The document is a construction contract for the Iowa Department of Natural Resources (IDNR) for the Hogsback WMA Wetland Restoration project located in Winnebago County, Iowa. The project involves constructing two dikes, conducting shallow water excavation, installing tiles, and performing drainage improvements in Section 9 of Township 100N, Range 23W. Key components include 1,150 cubic yards of on-site borrow excavation, 1,500 feet of tile investigation, 3,300 cubic yards of shallow water and principle spillway excavation, 5 tile breaks, 10 feet of 10" CMP with rodent guard, 1,940 feet of 8" non-perforated dual wall tile, 100 feet of straw wattles, and 25 tons of clean stone.

The project, identified as Project #25-02-95-01, requires contractors to access the site from 210th Avenue, with the DNR engineer providing specific location and elevation guidance. Contractors must strip 6 inches of topsoil from the embankment footprint, source borrow material from the wetland pool area at least 30 feet from the embankment, and compact materials in specified lifts. The tile installation will connect an existing intake in the right-of-way to a drainage ditch approximately 2,000 feet west, with a finished grade between 0.10% and 0.14%. Contractors are expected to maintain erosion control features and will be responsible for site preparation, material sourcing, and adhering to all applicable codes and ordinances.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

hdelzel Text Box This project includes constructing two dikes, shallow water excavation, installation of tile intakes, a tile outlet /w rodent guard, and the installation of dual-wall non-perforated tile. Construction per Iowa Statewide Urban Design and Specifications (SUDAS).

E Tl - TE E T - TITIE

Description Quantity Unit

1 Mobilization 1 LS

2 Class 10 Excavation, On-site borrow 1150 CY

3 Tile Investigation 1500 FT

4 Class 10 Excavation, Shallow water & Principle Spillway 3300 CY

5 Tile Breaks 5 EA

6 10" CMP, 14 guage (with 10" Rodent Guard) 10 FT

7 8" Non Perf dual wall tile and couplers (connect to exsiting tile intake in road ditch) 1940 FT

8 9" Straw Wattles 100 FT

9 1" Clean Stone 25 TN

ITEM No. ESTIMATE REFERENCE INFORMATION

Access from 210th Ave. DNR Engineer to provide the field location of the start and stop

1 of the dike work and will set an elevation hub

6" of topsoil shall be stripped from beneath the embankment footprint and stockpiled.

Barrow material for embankment shall be taken from the wetland pool area. Must stay

>30' away from embankment footprint to source material. Suitable material shall be compacted in lifts per specification. The final top grade may be obtained by placing 6"-

12" of topsoil to bring the final plan elevation as shown for the areas of the

2 embankments.

Shallow water excavation and grading and pricnciple spillway grading as specified in

4 consrtuction documents.

Tile will connect existing intake in R.O.W. of 210th Ave and outlet in drainage ditch approx. 2,000' feet to the west. Finished grade of the new tile is expected to be on

7 grade between 0.10% and 0.14%.

E E -L ' TE

TE E I Tl

A. The contractor shall notify the following two weeks prior to construction:

1. District Inspector:

Heath Delzell, P.E.

515-979-0104

B. Verify actual locations and elevations with DNR Engineer.

C. All work shall conform to and be performed in accordance with all applicable codes and ordinances.

D. The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to bidding and the start of work. Failure to visit the project site shall not relieve the contractor from perf�rming the work in accordance to the plans, specification, special provisions and contract.

E. The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the DNR Engineer of any discrepancies, omissions, and/or conflicts prior to proceeding with the work.

F. It shall be the contractor's responsibility to provide waste areas or disposal sites for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overh�ul will be allowed for material hauled to these sites. No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the DNR Engineer.

G. The contractor shall not disturb desirable grass areas and desirable trees outside the construction limits. The contractor will not be permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will be subject to the approval of the DNR Engineer.

H. Where utilities and fixtures are shown as Existing on the plans or encountered within the construction area, it shall be the responsibility of the contractor to notify the DNR Engineer of those utilities prior to the beginning of any construction. The contractor shall be afforded access to these facilities for necessary modification of services. Underground facilities, structures and utilities have been plotted from available surveys and records and therefore their locations must be considered approximate only. It is possible there may be others, the existence of which is presently not known or shown. It is the contractor's responsibility to determine their existence and exact location and to avoid damage thereto. No claims for additional compensation will be allowed to the contractor for any interference or delay caused by such work.

I.

J.

The contractor shall shape graded area to maintain surface drainage. All elevations are to finish grade.

The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control features on the project. This may involve seeding, silt fence, rock ditch checks, silt basins or silt dikes.

V, w zz o o Uz

LL.

t-z w t- Ci::

0..

w a

V)

LU

f-z

_J a:::

LU

z

LU

z

V)

LU

z

V) w u Ci::

V) w

Ci::

Ci::

t-z u co V) l'.)

:r:

e>i v,-

U:ri">� 0 ta Z, Cl "" .

ww w>

z. < 0"' Z°" w<

DYIWN&Y f'ROJEONUM8flt

'• 25-02-9 5-0 I

Oi(DIY: OI\Tf.:

z u

LU

z

SEPTEMBER 22, al25

SHfflNo:

C.01

25-02-95-01 Hogsback Wetland Resto MINI
00310_CERTIFICATION REGARDING DEBARMENT, SUSPENSION AND OTHER RESPONSIBILITY MATTERS
Certification Regarding Debarment, Suspension, and Other Responsibility Matters
00320_MINORITY-WOMEN'S BUSINESS ENTERPRISE
EPA Region VII Procedures for Implementation of 40 CFR Part 33.240
00321_GUIDANCE FOR MINORITY-WOMEN'S BUSINESS ENTERPRISE
GUIDANCE FOR MINORITY BUSINESS ENTERPRISE AND WOMEN’S BUSINESS ENTERPRISE REQUIREMENT OF 40 CFR 31.36(e)
00330_CERTIFICATION OF NON-SEGREGATED FACILITIES
CERTIFICATION OF NONSEGREGATED FACILITIES
00340_CERTIFICATION REGARDING LOBBYING
Certification Regarding Lobbying
00350_INSTRUCTIONS FOR DISCLOSURE OF LOBBYING
INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES
00360_NON-DISCRIMINATION IN EMPLOYMENT
NONDISCRIMINATION IN EMPLOYMENT

25-02-95-01 Hogsback WMA - 9-24-25 11X17