PROJECT DESCRIPTION_WA ID MT NP MULTI PMS(1).pdf
PDF 359 KB Posted
- Solicitation number
- 69056722R000017
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA ID NP MULTI PMS(1), Pavement Preservation WHMI/NEPE/BIHO
Beaverhead, MT; Nez Perce and Butte, ID; Wallowa, OR; and
Walla Walla, WA
This work consists of crack sealing, patching, application of chip seal and micro surface treatments, and pavement marking.
Project length: 10.06 miles
Tentative Fixed Completion Date: Summer 2023 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $3 million to $5 million
Location: This project is located in Craters of the Moon National Monument (CRMO), Nez Perce National Historical Park (NEPE) and Whitman Mission National Historic Site (WHMI), respectively.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Ba se
DIVISION 150 – Project Requirements 151 Mobilization (yes/no) Yes 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
DIVISION 200 – Removal of Structures and Obstructions 203 Removal of Structures and Obstructions 1 LPSM DIVISION 400 – Asphalt Pavements & Surface Treatments 406 Fog Seal 65 TON 407 Chip Seal, Type 1C 82,000 SQYD 407 Emulsified Asphalt 150 TON 407 Blotter 40 TON 409 Micro surfacing, Type 2 100,000 SQYD 414 Cracks, Cleaning and Filling 500 LNFT 414 Cracks, Cleaning and Sealing 10 MILE 418 Asphalt Concrete Pavement Patching, Type 1 125 SQYD 418 Asphalt Concrete Pavement Patching, Type 2 2,100 SQYD
Ba se
DIVISION 600 – Incidental Construction 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 633 Rumble Strip 0 SQYD 634 Permanent Pavement Markings (traffic pavement marking, Type
B) 245,000 LNFT
634 Permanent Pavement Markings (symbols, Type B) 100 EACH 635 Temporary Traffic Control (Cone) 220 EACH 635 Temporary Traffic Control (Pavement Markings) 30,500 LNFT 635 Temporary Traffic Control (Construction Sign) 250 SQFT 635 Temporary Traffic Control – Pilot Car 450 HOUR 635 Temporary Traffic Control – Traffic Control Supervisor 70 DAY 635 Temporary Traffic Control – Flagger 2,300 FXHR 635 Temporary Traffic Control – Variable Message Sign 4 Each
File details come from the government source that posted it. Updated .