Project Description.pdf

PDF 249 KB Posted

Attached to
AK NPS KATM 10(4), Rehabilitate Valley of 10, 000 Smokes Road, Phase IV
Solicitation number
69056722B000025
Issued by

About this file

This project description outlines requirements for a federal construction contract to rehabilitate roads in Katmai National Park in Alaska. The project involves replacing culverts, improving grades, producing and placing aggregate surface course, and making drainage improvements along 22.4 miles of the Valley of 10,000 Smokes Road. Estimated costs range from $1-2 million. The completion date is fall 2023. Contractors must provide construction surveying and quality control, and the solicitation is set aside for small businesses. Relevant work includes erosion control, bridge painting, traffic control devices, and minor bridge work. The related federal contract opportunity on SAM.gov provides additional details such as the solicitation number and agency.

View the file

Other files

File Type Posted
Preliminary Letter.pdf PDF
AK NPS KATM 10(4)_PLANS_PreAd.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project number/name: AK KATM 10(4), Rehabilitate Valley of 10,000 Smokes Road, Phase IV

PROJECT: AK NPS KATM 10(4), Rehabilitate Valley of 10,000 Smokes Road, Phase IV

LOCATION: Fairbanks, Alaska.

WORK: This project consists of Culvert replacement, grade improvements, aggregate production, surface course. The Valley of 10,000 Smokes Road, located in Katmai National Park, is in need of drainage improvements to alleviate persistent maintenance issues. This 22.4-mile project includes spot repairs along the existing aggregate surface roadway, drainage improvements, grade raises, surface course production, placement, and stockpile.

LENGTH: 22.4 Miles.

TENTATIVE COMPLETION DATE: Fall 2023.

CONTRACT TYPE: Sealed Bid.

ESTIMATED PRICE RANGE: Between $1 million and $2 million.

To view the INTERESTED VENDORS LIST you must register as an SAM user and be logged in. Go to https://www.SAM.gov.

THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE.

PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. Registering at ADD TO WATCHLIST box insures notification when solicitation documents are posted. When solicitation documents are issued, the INVITATION FOR BIDS/REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

On e S ch ed ul e

Sc h

Na m e Ba se

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes https://www.fbo.gov/

Project number/name: AK KATM 10(4), Rehabilitate Valley of 10,000 Smokes Road, Phase IV

On e S ch ed ul e

Sc h

Na m e Ba se

157 Soil Erosion & Sediment Control (erosion control devices) LPSM

DIVISION 550 – Bridge Construction 563 Painting (structures, painting) LPSM 563 Containment System LPSM 575 Minor Bridge Work LPSM

DIVISION 600 – Incidental Construction 635 Temporary Traffic Control – Flagger 40 HOUR 635 Temporary Traffic Control – Supervisor LPSM 635 Temporary Traffic Control – Drum 27 EACH 635 Temporary Traffic Control – Traffic Signal System 1 EACH 635 Temporary Traffic Control – Construction Sign 119 SQFT

PROJECT: AK NPS KATM 10(4), Rehabilitate Valley of 10,000 Smokes Road, Phase IV
PROJECT: AK NPS KATM 10(4), Rehabilitate Valley of 10,000 Smokes Road, Phase IV
LOCATION: Fairbanks, Alaska.
LENGTH: 22.4 Miles.
TENTATIVE COMPLETION DATE: Fall 2023.
THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE.
0BDIVISION 550 – Bridge Construction

File details come from the government source that posted it. Updated .