PROJECT DESCRIPTION_MT FLAP BOR 2980(1).pdf

PDF 151 KB Posted

Attached to
MT FLAP BOR 2980(1), Sun River Bridge Replacement Federal contract opportunity
Solicitation number
69056724B000016
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is a project description for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project. The work consists of building a new 462-foot long, 3-span precast-post-tensioned girder bridge with a precast concrete deck, about 200 feet downstream of the existing bridge, along with new approach embankments and MSE wall approaches. The project is located 50 miles northwest of Augusta, Montana and is estimated to cost between $10 million to $20 million. The tentative completion date is Fall 2026. The project includes a base schedule with one option, which may include demolition of the existing steel truss bridge. Key elements of the work include construction survey and staking, soil erosion and sediment control, earthwork, slope reinforcement and retaining walls, aggregate and base courses, bridge construction, and incidental construction such as culverts, guardrail, and temporary traffic control. This project is being solicited by the Department of Transportation Federal Highway Administration and will be offered for full and open competition on an unrestricted basis, with the solicitation anticipated to be issued in Fall 2024.

View the file

Other files for this federal contract opportunity

Other files attached to MT FLAP BOR 2980(1), Sun River Bridge Replacement, newest first.
File Type Posted
QA_08-15-2024.pdf PDF
mta-bor298001_Plans_Pre-Solicitation.pdf PDF
Prelim Letter_Sun River Bridge Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT FLAP BOR 2980(1), Sun River Bridge Replacement

Helena-Lewis and Clark National Forest, Lewis and Clark County, Teton

County, Montana

The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and

MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.

The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts. The work may include as an Option demolition of the existing steel truss bridge upon completion of the new structure.

Project length: 0.36 miles

Tentative Fixed Completion Date: Fall 2026

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $10 million to $20 million

Location: 50 miles NW of Augusta, Montana

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

B as e S ch ed u le

O p ti o n X

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes

153 Contractor Quality Control and Assurance (yes/no) Yes Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes

157 Soil Erosion & Sediment Control- Fiber Roll 2800 lnft 1300 lnft

157 Soil Erosion & Sediment Control- Temporary Diversion Berm Yes

158 Watering for Dust Control Yes

DIVISION 200 – Earthwork

201 Clearing & Grubbing 2.5 acre e S ch ed ti o

203 Removal of Structures & Obstructions Signs, Gates, and Cattle Guards

7 each

203 Removal of Structures & Obstructions Fence 215 lnft

203 Removal of Structures & Obstructions Bridge

1 each

204 Excavation & Embankment 3000 cuyd

204 Unclassified Borrow 8000 cuyd

208 Structure Excavation 270 cuyd

211 Roadway Obliteration 3700 lnft

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap 650 lnft

255 Mechanically Stabilized Earth Walls (retaining walls) 4200 sqft

257 Contactor-Designed Retaining Walls (contractor completed designs) Yes

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate 4500 ton

DIVISION 550 – Bridge Construction

551 Driven Piles 440 lnft

552 Structural Concrete (concrete – major structures) 737 cuyd

553 Prestressed Concrete- Deck Panel 92 each

553 Prestressed Concrete- Bulb Tree Girder 1370 lnft

554 Reinforcing Steel 180500 lnft

556 Bridge Railing 965 lnft

564 Bearing Devices 6 each

565 Drilled Shafts 53 lnft

575 Minor Bridge Work Yes

585 Ultra High Performance Concrete 56 cuyd

DIVISION 600 – Incidental Construction

602 Culverts & Drains (indicate one or both) 240 lnft

617 Guardrail 260 lnft

617 Guardrail- Terminal Section 4 each

619 Fences, Gates, Cattle Guards & Bollard Posts 220 lnft

622 Rental Equipment (yes/no) Yes Yes e S ch ed ti o

623 General Labor (yes/no) Yes Yes

624 Topsoil (landscaping & related items) 2 acre 1 acre

625 Turf Establishment (indicate seeding or mulching separately) 2 acre 1 acre

633 Permanent Traffic Control (traffic control devices) 42 sqft

635 Temporary Traffic Control – Flagger 1900 hour

635 Temporary Traffic Control – Devices 109 each

635 Temporary Traffic Control – Plastic Fence 280 lnft

635 Temporary Traffic Control – Signs 276 sqft