Product Description_V250 and T408 TMS Kit.pdf

PDF 614 KB Posted

Attached to
V250 AND TMS KIT
Solicitation number
W58RGZ25P0016
Issued by

About this file

This Product Description document outlines a requirement by the Prototype Integration Facility (PIF) at Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center, Redstone Arsenal, Alabama, to procure a Torque Measurement System (TMS) for the V250 and T408 aircraft engine testing. The solicitation requires two primary deliverables: a V250/T408 Torque Measurement System Kit and a V250 Application Study for the T408 Aircraft Engine.

The TMS Kit must include a module with shaft-to-engine components, plumbing, calibration kit with weights, and electronics (signal processor, Rotastat Control, and 90 ft. cable). The application study requires the contractor to evaluate the V250 Dynamometer for T408 Turboshaft Engine testing, defining interface requirements, considering test plans, inertia, speeds, and power. Deliverables include special rotor considerations, identifying torque measurement equipment, and potential updates to drawings and documents. The document is dated 26 June 2025 and is associated with Solicitation Number W58RGZ25P0016, with a response deadline of 10 July 2025.

View the file

Other files

File Type Posted
Sources Sought_V250 and T408 TMS Kit.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26 June 2025

PRODUCT DESCRIPTION

The Prototype Integration Facility (PIF), Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center, Redstone Arsenal, Alabama, has a requirement to procure a Torque Measurement System to interoperate with a Variable-Geometry, Radial Outflow Compressor (VAROC) Air Dynamometer 250 and T408 aircraft engine in support of Flexible Engine Diagnostics Systems (FEDS).

Description of Required Supplies/Services:

Description

V250 / T408 Torque Measurement System Kit

The contractor shall provide the following with the TMS Kits:

- TMS Module / Shaft to engine components: spline adapter and splined hub, if necessary.

- TMS Plumbing

- TMS Calibration Kit with weights

- Electronics: Signal processor, Rotastat Control and 90 ft. cable

V250 Application Study for the T408 Aircraft Engine

The contractor shall evaluate the V250 Dynamometer with respect to testing objectives and configuration needs for testing the GE T408 Turboshaft Engine. The contractor shall define the specific interphase requirements with consideration to test plans, including inertia requirements, speeds, and power.

The following are deliverables as a result of this application study:

- Special Rotor consideration for inertia requirements

- Identifying the torque measurement equipment, including but not limited to torque meter, interconnect shafts, and electronics.

- Upon determining appropriate torque meter system, CN will update or generate new drawings and documents and enable life solutions.

File details come from the government source that posted it. Updated .