematics Classroom Building (CTM). The project, identified as FVSUB-042023, involves the demolition of existing boilers and the installation of new heating water systems with associated mechanical equipment and controls. The drawings are dated April 18, 2023, and include mechanical room layouts, heating water flow diagrams, HVAC abbreviations and legends, equipment schedules for pumps and boilers, and detailed specifications for piping, electrical connections, and control systems. Two new condensing boilers are specified: BLR-CTM-1 with a 3000 MBH input and BLR-ACL-1 with a 1750 MBH input. The project includes the installation of new heating water pumps with variable frequency drives (VFDs), expansion tanks, chemical feed systems, and direct digital control (DDC) panels for automated system management. The drawings indicate that existing equipment such as cooling towers, air handling units, and condenser systems are to remain operational during and after the renovation.
The project documents provide comprehensive mechanical specifications including boiler operational parameters with efficiencies of 96.0% and 96.2%, pump schedules detailing horsepower and flow rates, and detailed piping diagrams showing connections to existing chilled water and heating water distribution systems. Electrical work includes provisions for new circuit breakers, disconnects, VFD installations, and data communication infrastructure routed to existing electrical panels in both buildings. The drawings note that an existing gas regulator in the ACL mechanical room is to remain in service, with a minimum 10-foot piping section required downstream before connection to the new boiler. The project incorporates safety features including low water level alarms, differential pressure monitoring, and temperature controls. NBP Engineers' Certificate of Authorization (COA#PEF000774) is valid through June 30, 2024, and all drawings are marked "FOR CONSTRUCTION" as of the April 18, 2023 publication date.
Text of this file
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
M0.0
SHEET NO. TITLE
M3.0
ABBREVIATIONS, LEGEND, SCHEDULES, & DETAILS - HVAC
M3.1
M4.1
LARGE SCALE - CTM BUILDING - MECHANICAL RM & CHILLER YARD - DEMOLITION & NEW WORK - HVAC
LARGE SCALE - ACL BUILDING - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC
M4.2 ACL HW FLOW DIAGRAM - HVAC
CTM HW FLOW DIAGRAM - HVAC
FVSU PROJECT No. FVSUB-042023
2023-04-18 FOR CONSTRUCTION
Boiler Replacements
Gayles-Felton Academic Classroom & Lab Building (ACL) -
Computer Technology and Mathematics Classroom Building (CTM) &
FORT VALLEY STATE UNIVERSITY
P:\23010\23010m00.dgn
DATE PLOTTED
DGN FILE
18-APR-2023
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\23010\23010m00.dgn
AS SHOWN
WSH
LTF
WSH
23010
04.18.23
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
B o il e r
R e p la c e m e n ts
G a y le s -F e lt o n A c a d e m ic C la s s ro o m L a b B u il d in g
A C
L
C o m p u te r T e c h n o lo g y a n d M a th e m a ti c s C la s s ro o m B u il d in g
C T
M
F
O R
T V
A L L E
Y S
T A
T E U
N
IV
E R
S
IT
Y
F V S
U P
R O J E
C T N o F
V S
U B -0
F O
R
C
N S T
R U
C T
IO
N
SUMMER WINTER
DESIGN CONDITIONS
OUTSIDE
INSIDE
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
75 F DB / 50% RH
95 F DB / 78 F WB
M0.0
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
GATE VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
GATE VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
CHILLED WATER FLOW
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
CHILLED WATER RETURN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
C.F.M.
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
CHS
CHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
72 F DB
20 F DB
MARK
MBH
INPUT
BOILER
MBH
OUTPUT
BOILER
PRESSURE
OPERATING
GPM
PHASE
VOLT/
EFF. %
MIN.
CONDENSING BOILER SCHEDULE
REMARKS
MARK SERVICE TYPE GPM
MAX. MIN.
EFF. %2
PUMP SCHEDULE
MANUFACTURERS
TACO
REMARKS
DYNAMIC
PATTERSONBELL & GOSSETTFT. H O
RPM
HP
HP-CTM-1, HP-CTM-2
HP-ACL-1, HP-ACL-2 HEATING WATER-ACL
HEATING WATER-CTM
VIL
VIL
1 15
7.5
64.6
61.6
3 x 3 x 1 1
3 x 3 x 9
3 x 3 x 1 1B
2 x 2 x 9.5C
3 x 3 x 1 1
2 x 2 x 9.5
BLR-ACL-1
BLR-CTM-1
96.0
96.2
1 15
120/1
120/1 OFCI
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
BACKFLOW PREVENTER
1"1"
MAKE - UP WATER STATION
GAUGE COCK
ƒ"
PRESSURE REDUCING
VALVE. SET AT
1"
AIR GAP DRAIN
FITTING
1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR
TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE
CLAMPS SAME MATERIAL AS PIPE.
PSI.
GAUGE
GATE VALVE
GATE VALVE
TO FILL POINT
OF SYSTEM
BALL VALVE
QUICK FILL
CONNECTION
TO DOMESTIC COLD
TEST PLUG
GATE VALVE
STRAINER
BALANCE VALVE
CHECK VALVE
PIPES SUPPORT
PRESSURE GAUGE
GAUGE COCK
VERTICAL IN-LINE PUMP DETAIL
VERTICAL INLINE PUMP
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL)
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL)
NOT TO SCALE
WATER SUPPLY (DCW)
NOT TO SCALE
NOT TO SCALE
& DETAILS - HVAC
SCHEDULES,
LEGENDS,
ABBREVIATIONS,
P:\23010\23010m30.dgn
DGN FILE
18-APR-2023
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\23010\23010m30.dgn
AS SHOWN
WSH
LTF
WSH
23010
04.18.23
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
B o il e r
R e p la c e m e n ts
G a y le s -F e lt o n A c a d e m ic C la s s ro o m L a b B u il d in g
A C
L
C o m p u te r T e c h n o lo g y a n d M a th e m a ti c s C la s s ro o m B u il d in g
C T
M
F
O R
T V
A L L E
Y S
T A
T E U
N
IV
E R
S
IT
Y
F V S
U P
R O J E
C T N o F
V S
U B -0
F
N S T
R U
C T
IO
N
STAIR 1
GATE
T
GEN
G
F
STAIR 1
GATE
T
GEN
G
F
COIL
COOLING
FAN/
46\24}
37\24}
COIL
COOLING
FAN/
30/48
72/24
AIR LOUVER
144/96 OUTDOOR
CHS
CHR
C H
R C
H S
HWR
HWS
TO AH-2
3" RUNOUT
FOT
P R
E H
E A
T
IL
FD
R
F L
F
IL
T E
R
P R
E H
E
IL
A C
C E S
E
C T
IO
N
A/P
FD FD
3"
4"
3" 1‚"
48/30
60/30
1"
2•" 1‚"
F L
T E
R
ACCESS SECTION
SUPPORTS
EXISTING CONCRETE
CT-1
C S
C R
6"
6"
CR
CS
COOLING TOWER
EXISTING
M U
W
AP
AP
ACP-2
ACP-1
AH-2
AH-1
C T V
F D
PANELS FOR AHU'S
EXISTING CONTROL
AIR COMPRESSOR
EXISTING CONTROL
REFRIGERATED DRYER
EXISTING
6"
FEED SYSTEM
EXISTING CHEMICAL
EXISTING MOTOR CONTROL CENTER
EXISTING ELECTRIC WATER HEATER
PLUMBING BOARD
EXISTING
EXISTING
EXISTING
EXISTING CONC. PAD
48/30 RA DUCT
EXISTING
FD
ACP
VFD
VFD
CP-1
CP-2
6"
6"
6"CS
6"CR
CHR-1
INLINE AIR PURGER
EF-2
ABOVE DOOR TO REMAIN
EXISTING 36/24 LOUVER
SCREENED OPENING
TERMINATE AT 0'-12" AFF; PROVIDE
EXTEND 20/20 EXHAUST DUCT DN;
INTERLOCK w/EF-2
24"x24" AVD;
MONITOR
REFRIGERANT
EXISTING
20/20
EXPANSION TANK
EXISTING CHW
TP-1
EXISTING
M3.0
COIL
COOLING
FAN/
46\24}
37\24}
COIL
COOLING
FAN/
30/48
72/24
AIR LOUVER
144/96 OUTDOOR
CHS
CHR
C H
R C
H S
HWR
HWS
TO AH-2
3" RUNOUT
FOT
P R
E H
E
IL
FD
R
F L
T E
R
P R
E H
E
IL
A C
C E
C T
IO
N
A/P
FD FD
3"
4"
3" 1‚"
48/30
60/30
1"
2•" 1‚"
F L
T E
R
ACCESS SECTION
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
SCALE:
= 1'-0
4 0 2 4 8
SUPPORTS
EXISTING CONCRETE
CT-1
C S
C R
6"
6"
TO DESIGN FLOW
SET BALANCER
CR
CS
COOLING TOWER
EXISTING
TO CONTROL VALVE
PNEUMATIC CONTROL TUBING
VALVE ASSEMBLY RECONNECT
REUSE EXISTING BYPASS
M U
W
VALVE
CHECK
AP
AP
ACP-2
ACP-1
AH-2
AH-1
C T V
F D
HP-1
HP-2PANELS FOR AHU'S
EXISTING CONTROL
AIR COMPRESSOR
EXISTING CONTROL
REFRIGERATED DRYER
EXISTING
6"
FEED SYSTEM
EXISTING CHEMICAL
EXISTING MOTOR CONTROL CENTER
EXISTING ELECTRIC WATER HEATER
PLUMBING BOARD
EXISTING
EXISTING
EXISTING
EXISTING CONC. PAD
48/30 RA DUCT
EXISTING
FD
SCALE:
= 1'-0
4 0 2 4 8
ACP
VFD
VFD
CP-1
CP-2
6"
6"
6"CS
6"CR
CHR-1
INLINE AIR PURGER
EF-2
ABOVE DOOR TO REMAIN
EXISTING 36/24 LOUVER
SCREENED OPENING
TERMINATE AT 0'-12" AFF; PROVIDE
EXTEND 20/20 EXHAUST DUCT DN;
INTERLOCK w/EF-2
24"x24" AVD;
MONITOR
REFRIGERANT
EXISTING
20/20
EXPANSION TANK
EXISTING CHW
TP-1
EXISTING
CONCRETE PAD TO REMAIN
REMOVE EXISTING BLR-1;
MECHANICAL ROOM - DEMOLITION - HVAC
LARGE SCALE - CTM BUILDING -
HVAC
& CHILLER YARD -
MECHANICAL ROOM
CTM BUILDING -
LARGE SCALE -
MECHANICAL ROOM - NEW WORK - HVAC
LARGE SCALE - CTM BUILDING -
12"{ BOILER FLUE
REMOVE EXISTING
HW EXPANSION TANK
REMOVE EXISTING
REMOVE EXISTING AIR PURGER
DISCONNECT FOR BOILER
REMOVE EXISTING LOCKABLE
CHEMICAL FEED PUMP
EMOVE EXISTING
NEW ACP
NEW HP-CTM-1 VFD
NEW HP-CTM-2 VFD
AND SCREENED OPENING
AIR DUCT WITH DOWN ELBOW
TERMINATE COMBUSTION
M B
U S
T
IO
N
IR
D U
C T
8"{ FLUE
TANGENTIAL AIR SEPARATOR
XT NEW HW EXPANSION TANK
CHEMICAL FEEDER
NEW HW BYPASS
BLR-CTM-1
3"
H W
R
HWS
3"
3"
3"
3"
3"
H P
C T
M
H P
C T
M
NOTES:(THIS SHEET ONLY)
BOILER. REMOVE EXISTING CONDUCTORS. EXISTING CIRCUIT BREAKER CAN BE REUSED.
REMOVE ALL ELECTRICAL ASSOCIATED WITH BOILER BEING REMOVED. EXISTING CONDUIT CAN BE REUSED TO SERVE NEW 1
EXISTING PANEL LM.5
AWG COPPER CONDUCTORS. MAKE ALL FINAL CONNECTIONS TO NEW PUMP.
PUMP SHALL BE WIRED THROUGH NEW VFD WHICH SHALL BE INSTALLED ON WALL IN LOCATION SHOWN. PROVIDE NEW 4#12
BACK TO EXISTING PANEL LM LOCATED AS SHOWN BY NOTE 5. MAKE ALL FINAL CONNECTIONS TO NEW BOILER.
PROVIDE NEW LOCKABLE 30A/3P NON-FUSED DISCONNECT FOR NEW BOILER. PROVIDE NEW 4#12 AWG COPPER CONDUCTORS
TERMINATE ON EXISTING DATA PATCH PANEL.
A CATEGORY 6 PLENUM RATED CABLE DATA DROP FOR NEW CONTROL PANEL. ROUTE CABLE BACK TO BUILDING MDF AND
TO EXISTING 208Y/120 VOLT PANEL LM. PROVIDE A NEW 20A/1P CIRCUIT BREAKER MATCHING PANEL AIC RATING. PROVIDE
PROVIDE NEW 20 AMP, 120 VOLT CIRCUIT FOR NEW CONTROL PANEL. ROUTE #12 AWG COPPER IN • INCH CONDUIT BACK 6
CENTER. REPLACE WITH NEW CIRCUIT BREAKER ONLY BUCKET WITH 20A/3P CIRCUIT BREAKER.
TO SERVE NEW PUMP. REMOVE EXISTING CONDUCTORS. REMOVE EXISTING STARTER BUCKET FROM MOTOR CONTROL
REMOVE ALL ELECTRICAL ASSOCIATED WITH HEATING WATER PUMP BEING REMOVED. EXISTING CONDUIT CAN BE REUSED
OF 2" PIPING BEFORE CONNECTING TO NEW BOILER.
BOILER. EXISTING REGULATOR IS TO REMAIN. ADJUST PIPING DOWNSTREAM FROM REGULATOR TO PROVIDE A MINIMUM 10 FEET
EXISTING BOILER IS SERVED BY A DEDICATED REGULATOR IN THE MECHANICAL ROOM. DISCONNECT GAS PIPING TO EXISTING
6"CHWR
6"CHWS
6"HWS
6"CHWR
8"
B-1
8"{
EXISTING PLUMBING/FIRE PROTECTION
1 ‚" MAKE-UP TO HHW & CHW
OA LOUVER
EXISTING 90"x18"
EXISTING
P-PCHW-1
P-PCHW-1
WATER PUMP STARTER
EXISTING CHILLED
8" CWR TO COOLING TOWER
EXISTING 2" MAKE-UP LINE
P-COND-1
EXISTING
WATER PUMP STARTER
EXISTING CONDENSER
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
M3.1
6" 6"
6"
TOWER MAKE-UP DN
EXISTING 2" COOLING
TO REMAIN
EXISTING ACP
STARTER
WATER PUMP
EXISTING CHILLED
6" 8"
8"
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
DAMPER
BACKDRAFT
DAMPER
BACKDRAFT
TERMINATION
SCREEN OPENING AT
DUCT 0'-12" AFF; PROVIDE
24/24 DN; TERMINATE
EXISTING CHR-1
MONITOR
REFRIGERANT
EXISTING
F-MRE-1B
EXISTING
12/12
24/24 24/24
NOTES:(THIS SHEET ONLY)
NEW WORK - HVAC
DEMOLITION &
MECHANICAL ROOM -
ACL BUILDING -
LARGE SCALE -
MECHANICAL ROOM - NEW WORK - HVAC
LARGE SCALE - ACL BUILDING -
MECHANICAL ROOM - DEMOLITION - HVAC
LARGE SCALE - ACL BUILDING -
COMBUSTION AIR INTAKE
REMOVE EXISTING 8"{ BOILER
BOILER VENT TERMINAL
REMOVE EXISTING HORIZONTAL
2 REMOVE EXISTING COMBUSTION AIR DUCT.
REMOVE EXISTING
REMOVE EXISTING BOILER B-1 AND EXISTING P-B-1.
3 EXISTING WALL OPENING TO BE REUSED.
VFD HP-ACL-1
VFD HP-ACL-2
ACP
CHEMICAL FEEDER
NEW BYPASS
L
U E
10"{ COMBUSTION DUCT
WALL FLUE TERMINATION5
TANGENTIAL AIR SEPARATOR.
BOILER. REMOVE EXISTING CONDUCTORS. EXISTING CIRCUIT BREAKER CAN BE REUSED.
REMOVE ALL ELECTRICAL ASSOCIATED WITH BOILER BEING REMOVED. EXISTING CONDUIT MAY BE REUSED TO SERVE NEW 6
BACK TO EXISTING PANEL L1A1 LOCATED AS INDICATED BY NOTE 10. MAKE ALL FINAL CONNECTIONS TO NEW BOILER.
PROVIDE NEW LOCKABLE 30A/3P NON-FUSED DISCONNECT FOR NEW BOILER. PROVIDE NEW 4#12 AWG COPPER CONDUCTORS
EAST OF THIS MECHANICAL ROOM.
EXISTING PANELS L1A1 AND M1A1 ARE LOCATED IN ELECTRICAL ROOM 112B WHICH IS LOCATED APPROXIMATELY 75 FT PLAN
AND TERMINATE ON EXISTING DATA PATCH PANEL.
A CATEGORY 6 PLENUM RATED CABLE DATA DROP FOR NEW CONTROL PANEL. ROUTE CABLE BACK TO BUILDING HUB ROOM
TO EXISTING 208Y/120 VOLT PANEL L1A1. PROVIDE A NEW 20A/1P CIRCUIT BREAKER MATCHING PANEL AIC RATING. PROVIDE
PROVIDE NEW 20 AMP, 120 VOLT CIRCUIT FOR NEW CONTROL PANEL. ROUTE #12 AWG COPPER IN 1/2 INCH CONDUIT BACK 11
CIRCUIT BREAKER TO SERVE THE SECOND NEW PUMP. MATCH PANEL AIC RATING.
PANEL M1A1. REPLACE WITH NEW 25A/3P CIRCUIT BREAKER MATCHING PANEL AIC RATING. PROVIDE A SECOND 25A/3P
TO SERVE ONE OF THE NEW PUMPS. REMOVE EXISTING CONDUCTORS. REMOVE EXISTING 60A/3P CIRCUIT BREAKER FROM
REMOVE ALL ELECTRICAL ASSOCIATED WITH HEATING WATER PUMP BEING REMOVED. EXISTING CONDUIT CAN BE REUSED
30A/3P NON-FUSED DISCONNECT ON THE LINE SIDE OF EACH NEW VFD TO SERVE AS THE LOCAL DISCONNECTING MEANS.
PROVIDE NEW 3/4 INCH CONDUIT FOR THE SECOND PUMP. MAKE ALL FINAL CONNECTIONS TO NEW PUMPS. PROVIDE A LOCAL
AWG COPPER CONDUCTORS FOR EACH PUMP. ONE PUMP CAN REUSE THE EXISTING CONDUIT FEEDING THE PUMP BEING REMOVED.
PUMP SHALL BE WIRED THROUGH NEW VFD WHICH SHALL BE INSTALLED ON WALL IN LOCATION SHOWN. PROVIDE NEW 4#10
TERMINATE COMBUSTION AIR DUCT WITH ELBOW DOWN AND SCREENED OPENING.
BOILER AND RECONNECT GAS TO NEW BOILER.
EXISTING BOILER HAS A DEDICATED GAS REGULATOR AND IS SERVED BY A 3" PIPE. DISCONNECT GAS PIPING FROM EXISTING
HW PUMP STARTER
REMOVE EXISTING
6"HWR
TREATMENT TO REMAIN
EXISTING CT CHEMICAL
REMOVE EXISTING HW EXPANSION TANK
EXISTING HW EXPANSION TANK TO REMAIN
EXISTING
REMOVE
HWR
HWS
STACKED
HP-ACL-2
HP-ACL-1 &
1 1
BLR-ACL-1
EXISTING
F-MRE-1A
XT
6"
TANK
EXPANSION
NEW HW
HWR
HWS
MUW
PAD
CONCRETE
TO DCW
EXTEND
6"
6"
6"
10 10.5
E
E.3
E.7
F.2
F
P:\23010\23010m31_ACL.dgn
DATE PLOTTED
DGN FILE
18-APR-2023
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\23010\23010m31_ACL.dgn
AS SHOWN
WSH
LTF
WSH
23010
04.18.23
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
B o il e r
R e p la c e m e n ts
G a y le s -F e lt o n A c a d e m ic C la s s ro o m L a b B u il d in g
A C
L
C o m p u te r T e c h n o lo g y a n d M a th e m a ti c s C la s s ro o m B u il d in g
C T
M
F
O R
T V
A L L E
Y S
T A
T E U
N
IV
E R
S
IT
Y
F V S
U P
R O J E
C T N o F
V S
U B -0
F
N S T
R U
C T
IO
N
10 10.5
E
E.3
E.7
F.2
F
6"CHWR
6"CHWS
6"HWS
6"CHWR
8"
8"{
EXISTING PLUMBING/FIRE PROTECTION
1 ‚" MAKE-UP TO HHW & CHW
OA LOUVER
EXISTING 90"x18"
EXISTING
P-PCHW-1
WATER PUMP STARTER
EXISTING CHILLED
8" CWR TO COOLING TOWER
EXISTING 2" MAKE-UP LINE
P-COND-1
EXISTING
WATER PUMP STARTER
EXISTING CONDENSER
6" 6"
6"
TOWER MAKE-UP DN
EXISTING 2" COOLING
TO REMAIN
EXISTING ACP
STARTER
WATER PUMP
EXISTING CHILLED
6" 8"
8"
DAMPER
BACKDRAFT
TERMINATION
SCREEN OPENING AT
DUCT 0'-12" AFF; PROVIDE
24/24 DN; TERMINATE
F-MRE-1B
EXISTING
12/12
24/24 24/24
6"HWR
TREATMENT TO REMAIN
EXISTING CT CHEMICAL
EXISTING
F-MRE-1A
P:\23010\23010m41.dgn
DGN FILE
18-APR-2023
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\23010\23010m41.dgn
AS SHOWN
WSH
LTF
WSH
23010
04.18.23
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
B o il e r
R e p la c e m e n ts
G a y le s -F e lt o n A c a d e m ic C la s s ro o m L a b B u il d in g
A C
L
C o m p u te r T e c h n o lo g y a n d M a th e m a ti c s C la s s ro o m B u il d in g
C T
M
F
O R
T V
A L L E
Y S
T A
T E U
N
IV
E R
S
IT
Y
F V S
U P
R O J E
C T N o F
V S
U B -0
F
N S T
R U
C T
IO
N
M4.1
NOT TO SCALE
VFD
VSD
VFD
VSD
TT
TT
F.M.
TT
DP
AI
AI
AI
AI
FM
AI
AI DI AO DO
AI DI AO DO
VLV
AI AO
3"
3"
3"
3"
3"
3" 3"
3"
3"
3"
SOFTWAREINPUTSOUTPUTS
ACP
DDC PANEL
INPUT/OUTPUT
SUMMARIES
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
TAG
LOW WATER LEVEL
POINT DESCRIPTION
BLR-1 BOILER
TT-1
TT-2
HWR - (SYSTEM)
HWS - (SYSTEM)
HEATING SYSTEM PUMP-VFD CONTROL
HEATING SYSTEM PUMP-VFD CONTROL
DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP
FM-1 HEATING WATER FLOW METER
BYPASS VALVE
HP-1
HP-2
BOILER PLANT SYSTEM
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS
S Y
S T
M
G
A P
H
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
P
K E
U P
S E
T P
O
IN
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
W
IM
IT
R
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
N O
T E S
C U
R R
E
L A
Y
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E R
A T
A T
U S
D
IF
F
P
R E S
S U
R E
K W
P R
E S
S U
R E
W A
T
O W
S T
E
O W
S T
A T
U S
D R
IV
E
S
T A
T U
S
T R
E
G
F A
IL
U
D E (S
T E S
A
N D
L
O
O
TEMPORARY BOILER
BLIND FLANGE FOR
3"
3"3"3"
TEMPORARY BOILER
BLIND FLANGE FOR
HWS
HWR HWR
HWS
BLR-1
NEW
BOILER
CONTROL
DRAIN w/HOSE END
CONNECTION (TYP) CONCRETE PAD
GAUGE
PRESSURE
AIR RELEASE TANK
ROUTE TO
FLOOR DRAIN
INITIAL FILL PRESSURE. 18 GAL.
EXPANSION TANK, SET 25 PSIG
MIN. ACCEPTANCE VOLUME.
111 GAL. MIN. TANK VOLUME
BLADDER
PURGE
VALVE
CHEMICAL FEED TANK
NEW HP-2
NEW HP-1
1"
1"
PUMP GAUGE (TYP)
1" TO DOMESTIC
WATER
MAKE-UP WATER STATION
ROUTE TO DRAIN
A.A.V.
BYPASS VALVE
CV= 15.0
TO HEATING
EQUIPMENT
COILS
TO HEATING
EQUIPMENT
COILS
VLV-1
DP-1
CTM
3"
3"
CTM HW FLOW DIAGRAM - HVAC
HVAC
FLOW DIAGRAM -
CTM HW
P:\23010\23010m42.dgn
DGN FILE
18-APR-2023
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\23010\23010m42.dgn
AS SHOWN
WSH
LTF
WSH
23010
04.18.23
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
B o il e r
R e p la c e m e n ts
G a y le s -F e lt o n A c a d e m ic C la s s ro o m L a b B u il d in g
A C
L
C o m p u te r T e c h n o lo g y a n d M a th e m a ti c s C la s s ro o m B u il d in g
C T
M
F
O R
T V
A L L E
Y S
T A
T E U
N
IV
E R
S
IT
Y
F V S
U P
R O J E
C T N o F
V S
U B -0
F
N S T
R U
C T
IO
N
M4.2
NOT TO SCALE
VFD
VSD
VFD
VSD
TT
TT
F.M.
TT
DP
AI
AI
AI
AI
FM
AI
AI DI AO DO
AI DI AO DO
VLV
AI AO
6"
6"
6"
6"
6"
6" 6"
6"
6"
6"
SOFTWAREINPUTSOUTPUTS
ACP
DDC PANEL
INPUT/OUTPUT
SUMMARIES
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
TAG
LOW WATER LEVEL
POINT DESCRIPTION
BLR-1 BOILER
TT-1
TT-2
HWR - (SYSTEM)
HWS - (SYSTEM)
HEATING SYSTEM PUMP-VFD CONTROL
HEATING SYSTEM PUMP-VFD CONTROL
DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP
FM-1 HEATING WATER FLOW METER
BYPASS VALVE
HP-1
HP-2
BOILER PLANT SYSTEM
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS
S Y
S T
A P
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
K E
U P
S E
T P
O
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
W
IT
R
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
N O
T E S
C U
R R
E
L A
Y
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E R
A T
A T
U S
D
IF
F
P
R E S
S U
R E
K W
P R
E S
S U
R E
W A
T
O W
S T
E
O W
S T
A T
U S
D R
IV
E
S
T A
T U
S
T R
E
G
F A
IL
U
D E (S
T E S
A
N D
L
O
O
TEMPORARY BOILER
BLIND FLANGE FOR
6"
6"6"6"
TEMPORARY BOILER
BLIND FLANGE FOR
HWS
HWR HWR
HWS
BLR-1
NEW
BOILER
CONTROL
DRAIN w/HOSE END
CONNECTION (TYP) CONCRETE PAD
GAUGE
PRESSURE
AIR RELEASE TANK
ROUTE TO
FLOOR DRAIN
INITIAL FILL PRESSURE. 18 GAL.
EXPANSION TANK, SET 25 PSIG
MIN. ACCEPTANCE VOLUME.
111 GAL. MIN. TANK VOLUME
BLADDER
PURGE
VALVE
CHEMICAL FEED TANK
NEW HP-2
NEW HP-1
1"
1"
PUMP GAUGE (TYP)
1" TO DOMESTIC
WATER
MAKE-UP WATER STATION
ROUTE TO DRAIN
A.A.V.
BYPASS VALVE
CV= 15.0
TO HEATING
EQUIPMENT
COILS
TO HEATING
EQUIPMENT
COILS
VLV-1
DP-1
ACL
6"
6"
ACL HW FLOW DIAGRAM - HVAC
HVAC
FLOW DIAGRAM -
ACL HW
| 23010aCov |
| 23010m00 |
| References |
| tb, 23010tb.dgn |
| 23010m30 |
| References |
| tb, 23010tb.dgn |
| axfp1, 23010a1.dgn |
| axfp2, 23010a1.dgn |
| existing, 23010m30.dgn |
| 23010m31_ACL |
| References |
| afp1, 23010a1_ACL.dgn |
| tb, 23010tb.dgn |
| afp2, 23010a1_ACL.dgn |
| existing, 23010m31_ACL.dgn |
| 23010m41 |
| References |
| tb, 23010tb.dgn |
| 23010m42 |
| References |
| tb, 23010tb.dgn |
Other files
| File | Type | Posted |
|---|---|---|
| Notice of Intent to Award | — | |
| Invitation to Bid | — | |
| Pre-Bid Sign In Sheet | — | |
| Project Manual | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .