Product Description - Priority Parts List.pdf

PDF 105 KB Posted

Attached to
Light Armored Vehicles (LAVs) Retrograde & Repair
Solicitation number
W912CL-23-Q-0004
Issued by

About this file

This document contains a priority parts list for the retrograde and repair of three Light Armored Vehicles (LAVs) under solicitation number W912CL-23-Q-0004 from the Department of the Army Materiel Command Army Contracting Command. The parts list includes 23 line items for various consumable parts and repair services needed for the LAVs, such as oil filters, spark plugs, tires, wheel alignments, suspension components, and labor hours. Freight charges from Japan for suspension parts are also included. The response is due under the terms of solicitation number W912CL-23-Q-0004 for the retrograde and repair of LAVs issued by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Regional Contracting Center Request for Quote

W912CL-23-Q-0004

A. The Government has a requirement for the item(s) with minimum specifications as follows:

Light Armored Vehicle Repair and Parts:

Request Brand Name or Equal (Nissan Model: Y61) (3 Vehicles)

Description Mfr Part # Quantity Unit

1 Oil Filter Assy 1520831U0B 3 EA 2 Mobile 1 Full Synthetic Oil

(quarts) 10W30 21 EA

3 Air Filter Element U4827 3 EA 4 Fuel Filters F1006-161 3 EA 5 Spark Plugs LRF5A-11 18 EA 6 Coil Pack a1C-4002G 18 EA 7 Main Drive Belt 11720VC200 3 EA 8 Acc Drive Belt 02117-07023 3 EA 9 New Falkin Wild Peak AT Tires LT265/75/R16 15 EA 10 Exhaust Flex Muffler Repair 4799-735 3" 3 EA 11 A/C Freon for Each Vehicle N/A 3 EA 12 Vehicle Wheel Alignment N/A 3 EA 13 Front Sway Bar & End Links N/A 1 EA 14 Steering Damper OASU0954004 3 EA 15 Left Hand Track Rod End TE4891LHD 3 EA 16 Right Hand Track Rod End TE4891RHD 3 EA 17 Tracking Arm Bushings 55135-01J01 6 EA 18 Left Hand Drag Link Ends TE8570LHD 3 EA 19 Right Hand Drag Link Ends TE8570RHD 3 EA 20 Shop Supplies N/A 1 EA 21 Peak Asian Blue Antifreeze for

Each Vehicle N/A 3 EA

22 Labor Hours (all 3 vehicles 75 hours each) N/A 225 EA

23 Freight Charge From Japan To USA( suspension parts) N/A 1 EA

File details come from the government source that posted it. Updated .