PROJECT DESCRIPTION_Stoddard Bridge.pdf

PDF 235 KB Posted

Attached to
ID ERFO 2017(1)-29(1), Stoddard Bridge Federal contract opportunity
Solicitation number
69056719B000031
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains a project description and related federal contract opportunity for the ID ERFO 2017(1)-29(1) Stoddard Bridge project. The project description provides specifications for a pedestrian/pack bridge to be constructed 0.08 miles Northwest of Salmon, Idaho, with an estimated price range of $2-3 million and tentative completion date of Fall 2021. The project description includes requirements for construction survey and staking, contractor quality control, erosion control devices, select borrow, structure excavation, permanent ground anchors, rock bolts and dowels, minor crushed aggregate, structural concrete, reinforcing steel, steel structures, timber structures, bridge railing, painting, bearing devices, micropiles, fences, rental equipment, general labor, and temporary traffic control. The related federal contract opportunity is a pre-solicitation for the same Stoddard Bridge project through the Department of Transportation Federal Highway Administration as a small business set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to ID ERFO 2017(1)-29(1), Stoddard Bridge, newest first.
File Type Posted
QA_08-02-2021.pdf PDF
Stoddard Bridge Pre-ad Letter 22JUL21.pdf PDF
Stoddard Pre-Ad Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID ERFO 2017(1)-29(1), Stoddard Bridge

The work is for a Pedestrian/pack Bridge.

Project length: .08 Miles

Tentative Fixed Completion Date: Fall 2021 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $3 million

Location: 60 Miles NW of Salmon, ID

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Fiber Roll 349 LNFT

DIVISION 200 – Earthwork 201 Clearing & Grubbing LPSM 204 Excavation & Embankment Select Borrow 75 CUYD 208 Structure Excavation 100 CUYD

DIVISION 250 – Slope Reinforcement and Retaining Walls 256 Permanent Ground Anchors (ground anchors) 1680 LNFT 260 Rock Bolts & Dowels 190 LNFT

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 14 CUYD

On e S ch ed ul e

Sc h

Na m e

DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures) 59 CUYD 554 Reinforcing Steel 18,000 LB 555 Steel Structures (structures, steel) 76,500 LB 556 Bridge Railing 730 LNFT 557 Timber Structures (structures, timber) 20 MFBM 562 Temporary Works LPSM 563 Painting (structures, painting) 564 Bearing Devices 4 EA 567 Micropiles 248 LNFT 581 Cables and Anchor Components LPSM

DIVISION 600 – Incidental Construction 619 Fences, Gates, Cattle Guards & Bollard Posts Fence Rail 80 LNFT 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 635 Temporary Traffic Control – Flagger 720 Hours 635 Temporary Traffic Control – Construction signs 122 SQFT

Tubular Markers 66 EACH Warning Light 66 Each

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 550 – Bridge Construction

File details come from the government source that posted it. Updated .