This document is a Procurement Justification Form for the East Moline Correctional Center in the state of Illinois. It seeks to procure products and services for the repair of boilers at the facility using small purchase procedures. The scope of the project includes the procurement of three valves and the provision of acid washing services to remove mineral and chemical buildup in the boilers. The boilers at the facility are over 40 years old and have recently failed inspection, necessitating immediate repair to prevent the temporary closure of the prison due to lack of heated water and heat.

The document indicates that the East Moline Correctional Center has attempted to procure a boiler repair and maintenance contract numerous times in the past 5 years but has been unsuccessful due to a lack of bidders. This procurement approach has been effective for the state of Illinois for the past 10-20 years of operation. No special conditions or set-asides are applicable to this procurement.

View the file

Other files

File Type Posted
RM 20-2047 APPROVAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

CPO - General Services Procurement Justification Form V. 18.3 Page of Procurement Justification Programmatic Objective Describe what it is that you intend to procure (software, hardware, services, maintenance, etc.) including quantity if relevant. Describe business need for the procurement, and how the procurement will meet objectives of your agency and the State. Please make sure to spell out acronyms. Explain the potential consequences if this procurement is not approved. If other than one-time purchase, explain solicitation method, pricing structure (hourly, per item, not-to-exceed, etc.).

Economic Justification Describe the economic benefit for the procurement approach selected and anticipated return on investment. Describe consequences if different method is used to procure good or service. Indicate any additional procurement expenditures that will be processed separately in support of, or in conjunction with, this procurement including such items as implementation, installation, increased maintenance or support, etc. If method other than solicitation, indicate price breakout including hourly rate if applicable.

History/Background State how business need is currently being met, if applicable. Indicate if this is a new initiative, replacement or expansion of existing system or contract, or a continued need which is procured yearly or quarterly, etc. If renewal or amendment, indicate Purchase Order # of previous procurement and contract term of existing contract. If replacing previous contract, explain if contract expired with no renewal options remaining, or choosing not to execute remaining renewal, and why. If bid in previous years, indicate the procurement approach used, any changes to previous solicitation requirements, and the results of previous bid (were there multiple bids?) Indicate if procurement is subject to Small Business Set-Aside, Business Enterprise Program or Veteran's Business Program and, if yes, whether a waiver will be sought.

Impact if Project is Not Completed What Special Condition, If Any, is Applicable to Your Procurement?

What Special Condition, If Any, is Applicable to Your Procurement?

Provide the explicit rationale for brand name, (such as system compatibility, TCO maintenance costs, existing expertise). Detail emergency criteria permitted by the Illinois Procurement Code. Give detailed rationale for emergency procurement. Provide explicit rationale for no-bid award for the State Use program and detail cost differential for using State Use vendors for the life of the program. Be as specific as possible.

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
Response1: To procure products and services under the Small Purchase Procurement procedures for repair to boilers at the East Moline Correctional Center.
Response2: Small purchase procedures are being used to procure products and services for a boiler repair. The facility does not have the equipment necessary to adequately clean the boilers from mineral and chemical build up inside the boilers after years of operation at the facility. Entire scope of the project is to procure three valves and obtain services for acid washing boilers to remove mineral and chemical build up.
Response3: The Correctional Center has been in operation as a facility since the early 1980's and has been in existence as a state facility since the early 1900's. Recently the boilers were inspected by the Illinois state boiler inspectors and failed inspection. The boilers were manufactured in the early seventies and have been in operation since that time. The East Moline Correctional Center has attempted many times in the last 5 years to procure a boiler repair and maintenance contract and has failed due to lack of bidders and companies willing to bid on state contracts. This approach to procurement has been effective for the state of Illinois for the past ten to twenty years of operation.
Response4: Without an immediate need procurement the prison would have to close temporarily due to lack of heated water and heat for the offenders and employees.