PRODUCTION SURGE PLAN.pdf
PDF 157 KB Posted
- Solicitation number
- FA811825R0083
About this file
This document is a Data Item Description (DID) for a Production Surge Plan, with the identification number DI-MGMT-80969. The document outlines the format and content requirements for a contractor's plan to rapidly accelerate and sustain production utilizing existing facilities and equipment in a peace-time acquisition environment, without a declaration of war or mobilization.
Key details include requirements for the Production Surge Plan to document: the maximum sustainable production rate, building a production schedule, lists of subcontracted and non-subcontracted items/components, lists of government contracts being performed at the contractor's facility, potential impact on other government contracts, additional skilled labor requirements, strategic or critical materials needed, and a list of production equipment. The plan must identify items by nomenclature, part number, leadtime, and potential production constraints, with the goal of improving surge protection capability and potentially reducing production leadtime by at least 10 percent.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.
Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.
File details come from the government source that posted it. Updated .