This document provides details for a federal contract opportunity to rehabilitate the Valley of 10,000 Smokes Road in Katmai National Park. The project consists of culvert replacement, grade improvements, aggregate production, and surface course work along a 22.4 mile section of the road. Specific tasks include spot repairs to the existing aggregate surface, drainage upgrades, grade raises, production and placement of surface course material, and stockpiling. The solicitation is being conducted by the Department of Transportation Federal Highway Administration under number 69056722B000025. Responses are due based on the pre-solicitation notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Preliminary Letter.pdf | ||
| Project Description.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i-
"CJ
..1l al
..c: u i-z
"CJ
Qj C:
CJ\
'iii Qj
Cl
.g
I
/ Kotzebue v,\),?��" Nome
.-f(.�Q \'.::, 00 c::;, �nalasl<a
GU If
PACIFIC OCEAN Project Location
ALASKA KEY MAP
TYPE OF CONSTRUCTION:
Grading, Pullout Improvements and Drainage
DESIGN DESIGNATION:
ADT{2019)
ADT (2039)
V e(max)
25MPH
8%
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
PROJECT MANAGER
N. Jones
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
KATMAI NATIONAL PARK
PLANS FOR PROPOSED PROJECT
AK NPS KATM 10(4)
NPS PMIS NO. 218578
Park Headquarters
N
See Sheet A.3
For "Vicinity Map"
REHABILITATE VALLEY OF 10,000 SMOKES
ROAD, PHASE IV
LAKE AND PENINSULA BOROUGH
ALASKA
LENGTH 22.35 MILES
(SPOT IMPROVEMENTS ALONG VALLEY ROAD)
BEGIN PROJECT
01+25
SCALE IN MILES
5 0 10
END PROJECT
1181+52
SQUIRREL CAMP
23+62
MORAINE PIT
(5-MILE PIT}
226+20
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
STATE
AK
INDEX TO SHEETS
A. GENERAL INFORMATION
A.1 TITLE SHEET
PROJECT
NPS KATM 10(4)
A.2 PLAN SYMBOLS AND ABBREVIATIONS
A.3 VICINITY MAP
A.4 BROOKS CAMP VICINITY MAP
B. SUMMARIES
B.1 SUMMARY OF QUANTITIES
C. TYPICAL SECTIONS
C.1-2 DRAINAGE BLANKET DETAILS
C.3 GRADE RAISE & REALIGNMENT DETAILS
D. PLAN SHEETS
D.l TABULATION OF QUANTITIES
D.2-22 PLAN-PLAN
E. MORAINE PIT
E.l MORAINE PIT SITE PLAN
E.2 MORAINE PIT RECLAMATION PLAN
F. EROSION CONTROL
F.1 TABULATION OF EROSION CONTROL QUANTITIES
F.2-F.3 EROSION CONTROL PLAN
F.4 DETAIL W157-1 SILT FENCE
SHEET
NUMBER
A.1
F.5 STD DETAIL 157-5 TEMPORARY DIVERSION CHANNELS
F.6 DETAIL W157-21 FIBER ROLL
G. DRAINAGE
G.1-2 TABULATION OF DRAINAGE QUANTITIES
G.3 STD DETAIL 602-1 METAL PIPE CULVERT
G.4 STD DETAIL 602-2 METAL PIPE CULVERT
COUPLING BAND
G.5 STD DETAIL 602-3 METAL AND PLASTIC
PIPE CULVERT BEDDING
H. TEMPORARY TRAFFIC CONTROL
H.1 TABULATION OF TEMPORARY TRAFFIC
CONTROL QUANTITIES
H.2-6 TEMPORARY TRAFFIC CONTROL DETAILS
I. PERMANENT TRAFFIC CONTROL
I.1 MILE MARKER DELINEATOR DETAILS
APPROVED:
Director, Project Delivery, Western Federal Lands Highway Division
Regional Director, Alaska Region, National Park Service
Superintendent, (Katmai National Park and Preserve)
DATE ____ _
DATE ____ _
DATE ____ _ PRELIMINARY - NOT FOR CONSTUCTIOIN
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
:0
A
M
M a r c h
U
S C c m y f il e s \p w p r o d u c ti o n
\d
\D e t.
W
.d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2NPS KATM 10(4)AK
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
BH
CP GPS
JH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
Fiber Roll or Wattle
DI
PRELIMINARY - N
OT FOR CONSTUCTIOIN
Naknek
Camp
Brooks
ILIUK ARM
BRO
O
KS
LAKE
NORTH ARMNAKNEK LAKE
RIVER
NAKNEK
Park Headquarters
KING SALMON
Overlook
Three Forks
BROOKS LODGE
Lake Camp
Falls Margot 647+89
FIRST RIVER CROSSING
SECOND RIVER CROSSING
851+95
THIRD RIVER CROSSING
892+61
SCALE IN MILES
10 20
23+62
SQUIRREL CAMP
226+20
(STAGING AREA)
MORAINE PIT
992+64
SWAN PIT
M ain ten an ce A rea
B ro ok s L ak e N
PS
0.2 M ile s t
o
,0
S m o k e s R o a d
V a lle y o f
B ro ok s
Ca m p
0.
M ile s to
AK NPS KATM 10(4)
BEGIN PROJECT
AK NPS KATM 10(4)
END PROJECT
01+25
1181+52
NPS PMIS No. 218578 NPS Drwg. KATM/127/177631
BEGIN PROJECT
01+25
AK NPS KATM 10(4)
:3
P
S e p te m b e r
V ic in it y M a p p w
-w o rk
\d \A
K N
P S
K A
T M
(4 a c .d g n
VICINITY MAP
STATE PROJECT
NUMBER
SHEET
AK NPS KATM 10(4) A.3
VICINITY MAP
BROOKS CAMP
A.4
STATE PROJECT
NUMBER
SHEET
D e f a u lt p w
-w o rk
\d \A
K N
P S
K A
T M
(4 a d .d g n
AK NPS KATM 10(4)
:4
J a n u a r y
C h e c k e d b y
D e s ig n e d b y
Brooks Camp
Landing Area
New Spit Barge
Valley of 10,000 Smokes Road
U.S.S. 7623 Private Native Allotment
NPS PMIS No. 218578 Drwg. No. KATM/127/177631
N
NAKNEK LAKE
T R
A
IL
Bridge
45.6
W.L.
47.0
W.L.
Dock
B R O
O K S
Marsh
RIVER
NO SCALE
210+00 to 230+00 (MP 3.9 to MP 4.3 )
Existing ground
Existing ground
2% cross-slope
C le a r in g l im it
C le a r in g l im it
8" compacted depth
Roadway aggregate, method 2
Placed riprap, method A, class 0 class 1, type A, non-woven above and below riprap
Place separation-stabilization geotextile drain at 2 percent cross-slope
Roadway reconditioning to
DRAINAGE BLANKET TYPICAL DETAIL
1:
1:
1:2
1:2
LCLC
C o n s tr u c ti o n l im it o n s tr u c ti o n l im it
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
5'-0"5'-0"
5'-0"
5'-0"
:0
J a n u a r y
D r a in a g e B la n k e t
D e ta il p w
-w o rk
\d \A
K N
P S
K
A T
M C a .d g n
Sheet 1 of 2
DRAINAGE BLANKET DETAIL
STATE PROJECT
NUMBER
AK NPS KATM 10(4) C.1
673+00 to 678+00 (MP 12.8)
279+80 to 281+30 (MP 5.3)
Existing ground
Existing ground
2% cross-slope
C le a r in g l im it
C le a r in g l im it
8" compacted depth
Roadway aggregate, method 2
Placed riprap, method A, class 0 class 1, type A, non-woven above and below riprap
Place separation-stabilization geotextile drain at 2 percent cross-slope
Roadway reconditioning to
DRAINAGE BLANKET TYPICAL DETAIL
1:
1:
1:2
1:2
LC
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
5'-0"5'-0"
5'-0"
5'-0"
:3
D e c e m b e r
D r a in a g e B la n k e t
D e p w
-w o rk \d
\A
K
N P
S
K A
T M
C b .d g n
Sheet 2 of 2
DRAINAGE BLANKET DETAIL
STATE PROJECT
NUMBER
AK NPS KATM 10(4) C.2
of pavement
Existing edge of roadway
Proposed edge
Proposed centerline
Existing centerline
E=1371404.6186
N=1597337.7940
1138+75 realignment
Begin proposed
E=1371653.9343
N=1597354.3880
1141+25 realignment
End of proposed
Surface transition
Surface transition
CL
CL
(Existing)
2% 2%
8-inch compacted depth
Roadway Aggregate, Method 2, A
A ground
Existing ground
Existing r e a li g n m e n t
B e g in
/e n d compacted depth
Method 2, 8-inch
Roadway Aggregate, gravel roadway
Top of existing
(Proposed)
Not To Scale
1:3 1:2
Matchline
Matchline at proposed centerline
Existing ground profile
Radius=2000'
Proposed Alignment, Matchline
Matchline
M in
D it h
4'-0"
5'-0"5'-0"
Existing width variesExisting width varies
50'-0" Transition
50' 50'
250' Alignment shift & grade raise with 50' surface transition on each end
:2 e c e m b e r
P la n
S h e e t] p w
-w o rk
\d \A
K N
P S
K A
T M
C c .d g n
DETAILS
GRADE RAISE & REALIGNMENT
GRADE RAISE & REALIGNMENT
GRADE RAISE & REALIGNMENT
Section A-A
TO EXISTING ROADWAY
CONNECTION DETAIL
Plan View
1138+75 to 1141+25 (MP 21.6)
1138+75 to 1141+25 (MP 21.6)
STATE PROJECT
NUMBER
SHEET
AK NPS KATM 10(4) C.3
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
TABULATION OF QUANTITIES
D.1
STATE PROJECT
NUMBER
SHEET
T a b u la ti o n o f Q u a n ti ti s p w
-w o rk \d
\A
K
N P
S
K A
T M d a .d g n
AK NPS KATM 10(4)
:0
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
NOTE:
1. Do not increase the footprint of the existing pullouts.
06+75 RT
VRAA Maintenance Entrance
23+62
Squirrel Camp
01+25
BEGIN PROJECT
NPS Housing Area
48+07 RT (MP 0.91)
New Honey Pit
56+39 RT (MP 1.06)
Old Honey Pit
N N
E = 1299217.6477
N = 1665529.1216
MP 1 (52+80)
Delineator, type flexible (typ.)
Existing Pullout
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
5 1
5 2
'89.88L =
'45.28T =
'300.00R =
(RT)17°09'56"Δ =
3+51.40PI
'63.75L = '32.15T = '200.00R =
(RT)18°15'43"Δ =
5+82.76PI '78.27L =
'39.19T = '600.00R =
(RT)07°28'26"Δ =
9+28.49PI
'159.57L = '84.30T = '200.00R =
(RT)45°42'47"Δ =
17+85.24PI
'33.34L = '16.83T = '100.00R =
(LT)19°06'13"Δ =
1+44.83PI
'77.81L = '39.80T = '150.00R =
(LT)29°43'15"Δ =
4+62.20PI
'66.86L = '33.75T = '200.00R =
(LT)19°09'16"Δ =
7+70.90PI
'30.69L = '15.35T = '400.00R =
(LT)04°23'45"Δ =
11+03.06PI
'50.85L = '25.48T = '300.00R =
(LT)09°42'39"Δ =
14+02.31PI
'77.30L = '38.70T = '600.00R =
(LT)07°22'53"Δ =
15+39.06PI
'74.35L = '37.24T = '500.00R =
(LT)08°31'12"Δ =
19+53.93PI
'405.15L = '207.02T = '800.00R =
(LT)29°01'01"Δ =
26+63.23PI
.0
.3
T
.4
.2
.1
C 8
.7
.8
.6
T 5
.5
T 1
.9
C 1
C1
.0
P O
B
0 3
'148.34L = '75.03T = '400.00R =
(RT)21°14'54"Δ =
31+02.64PI
'237.60L = '119.95T = '700.00R =
(RT)19°26'51"Δ =
36+41.82PI
'89.06L = '44.56T = '1,000.00R =
(RT)05°06'09"Δ =
39+55.85PI
'91.63L = '46.02T = '400.00R =
(LT)13°07'31"Δ =
32+88.48PI
'132.64L = '68.86T = '200.00R =
(LT)37°59'55"Δ =
52+23.45PI
C 4
:1 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
1+00 to 59+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.2
MP 2 (105+60)
Delineator, type flexible (brown) (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
5 1 0 1 5 1
'101.69L =
'51.97T =
'200.00R =
(RT)29°07'52"Δ =
112+65.06PI
'188.08L = '94.32T = '1,000.00R =
(LT)10°46'34"Δ =
90+58.99PI
'772.06L = '386.56T = '6,000.00R =
(LT)07°22'21"Δ =
97+78.82PI
'29.86L = '14.96T = '200.00R =
(LT)08°33'10"Δ =
114+85.41PI
C 9
PT
PC
:1 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
59+00 to 117+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.3
MP 3 (158+40)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
'15.76L =
'8.31T =
'20.00R =
(RT)45°08'18"Δ =
121+44.80PI
'112.04L = '56.04T = '2,000.00R =
(RT)03°12'35"Δ =
133+50.37PI
'485.96L = '247.88T = '1,000.00R =
(RT)27°50'37"Δ =
142+12.94PI
'15.38L = '8.09T = '20.00R =
(LT)44°03'03"Δ =
121+75.42PI
'58.02L = '29.22T = '200.00R =
(LT)16°37'22"Δ =
144+97.77PI
1+
PC1
1+
0 1
'105.66L = '52.97T = '600.00R =
(RT)10°05'23"Δ =
149+58.17PI
'128.96L = '64.57T = '1,000.00R =
(RT)07°23'19"Δ =
158+21.11PI
'1,205.92L = '621.92T = '2,000.00R =
(RT)34°32'49"Δ =
172+90.97PI
'88.41L = '44.28T = '600.00R =
(LT)08°26'33"Δ =
154+13.12PI '238.20L =
'125.78T = '300.00R =
(LT)45°29'33"Δ =
160+97.93PI
:1 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
117+00 to 175+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.4
226+20 LT (MP 4.28)
Moraine Pit (5-Mile Pit)
216+48 (MP 4.10)
24" CMP
Cleaning Culvert in Place
(See Sheet C.1 for Detail)
210+00 (MP 4.0)
Begin Installing Drainage Blanket
(See Sheet C.1 for Detail)
230+00 (MP 4.35)
End Installing Drainage Blanket
MP 4 (211+20)
Delineator, type flexible (typ.)
Access Road to 5-Mile Pit
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
0 2
'327.10L =
'163.92T =
'2,000.00R =
(RT)09°22'15"Δ =
183+46.45PI
'375.66L = '190.07T = '1,000.00R =
(RT)21°31'25"Δ =
200+62.19PI
'191.55L = '96.07T = '1,000.00R =
(LT)10°58'30"Δ =
188+12.59PI
'134.43L = '68.36T = '300.00R =
(LT)25°40'26"Δ =
195+01.70PI
T1
'1,205.92L = '621.92T = '2,000.00R =
(RT)34°32'49"Δ =
172+90.97PI
5 2
'206.27L = '103.20T = '2,500.00R =
(RT)04°43'39"Δ =
208+30.60PI
'214.76L = '107.45T = '2,500.00R =
(RT)04°55'19"Δ =
219+89.18PI '881.12L =
'447.83T = '2,000.00R =
(RT)25°14'33"Δ =
230+40.35PI
'129.01L = '64.75T = '600.00R =
(LT)12°19'09"Δ =
204+34.67PI
'268.78L = '134.75T = '1,500.00R =
(LT)10°16'00"Δ =
215+83.86PI
:3
J a n u a ry
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
175+00 to 233+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.5
Flooding Section of the Road
(See Sheet C.1 for Detail)
279+80 (MP 5.30)
Begin Installing Drainage Blanket
(See Sheet C.1 for Detail)
281+30 (MP 5.32)
End Installing Drainage Blanket
MP 5 (264+00)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
5 2
'128.82L =
'64.77T =
'500.00R =
(RT)14°45'43"Δ =
261+53.72PI
'329.90L = '165.53T = '1,600.00R =
(LT)11°48'49"Δ =
252+45.00PI
0 2
'193.42L = '98.64T = '400.00R =
(RT)27°42'22"Δ =
274+59.22PI
'105.70L = '53.16T = '400.00R =
(RT)15°08'24"Δ =
286+21.67PI
'811.46L = '412.74T = '1,800.00R =
(LT)25°49'46"Δ =
267+52.19PI
'260.62L = '131.84T = '700.00R =
(LT)21°19'56"Δ =
278+81.80PI
'279.29L = '147.56T = '350.00R =
(LT)45°43'16"Δ =
289+49.15PI
C 2
T 2
T 2
:3
J a n u a ry
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
233+00 to 291+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.6
MP 6 (316+80)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
'408.39L =
'207.08T =
'1,000.00R =
(RT)23°23'57"Δ =
294+38.62PI
'610.25L = '307.52T = '2,000.00R =
(RT)17°28'57"Δ =
301+41.14PI
'376.54L = '190.78T = '950.00R =
(RT)22°42'35"Δ =
312+53.40PI
'63.62L = '31.88T = '400.00R =
(LT)09°06'46"Δ =
297+32.97PI
'162.25L = '81.41T = '800.00R =
(LT)11°37'14"Δ =
307+78.70PI
T 3
C 3
'204.05L = '103.46T = '500.00R =
(RT)23°22'56"Δ =
328+28.55PI
'174.74L = '87.59T = '1,000.00R =
(RT)10°00'43"Δ =
344+04.23PI
'55.18L = '27.77T = '200.00R =
(RT)15°48'28"Δ =
347+87.99PI
'207.31L = '104.03T = '1,000.00R =
(LT)11°52'41"Δ =
339+65.04PI
'108.94L = '54.81T = '400.00R =
(LT)15°36'14"Δ =
346+68.31PI
T3
:2 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
291+00 to 349+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.7
MP 7 (369+60)
Delineator, type flexible (typ.)
'60.07L =
'31.75T =
'75.00R =
(RT)45°53'24"Δ =
355+97.66PI
'101.52L = '52.79T = '150.00R =
(RT)38°46'39"Δ =
360+27.47PI
'187.45L = '96.90T = '300.00R =
(RT)35°48'00"Δ =
364+89.96PI
'144.35L = '75.48T = '200.00R =
(RT)41°21'12"Δ =
371+84.98PI
'168.83L = '86.09T = '350.00R =
(LT)27°38'14"Δ =
350+95.38PI
'91.46L = '47.20T = '150.00R =
(LT)34°56'10"Δ =
358+87.25PI
'232.61L = '153.32T = '140.00R =
(LT)95°11'54"Δ =
367+47.64PI
'105.90L = '53.03T = '800.00R =
(LT)07°35'05"Δ =
374+39.88PI
'106.02L = '56.75T = '120.00R =
(LT)50°37'12"Δ =
376+93.25PI
5+
.33
5+
.51
'225.58L = '115.21T = '450.00R =
(RT)28°43'17"Δ =
379+41.04PI '106.31L =
'55.50T = '150.00R =
(RT)40°36'28"Δ =
386+91.66PI
'121.84L = '61.04T = '800.00R =
(RT)08°43'34"Δ =
391+20.80PI
'213.81L = '107.54T = '800.00R =
(RT)15°18'46"Δ =
394+19.70PI
'167.74L = '87.17T = '250.00R =
(RT)38°26'37"Δ =
399+03.88PI
'104.18L = '57.38T = '100.00R =
(LT)59°41'37"Δ =
388+88.45PI
'563.03L = '293.74T = '800.00R =
(LT)40°19'27"Δ =
403+94.28PI
8+
PC 3
1+
T 3
7+
PC 39
9+
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
:2 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
349+00 to 407+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.8
428+50 (MP 8.11)
32" CMP, 26 LNFT
Cleaning Culvert in Place
Aggregate, Method 2
Install 8" Roadway
410+80 RT (MP 7.78)
Research Bay Overlook
Install 8" Roadway Aggregate, Method 2
411+25 LT (MP 7.78)
Research Bay Overlook
MP 8 (422+40)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
0 4
'97.93L =
'49.97T =
'200.00R =
(RT)28°03'15"Δ =
410+84.22PI
'193.29L = '104.94T = '200.00R =
(RT)55°22'20"Δ =
414+78.21PI
'63.05L = '31.79T = '200.00R =
(RT)18°03'47"Δ =
419+74.66PI
'300.80L = '157.91T = '400.00R =
(RT)43°05'10"Δ =
426+77.56PI
'134.71L = '68.00T = '400.00R =
(LT)19°17'44"Δ =
412+62.43PI
'164.67L = '83.52T = '400.00R =
(LT)23°35'16"Δ =
417+76.52PI
'239.37L = '129.75T = '250.00R =
(LT)54°51'32"Δ =
422+99.82PI
'131.25L = '66.69T = '300.00R =
(LT)25°04'03"Δ =
429+87.23PI
'207.47L = '116.98T = '180.00R =
(RT)66°02'25"Δ =
442+17.54PI
'223.75L = '111.92T = '3,000.00R =
(RT)04°16'24"Δ =
457+31.78PI
'234.65L = '118.84T = '600.00R =
(LT)22°24'27"Δ =
447+51.53PI
'215.77L = '108.07T = '1,500.00R =
(LT)08°14'30"Δ =
462+04.84PI
1+
:2 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
407+00 to 465+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.9
MP 9 (475+20)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
0 4
'2.85L =
'1.42T =
'300.00R =
(RT)00°32'37"Δ =
465+92.55PI
'66.50L = '33.56T = '200.00R =
(RT)19°02'58"Δ =
482+27.73PI
'340.26L = '170.39T = '2,500.00R =
(LT)07°47'53"Δ =
471+37.81PI
'100.08L = '51.11T = '200.00R =
(LT)28°40'11"Δ =
480+72.45PI
'103.31L = '51.84T = '500.00R =
(LT)11°50'17"Δ =
484+06.17PI
'191.31L = '95.95T = '1,000.00R =
(LT)10°57'41"Δ =
490+32.80PI
5 5
'52.48L = '26.24T = '2,000.00R =
(RT)01°30'12"Δ =
497+34.66PI
'103.96L = '52.00T = '1,500.00R =
(RT)03°58'16"Δ =
502+40.79PI
'313.11L = '157.13T = '1,500.00R =
(RT)11°57'36"Δ =
510+28.52PI
'296.15L = '148.63T = '1,400.00R =
(LT)12°07'13"Δ =
505+92.86PI
'337.23L = '170.23T = '1,000.00R =
(LT)19°19'18"Δ =
514+21.15PI
'188.22L = '94.39T = '1,000.00R =
(LT)10°47'02"Δ =
518+10.26PI
'197.17L = '100.19T = '450.00R =
(LT)25°06'18"Δ =
521+60.50PI
2+
T 4
C 5
PC 5
:2 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
465+00 to 523+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.10
MP 10 (528+00)
Delineator, type flexible (typ.)
MP 11 (580+80)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
'243.26L =
'121.89T =
'1,500.00R =
(RT)09°17'30"Δ =
528+89.53PI
'123.55L = '61.93T = '700.00R =
(RT)10°06'45"Δ =
538+09.84PI
'115.13L = '57.74T = '600.00R =
(LT)10°59'40"Δ =
531+19.51PI
'123.53L = '61.89T = '800.00R =
(LT)08°50'51"Δ =
539+84.81PI
'494.59L = '255.49T = '800.00R =
(RT)35°25'21"Δ =
574+49.61PI
:2 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
523+00 to 581+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.11
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
'296.64L =
'148.97T =
'1,300.00R =
(RT)13°04'27"Δ =
582+42.10PI
'73.75L = '37.30T = '200.00R =
(RT)21°07'43"Δ =
591+22.77PI
'195.34L = '99.66T = '400.00R =
(RT)27°58'51"Δ =
600+55.27PI
'382.58L = '191.44T = '4,000.00R =
(RT)05°28'48"Δ =
607+89.85PI
'395.74L = '202.01T = '800.00R =
(LT)28°20'35"Δ =
588+25.07PI
'194.53L = '98.51T = '500.00R =
(LT)22°17'31"Δ =
594+36.42PI
'209.19L = '105.20T = '800.00R =
(LT)14°58'56"Δ =
598+21.76PI
C 5
C 6
'95.44L = '48.65T = '200.00R =
(RT)27°20'32"Δ =
612+04.03PI
'242.10L = '122.72T = '600.00R =
(RT)23°07'08"Δ =
614+78.89PI
'119.41L = '59.73T = '1,500.00R =
(RT)04°33'39"Δ =
619+56.11PI
'75.08L = '37.98T = '200.00R =
(RT)21°30'27"Δ =
627+03.88PI
'48.70L = '24.84T = '100.00R =
(RT)27°54'01"Δ =
630+99.23PI
'51.87L = '26.20T = '150.00R =
(LT)19°48'45"Δ =
610+55.70PI
'29.16L = '15.01T = '50.00R =
(LT)33°24'37"Δ =
617+90.43PI
'206.51L = '139.52T = '120.00R =
(LT)98°36'05"Δ =
624+69.01PI
'101.83L = '55.82T = '100.00R =
(LT)58°20'37"Δ =
629+08.83PI
7+
625+ 36.00
PT
8+
629+54.83
631+99.97 PC
633+10.91 PT
5+
626+ 65.89
PC
7+
630+74.39
631+23.09 PT
:2 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
581+00 to 632+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.12
647+62 to 648+37 Apprx.
First River Crossing
(See Sheet C.1 for Detail)
673+00 (MP 12.75)
Begin Installing Drainage Blanket
(See Sheet C.1 for Detail)
678+00 (MP 12.84)
End Installing Drainage Blanket
Road to Gravel Pit of Gravel Pit
Approximate Location
24-Inch Pipe Culvert
Install 25 LNFT
672+75 (MP 12.74)
Install 8" Roadway Aggregate, Method 2
645+85 RT (MP 12.32)
Grader Back In
MP 12 (633+60)
Delineator, type flexible (typ.)
MP 13 (686+40)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
'147.74L =
'113.02T =
'75.00R =
(RT)112°51'41"Δ =
637+98.74PI
'115.30L = '59.30T = '200.00R =
(RT)33°01'52"Δ =
641+60.79PI
'111.85L = '56.16T = '500.00R =
(RT)12°49'02"Δ =
643+86.13PI
'26.58L = '13.31T = '200.00R =
(RT)07°36'55"Δ =
647+58.44PI
'61.47L = '31.74T = '100.00R =
(RT)35°13'06"Δ =
648+37.98PI
'58.17L = '29.29T = '200.00R =
(RT)16°39'49"Δ =
655+83.39PI
'110.94L = '55.53T = '1,000.00R =
(LT)06°21'22"Δ =
632+55.50PI
'29.95L = '15.02T = '150.00R =
(LT)11°26'18"Δ =
642+82.68PI
'52.84L = '26.44T = '500.00R =
(LT)06°03'18"Δ =
645+80.61PI
'114.25L = '57.83T = '300.00R =
(LT)21°49'15"Δ =
650+29.55PI
'226.68L = '113.83T = '1,000.00R =
(LT)12°59'17"Δ =
653+60.84PI
'108.98L = '54.71T = '500.00R =
(LT)12°29'19"Δ =
660+91.91PI
'377.24L = '223.49T = '280.00R =
(LT)77°11'35"Δ =
667+60.16PI
628+53.00
+92.6
PC
5 6 0 6
'81.03L = '41.08T = '200.00R =
(RT)23°12'49"Δ =
670+33.75PI
'203.28L = '103.06T = '500.00R =
(RT)23°17'37"Δ =
672+12.88PI '108.39L =
'54.41T = '500.00R =
(RT)12°25'15"Δ =
686+00.00PI
'101.04L = '50.56T = '1,000.00R =
(RT)05°47'20"Δ =
692+33.13PI
'78.29L = '39.37T = '300.00R =
(RT)14°57'07"Δ =
694+37.53PI '232.03L =
'116.83T = '800.00R =
(LT)16°37'04"Δ =
683+07.75PI
PT 6
:2
F e b ru a ry
B L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
632+00 to 697+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.13
705+75 (MP 13.36)
24" CMP, 22 LNFT
Cleaning Culvert in Place
Pipe Culvert
Install 22 LNFT 24-Inch
707+05 (MP 13.39)
713+05 (MP 13.50)
18" CMP, 20 LNFT
Protect in Place
714+67 (MP 13.53)
18" CMP, 24 LNFT
Cleaning Culvert in Place
716+51 (MP 13.57)
6" CMP, 20 LNFT
Cleaning Culvert in Place
Pipe Culvert
Install 26 LNFT 36-Inch
721+88 (MP 13.67)
724+66 (MP 13.72)
18" CMP, 24+ LNFT
Protect in Place
N
730+17 (MP 13.82)
18" CMP, 20 LNFT
Cleaning Culvert in Place
740+92 (MP 14.03)
8" CMP, 20 LNFT
Cleaning Culvert in Place
Raise the road grade by 8" Aggregate
Install 20 LNFT 12-Inch Pipe Culvert
749+13 (MP 14.18)
751+70 (MP 14.23)
12" CMP, 20 LNFT
Place
Cleaning Culvert in
MP 14 (739+20)
type flexible (brown) (typ.)
Delineator (Mile Marker), NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
0 7
'51.45L =
'26.31T =
'100.00R =
(RT)29°28'43"Δ =
706+70.81PI
'147.99L = '74.20T = '800.00R =
(RT)10°35'55"Δ =
710+18.64PI
'96.59L = '48.33T = '1,000.00R =
(RT)05°32'03"Δ =
712+17.00PI
'164.56L = '82.47T = '1,000.00R =
(RT)09°25'43"Δ =
718+30.61PI
'395.25L = '198.27T = '2,000.00R =
(LT)11°19'23"Δ =
698+50.88PI
'134.62L = '69.97T = '200.00R =
(LT)38°34'00"Δ =
705+65.92PI
'40.05L = '20.29T = '100.00R =
(LT)22°56'39"Δ =
707+83.17PI
e = ___ '501.70L = '253.21T = '1,500.00R =
(LT)19°09'48"Δ =
721+83.20PI
0 7
'207.65L = '105.34T = '500.00R =
(RT)23°47'40"Δ =
726+92.41PI
'164.52L = '83.01T = '500.00R =
(RT)18°51'11"Δ =
734+36.45PI
'54.06L = '27.71T = '100.00R =
(RT)30°58'30"Δ =
736+90.51PI
'217.45L = '109.40T = '800.00R =
(RT)15°34'24"Δ =
742+66.45PI
'209.55L = '106.33T = '500.00R =
(RT)24°00'45"Δ =
746+81.90PI
'48.34L = '24.65T = '100.00R =
(RT)27°41'57"Δ =
749+12.18PI
'73.99L = '45.64T = '50.00R =
(RT)84°46'57"Δ =
751+78.36PI
'72.40L = '36.38T = '300.00R =
(LT)13°49'41"Δ =
728+91.58PI
'79.60L = '39.93T = '400.00R =
(LT)11°24'05"Δ =
732+28.34PI
'36.23L = '18.20T = '150.00R =
(LT)13°50'19"Δ =
736+05.84PI
'58.42L = '30.07T = '100.00R =
(LT)33°28'18"Δ =
737+52.22PI
'48.02L = '24.12T = '200.00R =
(LT)13°45'20"Δ =
744+67.76PI
'30.90L = '15.58T = '100.00R =
(LT)17°42'22"Δ =
748+17.49PI
'70.43L = '42.48T = '50.00R =
(LT)80°42'13"Δ =
750+20.60PI
'109.29L = '66.93T = '75.00R =
(LT)83°29'20"Δ =
753+26.37PI
C7
C75
0+
3+
C 7
1+
PC7
4+
:3 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
697+00 to 755+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.14
760+65 (MP 14.40)
36" CMP, 40 LNFT
Cleaning Culvert in Place
Culvert
24-Inch Pipe
Install 25 LNFT
14.45)
763+35 (MP
770+78 (MP 14.59)
18" CMP, 22 LNFT
Cleaning Culvert in Place
774+50 (MP 14.66)
10" CMP, 20 LNFT
Protect in Place
Install 20 LNFT 12-Inch Pipe Culvert
776+70 (MP 14.71)
Pipe Culvert
Install 25 LNFT 12-Inch
779+27 (MP 14.75)
Pipe Culvert
Install 20 LNFT 12-Inch
781+85 (MP 14.79)
12-Inch Pipe Culvert
Install 20 LNFT
785+47 (MP 14.87)
Pipe Culvert
Install 25 LNFT 18-Inch
787+83 (MP 14.92)
789+22 (MP 14.94)
16" CMP, 25 LNFT
Cleaning Culvert in Place
795+97 (MP 15.07)
54" CMP, 80 LNFT
Inlet Treatment Cobbles
12-Inch Pipe Culvert
Install 25 LNFT
781+25 (MP 14.79)
MP 15 (792+00)
Delineator, type flexible (typ.)
'73.99L =
'45.64T =
'50.00R =
(RT)84°46'57"Δ =
751+78.36PI
'41.17L = '21.83T = '50.00R =
(RT)47°10'50"Δ =
754+57.92PI
'221.69L = '123.79T = '200.00R =
(RT)63°30'37"Δ =
757+86.91PI
'188.92L = '109.31T = '150.00R =
(RT)72°09'50"Δ =
761+67.52PI
'83.18L = '42.20T = '200.00R =
(RT)23°49'47"Δ =
766+37.19PI
'60.67L = '30.57T = '200.00R =
(RT)17°22'47"Δ =
769+64.30PI
'232.33L = '122.34T = '300.00R =
(RT)44°22'17"Δ =
777+38.84PI
'52.35L = '26.24T = '300.00R =
(RT)09°59'53"Δ =
782+38.85PI
'86.69L = '44.04T = '200.00R =
(LT)24°50'03"Δ =
755+70.41PI
'54.08L = '46.96T = '25.00R =
(LT)123°56'24"Δ =
760+07.59PI
'44.19L = '22.18T = '200.00R =
(LT)12°39'33"Δ =
763+65.57PI
'62.27L = '31.39T = '200.00R =
(LT)17°50'21"Δ =
770+79.01PI
e = ___ '192.56L = '96.36T = '2,000.00R =
(LT)05°31'00"Δ =
773+60.48PI
'133.22L = '69.19T = '200.00R =
(LT)38°09'55"Δ =
780+39.07PI
2+
9+
760+14.71 PT
9+
T 7
8+
760+58.21 PC
C 77 8+
0 7
'29.27L = '14.66T = '200.00R =
(RT)08°23'07"Δ =
785+89.11PI
'161.95L = '85.71T = '200.00R =
(RT)46°23'44"Δ =
798+11.50PI
'185.88L = '93.06T = '1,500.00R =
(RT)07°06'01"Δ =
800+07.75PI
'96.83L = '48.57T = '500.00R =
(RT)11°05'45"Δ =
803+05.93PI
'232.89L = '125.67T = '250.00R =
(RT)53°22'28"Δ =
806+07.98PI
'67.05L = '33.67T = '300.00R =
(LT)12°48'20"Δ =
784+46.23PI
'77.01L = '38.56T = '600.00R =
(LT)07°21'13"Δ =
787+27.96PI
'160.72L = '80.72T = '700.00R =
(LT)13°09'20"Δ =
789+78.90PI
'203.13L = '101.65T = '2,000.00R =
(LT)05°49'09"Δ =
792+09.33PI
'112.36L = '58.96T = '150.00R =
(LT)42°55'09"Δ =
795+51.99PI
'370.09L = '212.73T = '300.00R =
(LT)70°40'55"Δ =
809+51.63PI
'252.79L = '127.79T = '700.00R =
(LT)20°41'29"Δ =
812+88.75PI
6+
7+
.90
7+
T 8
7+
.20
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
:4 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
755+00 to 813+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.15
851+40 to 852+48 Apprx.
Second River Crossing
MP 16 (844+80)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
0 8
'56.31L =
'31.57T =
'50.00R =
(RT)64°31'50"Δ =
821+35.65PI
'172.77L = '97.40T = '150.00R =
(RT)65°59'32"Δ =
827+96.46PI
'138.50L = '72.16T = '200.00R =
(RT)39°40'38"Δ =
836+35.45PI
'109.07L = '54.87T = '400.00R =
(RT)15°37'22"Δ =
838+52.79PI
'50.21L = '25.24T = '200.00R =
(RT)14°23'06"Δ =
840+36.00PI
'77.09L = '38.66T = '400.00R =
(RT)11°02'32"Δ =
841+94.74PI
'255.76L = '130.74T = '500.00R =
(LT)29°18'28"Δ =
818+81.88PI
'298.62L = '156.65T = '400.00R =
(LT)42°46'26"Δ =
824+34.39PI
'266.42L = '157.17T = '200.00R =
(LT)76°19'26"Δ =
833+28.49PI
0+
1+
1+
8+
T 8
2+
'151.36L = '82.83T = '150.00R =
(RT)57°48'53"Δ =
850+82.96PI '29.26L =
'14.73T = '100.00R =
(RT)16°45'50"Δ =
853+98.42PI
'156.44L = '80.87T = '250.00R =
(RT)35°51'10"Δ =
857+57.64PI
'477.91L = '277.58T = '375.00R =
(RT)73°01'08"Δ =
864+74.12PI
'102.81L = '98.51T = '45.00R =
(LT)130°53'44"Δ =
847+57.12PI '103.87L =
'52.69T = '250.00R =
(LT)23°48'16"Δ =
852+91.67PI
'69.02L = '35.13T = '150.00R =
(LT)26°21'45"Δ =
855+21.47PI
'51.83L = '26.06T = '200.00R =
(LT)14°50'58"Δ =
859+84.62PI
+58.6
PC 84
7+
+33.1
PT
0+
6+
:3 e b ru a ry
B L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
813+00 to 872+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.16
891+20 to 891+70 Apprx.
Third River Crossing
N
MP 17 (897+60)
Delineator, type flexible (typ.)
24-Inch Pipe Culvert
Install 25 LNFT
920+09 (MP 17.42)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
0 8
'380.01L =
'190.15T =
'4,000.00R =
(RT)05°26'35"Δ =
875+26.89PI
'154.17L = '78.83T = '300.00R =
(RT)29°26'36"Δ =
882+82.13PI
'224.76L = '117.95T = '300.00R =
(RT)42°55'37"Δ =
888+48.07PI
'161.57L = '85.49T = '200.00R =
(LT)46°17'14"Δ =
880+26.03PI
'150.24L = '78.87T = '200.00R =
(LT)43°02'30"Δ =
886+15.10PI
'145.08L = '73.05T = '500.00R =
(LT)16°37'29"Δ =
894+56.85PI
'114.14L = '57.46T = '400.00R =
(LT)16°21'00"Δ =
899+82.42PI
C 8
5 91
0 9
'144.17L = '72.34T = '700.00R =
(RT)11°48'02"Δ =
902+59.47PI
'240.82L = '162.64T = '140.00R =
(RT)98°33'26"Δ =
912+66.03PI
'177.97L = '90.48T = '400.00R =
(RT)25°29'31"Δ =
918+75.27PI
'88.36L = '47.30T = '100.00R =
(RT)50°37'31"Δ =
921+27.90PI
'76.91L = '38.94T = '200.00R =
(RT)22°02'00"Δ =
924+45.90PI
'63.18L = '31.71T = '300.00R =
(RT)12°04'00"Δ =
927+32.34PI
'303.72L = '155.19T = '600.00R =
(LT)29°00'11"Δ =
905+67.35PI
'150.58L = '79.06T = '200.00R =
(LT)43°08'21"Δ =
909+19.66PI
'182.08L = '91.10T = '2,000.00R =
(LT)05°12'58"Δ =
915+36.48PI
'60.03L = '34.23T = '50.00R =
(LT)68°47'41"Δ =
920+13.54PI
'29.45L = '14.83T = '100.00R =
(LT)16°52'31"Δ =
925+59.71PI
9+
.18
PT
9+
5+
5+
1+
.39
9+
4+
7+
7+
:3 e b ru a ry
B L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
872+00 to 928+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.17
MP 18 (950+40)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/1776321
5 9
'161.65L =
'81.00T =
'1,000.00R =
(RT)09°15'43"Δ =
936+30.84PI
'71.45L = '43.37T = '50.00R =
(RT)81°52'26"Δ =
940+23.39PI
e = ___ '85.24L = '45.40T = '100.00R =
(RT)48°50'10"Δ =
946+31.89PI
'129.48L = '65.49T = '350.00R =
(RT)21°11'47"Δ =
954+79.25PI
'140.51L = '73.29T = '200.00R =
(RT)40°15'08"Δ =
957+25.74PI
'112.82L = '57.96T = '200.00R =
(LT)32°19'14"Δ =
930+86.05PI
'183.17L = '93.22T = '400.00R =
(LT)26°14'14"Δ =
932+72.16PI
'117.32L = '66.47T = '100.00R =
(LT)67°13'13"Δ =
939+00.87PI
'73.67L = '37.60T = '150.00R =
(LT)28°08'27"Δ =
941+83.12PI
'150.97L = '75.89T = '600.00R =
(LT)14°25'00"Δ =
943+74.77PI
'222.91L = '111.92T = '1,000.00R =
(LT)12°46'18"Δ =
948+86.16PI
'197.27L = '100.69T = '400.00R =
(LT)28°15'26"Δ =
952+59.72PI
0+
T 9
+51.
PT
7+
+80.
7+
'50.89L = '26.01T = '100.00R =
(RT)29°09'25"Δ =
960+08.27PI
'42.34L = '21.25T = '200.00R =
(RT)12°07'47"Δ =
962+34.66PI
'94.34L = '48.07T = '200.00R =
(RT)27°01'40"Δ =
964+60.81PI
'60.41L = '31.16T = '100.00R =
(RT)34°36'43"Δ =
967+08.84PI
'42.77L = '21.72T = '100.00R =
(RT)24°30'18"Δ =
970+17.54PI
'69.87L = '36.43T = '100.00R =
(RT)40°01'51"Δ =
975+07.86PI
'114.85L = '60.40T = '150.00R =
(RT)43°52'05"Δ =
978+75.31PI
'166.72L = '85.58T = '300.00R =
(RT)31°50'31"Δ =
984+44.69PI
'52.60L = '26.92T = '100.00R =
(LT)30°08'17"Δ =
958+68.34PI
'40.45L = '20.51T = '100.00R =
(LT)23°10'43"Δ =
961+03.96PI
'65.62L = '33.11T = '200.00R =
(LT)18°47'56"Δ =
963+39.72PI
'171.30L = '91.30T = '200.00R =
(LT)49°04'22"Δ =
968+83.99PI
'103.65L = '53.31T = '180.00R =
(LT)32°59'40"Δ =
971+21.83PI
'66.64L = '34.61T = '100.00R =
(LT)38°11'05"Δ =
973+76.10PI
'90.48L = '47.33T = '125.00R =
(LT)41°28'26"Δ =
976+11.00PI
'137.38L = '77.33T = '120.00R =
(LT)65°35'37"Δ =
982+45.81PI
7+
4+
6+
3+
.86
7+
4+
8+
3+
.11
:5 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
928+00 to 988+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.18
1043+97 (MP 19.77)
12" CMP, 20 LNFT
Cleaning Culvert in Place
MP 19 (1003+20)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
990+24 (MP 18.75)
Swan Pit
'235.27L =
'119.17T =
'600.00R =
(RT)22°28'00"Δ =
991+07.95PI
'57.60L = '29.00T = '200.00R =
(RT)16°30'06"Δ =
997+89.10PI
'93.27L = '47.50T = '200.00R =
(RT)26°43'16"Δ =
1001+13.40PI
'137.50L = '69.98T = '300.00R =
(RT)26°15'36"Δ =
1006+49.82PI
'113.16L = '56.82T = '500.00R =
(RT)12°58'02"Δ =
1009+54.20PI
'98.25L = '49.37T = '400.00R =
(RT)14°04'25"Δ =
1013+71.70PI
'78.17L = '39.14T = '600.00R =
(RT)07°27'53"Δ =
1015+85.12PI
'115.07L = '57.71T = '600.00R =
(RT)10°59'17"Δ =
1017+27.57PI
'127.23L = '63.63T = '2,000.00R =
(LT)03°38'41"Δ =
987+80.83PI
'199.04L = '103.34T = '300.00R =
(LT)38°00'49"Δ =
995+18.71PI
'61.18L = '31.02T = '150.00R =
(LT)23°22'12"Δ =
999+28.36PI
'62.58L = '31.55T = '200.00R =
(LT)17°55'45"Δ =
1002+99.81PI
'82.93L = '41.56T = '500.00R =
(LT)09°30'10"Δ =
1011+89.44PI
'115.07L = '57.71T = '600.00R =
(RT)10°59'17"Δ =
1017+27.57PI
'105.30L = '54.93T = '150.00R =
(RT)40°13'20"Δ =
1024+42.19PI
'224.98L = '114.09T = '550.00R =
(RT)23°26'15"Δ =
1028+10.07PI
'54.06L = '27.32T = '150.00R =
(RT)20°38'51"Δ =
1037+45.54PI
'66.77L = '33.70T = '200.00R =
(RT)19°07'46"Δ =
1039+04.32PI
'42.84L = '21.75T = '100.00R =
(RT)24°32'34"Δ =
1040+62.92PI
'100.58L = '52.26T = '150.00R =
(RT)38°25'03"Δ =
1042+41.82PI
'102.69L = '52.50T = '200.00R =
(LT)29°25'05"Δ =
1018+76.17PI
'62.33L = '31.62T = '150.00R =
(LT)23°48'34"Δ =
1022+59.57PI
'70.05L = '36.53T = '100.00R =
(LT)40°08'07"Δ =
1026+16.11PI
'226.43L = '113.89T = '850.00R =
(LT)15°15'45"Δ =
1031+36.07PI
'27.42L = '14.07T = '50.00R =
(LT)31°25'26"Δ =
1038+28.46PI
'48.00L = '24.47T = '100.00R =
(LT)27°29'58"Δ =
1041+46.71PI
'73.88L = '40.25T = '75.00R =
(LT)56°26'20"Δ =
1044+00.84PI
:5 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
988+00 to 1045+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.19
1046+31 (MP 19.81)
24" CMP, 26 LNFT
Protect in Place
1050+05 (MP 19.88)
24" CMP 24 LNFT
Place
Cleaning Culvert in
1052+90 (MP 19.94)
24" CMP, 20 LNFT
Cleaning Culvert in Place
1056+65 (20.01)
24" CMP, 20 LNFT
in Place
Cleaning Culvert
MP 20 (1056+00)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
0 1
'19.52L =
'9.89T =
'50.00R =
(RT)22°22'07"Δ =
1045+44.49PI
'47.57L = '23.90T = '200.00R =
(RT)13°37'40"Δ =
1046+66.39PI
'213.97L = '107.17T = '1,500.00R =
(RT)08°10'24"Δ =
1050+33.81PI
'64.54L = '32.45T = '250.00R =
(RT)14°47'30"Δ =
1055+81.41PI
'49.90L = '25.04T = '250.00R =
(RT)11°26'14"Δ =
1057+23.29PI
'152.74L = '78.84T = '250.00R =
(RT)35°00'18"Δ =
1060+10.97PI
'112.96L = '57.16T = '300.00R =
(RT)21°34'26"Δ =
1065+52.84PI
'74.31L = '37.35T = '300.00R =
(RT)14°11'34"Δ =
1067+93.64PI
'26.67L = '13.48T = '75.00R =
(LT)20°22'19"Δ =
1046+06.85PI
'153.29L = '78.36T = '300.00R =
(LT)29°16'36"Δ =
1054+68.68PI
'88.77L = '45.31T = '180.00R =
(LT)28°15'27"Δ =
1061+86.87PI
'273.35L = '146.99T = '300.00R =
(LT)52°12'19"Δ =
1070+24.26PI 1
C1
0 1
5 1
'160.33L = '80.65T = '600.00R =
(RT)15°18'38"Δ =
1078+02.10PI
'687.68L = '374.45T = '700.00R =
(RT)56°17'14"Δ =
1092+33.94PI
'282.78L = '141.63T = '2,000.00R =
(RT)08°06'04"Δ =
1101+95.79PI
'253.16L = '134.67T = '300.00R =
(LT)48°21'03"Δ =
1081+51.17PI
'25.02L = '12.53T = '200.00R =
(LT)07°10'02"Δ =
1086+19.47PI
'107.74L = '53.89T = '1,500.00R =
(LT)04°06'56"Δ =
1098+31.77PI
:5 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
1045+00 to 1103+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.20
1122+34 (MP 21.25)
24" CMP, 24 LNFT
Protect in Place
(See Sheet C.3 for detail)
1138+75 (MP 21.57)
& Realignment
Begin Grade Raise
Existing Ditch Issue
Install 24 LNFT 36-Inch Pipe Culvert
1136+52, (MP 21.52)
Install 34 LNFT 24-Inch Pipe Culvert
1139+27 (MP 21.57) 1143+60 (MP 21.65)
24" CMP, 24 LNFT
Cleaning Culvert in Place
1148+05 (MP 21.74)
12" CMP, 24 LNFT
Cleaning Culvert in Place
N
(See Sheet C.3 for detail)
1141+25 (MP 21.60)
& Realignment
End Grade Raise
MP 21 (1108+80)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
'127.24L =
'63.76T =
'800.00R =
(RT)09°06'47"Δ =
1111+84.51PI
'89.89L = '45.72T = '200.00R =
(LT)25°45'09"Δ =
1106+63.40PI
'182.54L = '91.33T = '2,000.00R =
(LT)05°13'46"Δ =
1120+53.48PI
'305.51L = '153.95T = '1,000.00R =
(LT)17°30'16"Δ =
1127+85.01PI
'48.99L = '25.00T = '100.00R =
(RT)28°04'02"Δ =
1136+52.54PI
'188.06L = '94.10T = '2,000.00R =
(RT)05°23'16"Δ =
1139+83.22PI
'68.89L = '35.06T = '150.00R =
(RT)26°18'51"Δ =
1144+57.53PI
'34.43L = '17.93T = '50.00R =
(RT)39°27'00"Δ =
1148+00.25PI
'91.43L = '46.53T = '200.00R =
(RT)26°11'31"Δ =
1159+20.81PI
'106.03L = '53.82T = '250.00R =
(LT)24°18'01"Δ =
1135+67.97PI
'88.16L = '44.81T = '200.00R =
(LT)25°15'20"Δ =
1142+82.19PI
'90.67L = '46.13T = '200.00R =
(LT)25°58'28"Δ =
1146+31.72PI
'66.19L = '33.40T = '200.00R =
(LT)18°57'40"Δ =
1149+06.61PI
:1
J a n u a ry
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
1103+00 to 1160+00
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.21
End Project
E = 1374892.0689
N = 1598517.3393
MP 22 (1161+60)
Delineator, type flexible (typ.)
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
'62.84L =
'33.40T =
'75.00R =
(RT)48°00'26"Δ =
1162+21.17PI
'61.02L = '30.75T = '200.00R =
(RT)17°28'54"Δ =
1164+90.39PI
'153.96L = '81.02T = '200.00R =
(RT)44°06'19"Δ =
1179+42.95PI
'66.35L = '34.45T = '100.00R =
(LT)38°01'02"Δ =
1161+42.53PI
'70.82L = '36.97T = '100.00R =
(LT)40°34'33"Δ =
1163+27.75PI
'283.34L = '147.90T = '400.00R =
(LT)40°35'06"Δ =
1167+71.75PI
'166.26L = '85.33T = '300.00R =
(LT)31°45'13"Δ =
1174+72.88PI
'144.13L = '78.17T = '150.00R =
(LT)55°03'11"Δ =
1177+42.20PI
+08
+90 .78
1178+08.16 PT
+65
+50 .61
1178+61.93 PC
.4
PO
E
:5 e c e m b e r
B
L
P la n
S h e p w
-w o rk \d
\A
K -P
R A
-K A
T M
(4
P la n -P la n
.d g n
1160+00 to 1181+52
PLAN SHEET
STATE PROJECT
NUMBER
AK NPS KATM 10(4) D.22
4.
3.
2.
1.
Do not disturb existing NPS Stockpiles.
Stockpiled Aggregate (NPS stockpile 2 at Historic Pit, MP 18.8) = 1,500 CUYD.
Stockpiled Aggregate (NPS stockpile 1) = 8,500 CUYD.
Excavate and crush material in Area II and do not disturb Area I.
NOTE:
E= 1316014.15
N= 1651649.91
E= 1315745.61
N= 1651836.98
E= 1315688.53
N= 1651894.57
E= 1315561.95
N= 1651891.36
E= 1315616.27
N= 1651866.88
E= 1315394.36
N= 1651885.21
E= 1315336.62
N= 1651809.80
E= 1315378.32
N= 1651768.72
E= 1315435.20
N= 1651712.66
E= 1315464.32
N= 1651684.18 E= 1315530.84
N= 1651629.88
E= 1315622.75
N= 1651610.43 construction limits disturbance/
Estimated
VALLEY OF 10,000 SMOKES ROAD
contours
Existing
SCALE: 1" = 100'
AREA II
AREA I
E= 1315857.46
N= 1651770.30
E= 1315423.94
N= 1651565.68
Existing NPS stockpiles aggregate (NPS Stockpile 1)
Proposed 8,500 CUYDS stockpiled stockpiles
Existing NPS and Disturbance
Access between Stockpile
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
Access road to Area II
:0 e c e m b e r
P la n
S h e p w
-w o rk \d
\A
K
N P
S
K A
T M
(4
M
P u p d a te d .d g n
SITE PLAN
MORAINE PIT
STATE PROJECT
NUMBER
AK NPS KATM 10(4) E.1
Backfilled waste material
Excavated slope (1.5:1)
Existing Ground depressions that will pond water.
Contour area to match existing conditions and to be free of
Backfill with overburden and crusher rejects.
Slope to drain
Replace conserved topsoil
Maximum 1:2 finished slopes
2.
1.
NOTE:
TYPICAL CROSS SECTION
NO SCALE
RECLAMATION PLAN
MORAINE PIT
E.2
STATE PROJECT
NUMBER
SHEET
M
O R
A
IN
E P
IT
R
E C
P
L p w
-w o rk \d
\A
K N
P S
K A
T M
(4
E a
U s e i t fo r E
.2 d g n
AK NPS KATM 10(4)
:1 e c e m b e r
C h e c k e d b y
D e s ig n e d b y
Excavated slope (1.5:1)
Slope to drain
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631 lo w in g D ra in a g e
D it c h
D it c h
D it c h
D it c h ditchs intersecting the culverts.
Ensure rolls extend across any
Place fiber rolls around culvert outlet and inlet.
FOOTNOTE:
[1]
Culvert
[1]fiber rolls control, Soil erosion control, fiber rolls
Soil erosion [1]
Flowing Drainage
PLACEMENT AROUND CULVERT
TYPICAL FIBER ROLL
:1 e c e m b e r
CONTROL QUANTITIES
TABULATION OF EROSION
STATE PROJECT
NUMBER
SHEET
AK NPS KATM 10(4) F.1
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631 detail on sheet F.6
Install fiber rolls per detail on sheet F.6
Install fiber rolls per detail on sheet F.6
Install fiber rolls per detail on sheet F.6
Install fiber rolls per
NN
Fiber Rolls
'105.70L =
'53.16T =
'400.00R =
(RT)15°08'24"Δ =
286+21.67PI
'260.62L = '131.84T = '700.00R =
(LT)21°19'56"Δ =
278+81.80PI
'81.03L = '41.08T = '200.00R =
(RT)23°12'49"Δ =
670+33.75PI
'203.28L = '103.06T = '500.00R =
(RT)23°17'37"Δ =
672+12.88PI
'48.99L = '25.00T = '100.00R =
(RT)28°04'02"Δ =
1136+52.54PI
'188.06L = '94.10T = '2,000.00R =
(RT)05°23'16"Δ =
1139+83.22PI
'68.89L = '35.06T = '150.00R =
(RT)26°18'51"Δ =
1144+57.53PI
'106.03L = '53.82T = '250.00R =
(LT)24°18'01"Δ =
1135+67.97PI
'88.16L = '44.81T = '200.00R =
(LT)25°15'20"Δ =
1142+82.19PI
T1
5 2
'206.27L = '103.20T = '2,500.00R =
(RT)04°43'39"Δ =
208+30.60PI
'214.76L = '107.45T = '2,500.00R =
(RT)04°55'19"Δ =
219+89.18PI
'881.12L = '447.83T = '2,000.00R =
(RT)25°14'33"Δ =
230+40.35PI
'268.78L = '134.75T = '1,500.00R =
(LT)10°16'00"Δ =
215+83.86PI
:2 e c e m b e r
210+00 to 1144+00
EROSION CONTROL
STATE PROJECT
NUMBER
SHEET
AK NPS KATM 10(4) F.2
NPS PMIS NO. 218578 NPS Drwg, No. KATM/127/177631
LEGEND
E= 1316014.15
N= 1651649.91
E= 1315745.61
N= 1651836.98
E= 1315688.53
N= 1651894.57
E= 1315561.95
N= 1651891.36
E= 1315616.27
N= 1651866.88
E= 1315394.36
N= 1651885.21
E= 1315336.62
N= 1651809.80
E= 1315378.32
N= 1651768.72
E= 1315435.20
N= 1651712.66
E= 1315464.32
N= 1651684.18 E= 1315530.84
N= 1651629.88
E= 1315622.75
N= 1651610.43 construction limits disturbance/
Estimated
VALLEY OF 10,000 SMOKES ROAD
AREA II
AREA I
E= 1315857.46
N= 1651770.30
E= 1315423.94
N= 1651565.68
Existing NPS stockpiles aggregate (NPS Stockpile 1)
Proposed 8,500 CUYDS stockpiled stockpiles
Existing NPS and Disturbance
Access between Stockpile
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
Acces road to Area II
Moraine Pit
Entrance to
Moraine Pit
Exit from per detail on sheet F.4
Install silt fence
Existing contours
Scale: 1"=100' facilities
Portable sanitary
:3 e c e m b e r
P la n
S h e p w
-w o rk \d
\A
K
N P
S
K A
T M
(4 fc .d g n
EROSION CONTROL PLAN
MORAINE PIT
STATE PROJECT
NUMBER
AK NPS KATM 10(4) F.3
LEGEND
Silt Fence
AK NPS KATM 10(4) F.4
NPS PMIS No. 218578 NPS Drwg. No.
KATM/127/177631
AK NPS KATM 10(4) F.5
KATM/127/177631
AK NPS KATM 10(4) F.6
KATM127/177631
10.4 x 16 25101 -0000
30202 -2000
60201 -0400
60201 -0600
60201 -0800
60201 -1000
60704 -0000
Station S T R U
C T U
R A L
E X C A V A T
IO
(F
R I
N
FO
R M
A T
IO
N O
N
LY
PL
A C E D
R
IP
R A P, M E T H
O
(C
LA
S S
R O
A D
W A Y A
G G
R E G
A T E
M E T H
O D
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
D E S
IG
N E R N
O T E S
CUYD CUYD TON LNFT LNFT LNFT LNFT EACH
216+48 1 MP 4.10
428+50 1 MP 8.11
672+75 13 25 25 MP 12.74
705+75 1 MP 13.36
707+05 11 22 22 MP 13.39
713+05 MP 13.50 (PROTECT IN PLACE)
714+67 1 MP 13.53
716+51 11 22 22 MP 13.57
721+88 18 36 26 MP 13.67
724+66 MP 13.72
730+17 1 MP 13.82
740+92 1 MP 14.03
749+13 6 12 20 MP 14.18
751+70 1 MP 14.23
760+65 1 MP 14.40
763+35 13 25 25 MP 14.45
770+78 1 MP 14.59
774+50 MP 14.66 (PROTECT IN PLACE)
776+70 6 12 20 MP 14.71
779+27 8 16 25 MP 14.75
781+25 6 25 MP 14.79
781+85 6 12 20 MP 14.80
785+47 6 12 20 MP 14.87
787+83 16 32 25 MP 14.92
789+22 1 MP 14.94
795+97 7 MP 15.07
920+09 13 25 25 MP 17.42
1043+97 1 MP 19.77
1046+31 MP 19.81 (PROTECT IN PLACE)
1050+05 1 MP 19.88
1052+90 1 MP 19.94
1056+65 1 MP 20.01
1136+52 17 33 24 MP 21.52
CUMULATIVE TOTAL 150 7 284 130 47 97 50 14
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w -w or k\ d
A K N
PS
K
A T M
(4
D ra in ag e.
xl sx
]S h ee t -F eb -2
:3
K ar ki 7/
D
C he ck er
7/
D es ig n ed h ec ke d
STATE PROJECT
G.1
SHEET
NUMBER
NPS KATM 10(4)AK
NPS PMIS No. 218578 NPS Drwg. No.
KATM/127/177631
Note: The quantities shown hereon are approximate and are subject to field adjustments.
10.4 x 16 25101 -0000
30202 -2000
60201 -0400
60201 -0600
60201 -0800
60201 -1000
60704 -0000
Station
S T R U
C T U
R A L
E X C A V A T
IO
(F
R I
N
FO
R M
A T
IO
N O
N
LY
PL
A C E D
R
IP
R A P, M E T H
O
(C
LA
S S
R O
A D
W A Y A
G G
R E G
A T E
M E T H
O D
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
-I
N C H
P
IP
E C
U
LV
E R T
C
LE
A N
IN
G
C U
LV
E R T I
N P
LA
C E
D E S
IG
N E R N
O T E S
CUYD CUYD TON LNFT LNFT LNFT LNFT EACH
PREVIOUS 150 7 284 130 47 97 50 14
1139+27 12 24 34 MP 21.57
1143+60 1 MP 21.65
1148+05 1 MP 21.74
PROJECT TOTAL 162 7 308 130 47 131 50 16
NOTE:
1. Steel pipe culvert minimum wall thickness is the larger of ____" or the thickness required by the Std. 602-1 fill height table.
2. Aluminized steel pipe culvert minimum wall thickness is the larger of ____" or the thickness required by the Std. 602-1 fill height table (steel).
3. Aluminum pipe culvert minimum wall thickness is the larger of ____" or the thickness required by the Std. 602-1 fill height table.
z
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d
A K N
PS
K
A T M
(4
D ra in ag e.
xl sx
]S h ee t (2
-F eb -2
:3 P
M N
K ar ki 7/
D
C he ck er
7/
D es ig n ed b y:
C h ec ke d b y:
STATE PROJECT
G.2
SHEET
NUMBER
NPS KATM 10(4)AK
NPS PMIS No. 218578 NPS Drwg. No.
KATM/127/177631
Note: The quantities shown hereon are approximate and are subject to field adjustments.
AK NPS KATM 10(4) G.3
PMIS No. 218578 NPS Drwg. No.
KATM/127/177631
AK NPS KATM 10(4) G.4
KATM/127/177631
AK NPS KATM 10(4) G.5
KATM/127/177631
CONTROL QUANTITIES
TEMPORARY TRAFFIC
TABULATION OF
[1]
FOOTNOTE:
Mount on Type III Barricade as needed.
H.1
STATE PROJECT
NUMBER
SHEET
AK NPS KATM 10(4)
:4
J u ly
/2
C h e c k e d b y
D e s ig n e d b y
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631
AK NPS KATM 10(4) H.2
KATM/127/177631
AK NPS KATM 10(4) H.3
KATM/127/177631
AK NPS KATM 10(4) H.4
KATM/127/177631
AK NPS KATM 10(4) H.5
KATM/127/177631
AK NPS KATM 10(4) H.6
KATM/127/177631
DELINEATOR DETAILS
MILE MARKER
I.1
STATE PROJECT
NUMBER
SHEET
D e li n e a to r D e p w
-w o rk \d
\A
K
N P
S
K A
T M
(4
Ia .d g n
AK NPS KATM 10(4)
:5
A u g u s t
C h e c k e d b y
D e s ig n e d b y
NPS PMIS No. 218578 NPS Drwg. No. KATM/127/177631 steel perforated tube anchor
24" x 2" 12 Gauge
Delineator post
DELINEATOR
MILE
Flange bolt and lock nut
"2
Clevis pin and hairpin cotterFinished grade
Edge of shoulder
NOTE:
Install delineator on right side of the road.
Install mile marker signs on front and back of delineator.
for approval.
Submit delineator, anchor and mile marker details
Use brown delineator posts.
4.
3.
2.
1.
NO SCALE
Approx. 1"
8'-0" (max.)
2'-0" (min.)Traveled way
| AK NPS KATM 10(4)_95_Drainage.pdf |
| Sheet |
| Sheet (2) |