PROJECT DESCRIPTION_WA NP OLYM 115(1).pdf
PDF 176 KB Posted
- Solicitation number
- 69056725B000015
About this file
This document is a solicitation for a storm damage repair project at Olympic National Park in Clallam County, Washington. The project involves stabilizing an embankment with riprap and engineered log jams along 0.1 miles of the Mora Road, located approximately 15 miles west of Forks. The estimated price range is between $2,000,000 and $5,000,000, with a tentative solicitation date in Fall/Winter 2025 and a fixed completion date in Winter 2026.
The work includes extensive environmental design elements such as multiple log barriers of varying lengths and diameters, root wads, fish passage boulders, and untreated timber piles. Additional project requirements cover construction survey, quality control, soil erosion control, earthwork (1.5 acres of clearing and grubbing), roadway excavation, slope reinforcement, and temporary traffic control. The project will utilize FP-24 specifications and requires rental equipment, general labor, turf establishment, and rolled erosion control products.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WA NP OLYM 115(1)_Preliminary Plans.pdf | ||
| WA NP OLYM 115(1)_Prelim Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA NP OLYM 115(1), REPAIR STORM DAMAGE ON MORA ROAD
Olympic National Park
Clallam County, Washington
This Work consists of stabilizing the embankment with riprap and engineered log jams.
Project Location: Approximately 15 Miles W of Forks (city), Clallam County, Washington.
Project Length: 0.1 Miles
Estimated Price Range: Between: Between $2,000,000 and $5,000,000
Tentative Solicitation Date: Fall/Winter 2025
Tentative Fixed Completion Date: Winter 2026
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
DESCRIPTION OF WORK in US CUSTOMARY UNITS
USING FP-24 SPECS
O ne S ch ed ul e
Sc h
N am e
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules (yes/no) Yes
157 Soil Erosion Control (Silt Fence) 721 LNFT
157 Soil Erosion Control (Fiber Roll) 83 LNFT
157 Soil Erosion Control (Floating Turbidity Curtain) 842 LNFT
157 Soil Erosion Control (Stabilized Construction Exit) 3 EACH DIVISION 200 – Earthwork
201 Clearing & Grubbing 1.5 ACRE
204 Roadway Excavation 100 CUYD DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap, Class 5 11,704 CUYD
O ne S ch ed ul e
Sc h
N am e
DIVISION 600 – Incidental Construction
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
625 Turf Establishment (indicate seeding or mulching separately) 1.2 ACRE
629 Rolled Erosion Control Product 2,665 SQYD
626 Plants LPSM
635 Temporary Traffic Control – Barricade Type 3 2 EACH
635 Temporary Traffic Control – Portable Changeable Message Signs 1 EACH
635 Temporary Traffic Control – Construction Sign 4 EACH
647 Environmental Design, Log Barrier, (25ft-length min, 12-in. min dia.) 330 EACH
647 Environmental Design, Log Barrier (45ft-length min, 24-in. min dia.) 79 EACH
647 Environmental Design, Log Barrier (20ft-length min, 18-in. min dia.) 63 EACH
647 Environmental Design, Log Barrier (4ft-length min, 5-in. min dia.) 6,380 EACH
647 Environmental Design, Root Wad, (45ft-length min, 24-in. min dia.) 70 EACH
647 Environmental Design, Root Wad, (25ft-length min, 24-in. min dia.) 70 EACH
647 Environmental Design, Fish Passage Boulder (3 ft Dia.) 234 EACH
647 Environmental Design, Fish Passage Boulder (4 ft Dia.) 158 EACH
647 Environmental Design, Untreated Timber Pile 86 EACH
647 Environmental Design, Streambed Material (Conserved) 6,050 CUYD