PROJECT DOSCRIPTION_CA NP KICA PMS(1).pdf
PDF 282 KB Posted
- Solicitation number
- 69056726R000018
About this file
This is a Presolicitation notice for a federal pavement preservation project in Kings Canyon National Park's Cedar Grove area, Fresno County, California. The National Park Service (NPS) is soliciting contractors for pavement preservation work on approximately 14.70 miles of roadway and parking areas, with an optional scope including 0.84 miles of asphalt overlay. The estimated project cost ranges between $2,000,000 and $5,000,000, with a tentative solicitation date in Summer/Fall 2026 and a tentative completion date of Fall 2027. The project location is identified by coordinates 36°47'26.13"N, 118°40'4.53"W.
The base scope of work includes earthwork (200 cubic yards of waste removal), aggregate and base course work (1,110 tons of roadway aggregate and 5,200 square yards of full depth reclamation), and asphalt pavement treatments (850 tons of asphalt concrete pavement, 50,000 square yards of Type 2 micro surfacing, 180,000 square yards of Type 3 micro surfacing, crack cleaning and sealing over 17 miles, and asphalt patching totaling 3,580 square yards). The optional scope adds 850 tons of asphalt concrete pavement and 5 tons of blotter material. Incidental construction requirements include 335,000 linear feet of permanent pavement markings, 56 marking symbols, temporary traffic control (2,600 flagging hours for base, 100 hours for option), one traffic control supervisor for 60 days, and temporary traffic control materials. The contractor must provide quality control and assurance, sampling and testing, and construction schedules for the base contract, with rental equipment and general labor required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prelim Plans_CA NP KICA PMS(1).pdf | ||
| Prelim Letter_CA NP KICA PMS(1) v2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA NP KICA PMS(1), Pavement Preservation Kica Cedar
Grove Kings Canyon National Park – Cedar Grove area
Fresno County, CA
The work consists of pavement preservation.
Project length:
• Base Schedule - 14.70 miles of pavement preservation and parking areas.
• Option X consists of 0.84 miles of asphalt overlay.
Tentative Completion Date: Fall 2027
Tentative Solicitation Date: Summer/Fall 2026
Estimated price range: Between $2,000,000 and $5,000,000
Location: All project work is in Kings Canyon National Park – Cedar Grove area. The approximate latitude and longitude coordinates for the project are: 36°47'26.13"N, 118°40'4.53"W.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-24
B as e
O p ti o n X
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) No
No
153 Contractor Quality Control and Assurance
(yes/no) Yes Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes
155 Schedules for Construction Contracts
(construction schedules) (yes/no) Yes No
B as e
O p ti o
DIVISION 200 – Earthwork
204 Waste 200 CUYD
DIVISION 300 – Aggregate and
Base Courses
302 Roadway Aggregate, Method 2 1,110 TON
304 Full Depth Reclamation, Method 2 (2-Inch
Depth) 5,200 SQYD
DIVISION 400 – Asphalt Pavements
& Surface Treatments
403 Asphalt Concrete Pavement 850 TON
406 Fog Seal
407 Blotter 40 TON 5 TON
409 Micro Surfacing, Type 2 50,000 SQYD
409 Micro Surfacing, Type 3 180,000 SQYD
Cracks, Cleaning, and Sealing 17 MILE
Asphalt Concrete Pavement Patching, Type 1
Asphalt Concrete Pavement Patching, Type 2
380 SQYD
3,200 SQYD
DIVISION 500 – Rigid Pavement
550 Sealing Joints and Cracks
B as e
O p ti o
DIVISION 600 – Incidental
Construction
619 Cattle Guard
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
633 Rumble Strip, Transverse
Permanent Pavement Markings (Type B)
Permanent Pavement Markings, Symbols
(Type B)
335,000 LNFT
56 EACH
635 Temporary Traffic Control – Flagger 2,600 HOUR 100 HOUR
635 Temporary Traffic Control – Pilot Car
635 Temporary Traffic Control – Traffic Control
Supervisor 60 DAY
Temporary Traffic Control, Cone
Temporary Traffic Control, Portable
Changeable Message Sign
Temporary Traffic Control, Pavement Markings
Temporary Traffic Control, Construction Sign
220 EACH
2 EACH
42,000 LNFT
217 SQFT
File details come from the government source that posted it. Updated .