PROJECT DESCRIPTION_AK FWS KNA 74525(1).pdf
PDF 121 KB Posted
- Attached to
- AK FWS KNA 74525(1), Swan Lake Road Project
- Solicitation number
- 69056723B000020
About this file
This project description outlines construction work for the AK FWS KNA 74525(1) Swan Lake Road Project in Kenai Peninsula Borough, Alaska. The work includes installing three aquatic organism passage culverts along with streambed reconstruction, additional smaller culverts, excavation, roadway embankment raising, and new roadway aggregate resurfacing along 0.42 miles of road. Other work comprises clearing and grubbing, removal of existing pipe culverts, roadway and ditch excavation, slope reinforcement with riprap and retaining walls, aggregate base courses, new pipe culverts from 24 to 108 inches, a structural plate pipe-arch culvert, placing conserved topsoil and turf establishment, temporary traffic control, and residential housing and vehicles for construction staff. The estimated price range is $2-3 million and the tentative completion date is summer 2024. The related pre-solicitation is identified as solicitation number 69056723B000020 through the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_09-25-2023.pdf | ||
| Swan Lake Road Prelim Letter 2023.08.20.pdf | ||
| Swan Lake Road Preliminary Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AK FWS KNA 74525(1), Swan Lake Road Project
Kenai Peninsula Borough, Alaska
This project will construct three Aquatic Organism Passage (AOP) culverts
(including streambed channel reconstruction), additional smaller culverts, excavation, embankment to raise roadway grade, and place new roadway aggregate resurfacing.
Project length: 0.42 miles
Tentative Fixed Completion Date: Summer 2024
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $2 million to $3 million
Location: 13 miles N of Sterling, AK
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O n e S ch ed u le
S ch
N am e
DIVISION 150 – Project Requirements
152 Construction Survey & Staking Yes
153 Contractor Quality Control and Assurance Yes
154 Contractor Sampling & Testing Yes
155 Schedules for Construction Contracts (construction schedules) Yes
157 Soil Erosion Control, Temporary Stream Diversion LPSM
157 Soil Erosion Control, Temporary Soil Tackifier 1.1 ACRE
157 Soil Erosion Control, Silt Fence 550 LNFT
157 Soil Erosion Control, Fiber Roll 2,330 LNFT
157 Soil Erosion Control, Fiber Roll (At Inlet/Outlet) 220 LNFT
157 Soil Erosion Control, Check Dam (Fiber Roll) 16 EA
158 Watering for Dust Control LPSM
DIVISION 200 – Earthwork
201 Clearing & Grubbing 1.1 ACRE
203 Removal of Pipe Culvert 3 EACH
204 Roadway Excavation 1,320 CUYD
204 Unclassified Borrow 1,600 CUYD
204 Ditch, Excavation 30 LNFT
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap, Method A, Class 2 (Headwall) 15 CUYD
O n e S ch ed u le
S ch
N am e
251 Riprap, Method B, Class 3 (Headwall) 200 CUYD
DIVISION 300 – Aggregate and Base Courses
302 Roadway Aggregate, Method 2 2,430 TON
DIVISION 600 – Incidental Construction
602 24-inch Pipe Culvert 52 LNFT
602 36-inch Pipe Culvert 74 LNFT
602 108-inch Pipe Culvert (AOP) 217 LNFT
603 Structural Plate Pipe-Arch Culvert (19.5 ft Span x 12.5 ft Rise AOP) 76 LNFT
622 Rental Equipment Yes
623 General Labor Yes
624 Placing Conserved Topsoil, 4-inch Depth 0.7 ACRE
625 Turf Establishment 0.7 ACRE
627 Sod 250 SQYD
635 Temporary Traffic Control – Barricade, Type 3 8 EA
635 Temporary Traffic Control – Tubular Marker, Type 42-inch 45 EA
635 Temporary Traffic Control – Concrete Barrier 180 LNFT
635 Temporary Traffic Control –Construction Sign 380 SQFT
635 Temporary Traffic Control – Flagger 500 HOURS
635 Temporary Traffic Control – Traffic Control Supervisor 70 DAYS
637 Residential Housing 2 EA
637 Vehicle 2 EA
647 Mitigation, Streambed Material (Simulated Stream Culvert Treatment) 660 CUYD
647 Mitigation, Streambed Channel Reconstruction (Channel Grading) 50 CUYD
650 Construct and Maintain Diversion (Traffic) LPSM
File details come from the government source that posted it. Updated .