This document outlines product specifications for a state contract opportunity by the Pennsylvania Fish & Boat Commission. The required products include two diesel-powered jet pumps with centrifugal end suction, one primary and one standby, that must be capable of passing solids up to 4 inches. Additionally, the contract requires the installation of approximately 3,000 feet of HDPE pipe, with 1,000 feet being submerged and fused, and the remaining 2,000 feet being connected with flange connections. The awarded vendor will be responsible for all maintenance, installation, and training of Commission staff on the proper operation of the pumps. The contract is for a 28-day rental period with the potential for daily rate extensions if the project requires a longer duration. The vendor must provide cut sheets for any approved equal products and will be required to have an onsite service technician for the initial pump start-up and training.
Pricing for the rental of the pumps shall be based on a monthly rate for the 28-day period, with a daily rate charged for any extensions. The vendor will also be required to provide an hourly rate for a pump service technician. There are no details provided regarding set-asides, incumbents, funding requirements, or other salient information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Attendance Sheet.pdf | ||
| Conneaut Lake Overview.pdf | ||
| MBEWBE Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
Diesel Jet Pump with Centrifugal End Suction: Pump must be equipped with a dry priming system to prevent waste from discharging onto the ground, Maximum Working Pressure: 150 PSI, Maximum Suction Lift: 28 feet, Maximum Casing Pressure: 175 PSI. Thompson #10JSCG-DJDS-45H-M or approved equal. If providing an approved equal cut sheets must be provided with bid for agency personnel to review. Although the majority of the material will be sediment and small gravel the pump must have the ability to pass solids up to and including 4” material. These pumps will be the primary pumps used for this project.
Pump Casing shall be a Heavy Duty class 30 cast iron salt bath nitrate hardened to 500BHN, Equipped with non-clogging Impeller, enclosed 65-45 12 ductile iron with rear equalizing vanes to reduce axial loading and prolong seal and bearing life salt bath nitrate hardened to 500BHN and Mechanical Seal.
Pump must be equipped to accept a 10” male ball end, Godwin part number 100-6769.
Pricing shall be based on a monthly rental for a 28 day period with unlimited running time. If the pumps are required for a longer period of time to complete the project, the vendor shall charge the PA Fish & Boat Commission a daily rate based on pro rating the monthly fee. The awarded vendor will be responsible to supply all maintenance procedures needed on equipment including but not limited to oil changes, filters, etc.
It will be the awarded vendor’s responsibility to install both pumps and make all of the necessary connections to HDPE pipe. Awarded vendor will be required to provide an onsite service technician for initial start up to prime pumps and assure all equipment is running properly. Service technician will also be required to provide all of the necessary training to PA Fish & Boat Commission staff to ensure pumps are being properly operated after the service technician is no longer on the job site.
2.
Diesel Jet Pump with Centrifugal End Suction: Pump must be equipped with a dry priming system to prevent waste from discharging onto the ground, Maximum Working Pressure: 150 PSI, Maximum Suction Lift: 28 feet, Maximum Casing Pressure: 175 PSI. Thompson #10JSCG-DJDS-45H-M or approved equal. If providing an approved equal cut sheets must be provided with bid for agency personnel to review. Although the majority of the material will be sediment and small gravel the pump must have the ability to pass solids up to and including 4” material. This pump will be a stand by pump and will only be used if there is a failure with one of the primary pumps.
Pump Casing shall be a Heavy Duty class 30 cast iron, Equipped with non-clogging Impeller, enclosed 65- 45 12 ductile iron with rear equalizing vanes to reduce axial loading and prolong seal and bearing life and Mechanical Seal. Since this is a standby pump the salt bath nitrate hardening is not required. Pump must be equipped to accept a 10” male ball end, Godwin part number 100-6769.
Pricing shall be based on a monthly rental for a 28 day period with unlimited running time. If the pumps are required for a longer period of time to complete the project, the vendor shall charge the PA Fish &
Boat Commission a daily rate based on pro rating the monthly fee. The awarded vendor will be responsible to supply all maintenance procedures needed on equipment including but not limited to oil changes, filters, etc.
3.
This project will require approximately 3000’ of HDPE18” SDR 17 pipe, 20’ length. Approximately 1000’ of pipe will be submerged into Inlet Run and will be required to be fused together. Vendor will be required to supply the fusion machine and a technician to make all heat welds. All fused pipe shall be heated to 400 degrees for 180 seconds and then be compressed together at 390PSI and allow to cool for twelve minutes.
The remaining pipe approximately 2000’ will not be submerged into water and will be required to be connected with flange connections rated at 150 LBS. ANSI with gasket provided.
To minimize downtime in the event that a primary pump fails and the stand by pump needs to be installed the awarded vendor will be required to install a wye fitting equipped with two gate valves on the discharge side of each pump.
Awarded vendor will be required to install all pipe and make the necessary connections from pump to discharge area and remove upon completion of the project.
4.
Pump service technician hourly rate.