This project description outlines construction work for the AK FWS KNA 74525(1) Swan Lake Road Project in Kenai Peninsula Borough, Alaska. The work includes installing three aquatic organism passage culverts along with streambed reconstruction, additional smaller culverts, excavation, roadway embankment raising, and new roadway aggregate resurfacing along 0.42 miles of road. Other work comprises clearing and grubbing, removal of existing pipe culverts, roadway and ditch excavation, slope reinforcement with riprap and retaining walls, aggregate base courses, new pipe culverts from 24 to 108 inches, a structural plate pipe-arch culvert, placing conserved topsoil and turf establishment, temporary traffic control, and residential housing and vehicles for construction staff. The estimated price range is $2-3 million and the tentative completion date is summer 2024. The related pre-solicitation is identified as solicitation number 69056723B000020 through the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
QA_09-25-2023.pdf PDF
Swan Lake Road Prelim Letter 2023.08.20.pdf PDF
Swan Lake Road Preliminary Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK FWS KNA 74525(1), Swan Lake Road Project

Kenai Peninsula Borough, Alaska

This project will construct three Aquatic Organism Passage (AOP) culverts

(including streambed channel reconstruction), additional smaller culverts, excavation, embankment to raise roadway grade, and place new roadway aggregate resurfacing.

Project length: 0.42 miles

Tentative Fixed Completion Date: Summer 2024

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $3 million

Location: 13 miles N of Sterling, AK

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O n e S ch ed u le

S ch

N am e

DIVISION 150 – Project Requirements

152 Construction Survey & Staking Yes

153 Contractor Quality Control and Assurance Yes

154 Contractor Sampling & Testing Yes

155 Schedules for Construction Contracts (construction schedules) Yes

157 Soil Erosion Control, Temporary Stream Diversion LPSM

157 Soil Erosion Control, Temporary Soil Tackifier 1.1 ACRE

157 Soil Erosion Control, Silt Fence 550 LNFT

157 Soil Erosion Control, Fiber Roll 2,330 LNFT

157 Soil Erosion Control, Fiber Roll (At Inlet/Outlet) 220 LNFT

157 Soil Erosion Control, Check Dam (Fiber Roll) 16 EA

158 Watering for Dust Control LPSM

DIVISION 200 – Earthwork

201 Clearing & Grubbing 1.1 ACRE

203 Removal of Pipe Culvert 3 EACH

204 Roadway Excavation 1,320 CUYD

204 Unclassified Borrow 1,600 CUYD

204 Ditch, Excavation 30 LNFT

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap, Method A, Class 2 (Headwall) 15 CUYD

O n e S ch ed u le

S ch

N am e

251 Riprap, Method B, Class 3 (Headwall) 200 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate, Method 2 2,430 TON

DIVISION 600 – Incidental Construction

602 24-inch Pipe Culvert 52 LNFT

602 36-inch Pipe Culvert 74 LNFT

602 108-inch Pipe Culvert (AOP) 217 LNFT

603 Structural Plate Pipe-Arch Culvert (19.5 ft Span x 12.5 ft Rise AOP) 76 LNFT

622 Rental Equipment Yes

623 General Labor Yes

624 Placing Conserved Topsoil, 4-inch Depth 0.7 ACRE

625 Turf Establishment 0.7 ACRE

627 Sod 250 SQYD

635 Temporary Traffic Control – Barricade, Type 3 8 EA

635 Temporary Traffic Control – Tubular Marker, Type 42-inch 45 EA

635 Temporary Traffic Control – Concrete Barrier 180 LNFT

635 Temporary Traffic Control –Construction Sign 380 SQFT

635 Temporary Traffic Control – Flagger 500 HOURS

635 Temporary Traffic Control – Traffic Control Supervisor 70 DAYS

637 Residential Housing 2 EA

637 Vehicle 2 EA

647 Mitigation, Streambed Material (Simulated Stream Culvert Treatment) 660 CUYD

647 Mitigation, Streambed Channel Reconstruction (Channel Grading) 50 CUYD

650 Construct and Maintain Diversion (Traffic) LPSM