This is a Presolicitation notice for a federal pavement preservation project in Kings Canyon National Park's Cedar Grove area, Fresno County, California. The National Park Service (NPS) is soliciting contractors for pavement preservation work on approximately 14.70 miles of roadway and parking areas, with an optional scope including 0.84 miles of asphalt overlay. The estimated project cost ranges between $2,000,000 and $5,000,000, with a tentative solicitation date in Summer/Fall 2026 and a tentative completion date of Fall 2027. The project location is identified by coordinates 36°47'26.13"N, 118°40'4.53"W.

The base scope of work includes earthwork (200 cubic yards of waste removal), aggregate and base course work (1,110 tons of roadway aggregate and 5,200 square yards of full depth reclamation), and asphalt pavement treatments (850 tons of asphalt concrete pavement, 50,000 square yards of Type 2 micro surfacing, 180,000 square yards of Type 3 micro surfacing, crack cleaning and sealing over 17 miles, and asphalt patching totaling 3,580 square yards). The optional scope adds 850 tons of asphalt concrete pavement and 5 tons of blotter material. Incidental construction requirements include 335,000 linear feet of permanent pavement markings, 56 marking symbols, temporary traffic control (2,600 flagging hours for base, 100 hours for option), one traffic control supervisor for 60 days, and temporary traffic control materials. The contractor must provide quality control and assurance, sampling and testing, and construction schedules for the base contract, with rental equipment and general labor required.

View the file

Other files

File Type Posted
Prelim Plans_CA NP KICA PMS(1).pdf PDF
Prelim Letter_CA NP KICA PMS(1) v2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA NP KICA PMS(1), Pavement Preservation Kica Cedar

Grove Kings Canyon National Park – Cedar Grove area

Fresno County, CA

The work consists of pavement preservation.

Project length:

• Base Schedule - 14.70 miles of pavement preservation and parking areas.

• Option X consists of 0.84 miles of asphalt overlay.

Tentative Completion Date: Fall 2027

Tentative Solicitation Date: Summer/Fall 2026

Estimated price range: Between $2,000,000 and $5,000,000

Location: All project work is in Kings Canyon National Park – Cedar Grove area. The approximate latitude and longitude coordinates for the project are: 36°47'26.13"N, 118°40'4.53"W.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-24

B as e

O p ti o n X

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) No

No

153 Contractor Quality Control and Assurance

(yes/no) Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes

155 Schedules for Construction Contracts

(construction schedules) (yes/no) Yes No

B as e

O p ti o

DIVISION 200 – Earthwork

204 Waste 200 CUYD

DIVISION 300 – Aggregate and

Base Courses

302 Roadway Aggregate, Method 2 1,110 TON

304 Full Depth Reclamation, Method 2 (2-Inch

Depth) 5,200 SQYD

DIVISION 400 – Asphalt Pavements

& Surface Treatments

403 Asphalt Concrete Pavement 850 TON

406 Fog Seal

407 Blotter 40 TON 5 TON

409 Micro Surfacing, Type 2 50,000 SQYD

409 Micro Surfacing, Type 3 180,000 SQYD

Cracks, Cleaning, and Sealing 17 MILE

Asphalt Concrete Pavement Patching, Type 1

Asphalt Concrete Pavement Patching, Type 2

380 SQYD

3,200 SQYD

DIVISION 500 – Rigid Pavement

550 Sealing Joints and Cracks

B as e

O p ti o

DIVISION 600 – Incidental

Construction

619 Cattle Guard

622 Rental Equipment (yes/no) Yes

623 General Labor (yes/no) Yes

633 Rumble Strip, Transverse

Permanent Pavement Markings (Type B)

Permanent Pavement Markings, Symbols

(Type B)

335,000 LNFT

56 EACH

635 Temporary Traffic Control – Flagger 2,600 HOUR 100 HOUR

635 Temporary Traffic Control – Pilot Car

635 Temporary Traffic Control – Traffic Control

Supervisor 60 DAY

Temporary Traffic Control, Cone

Temporary Traffic Control, Portable

Changeable Message Sign

Temporary Traffic Control, Pavement Markings

Temporary Traffic Control, Construction Sign

220 EACH

2 EACH

42,000 LNFT

217 SQFT