About this file
This is a Request for Proposal (RFP) and Specifications & Project Manual issued by the Town of Westport, Connecticut, for the construction of a building shell at Wakeman Farm Town Barn (RFP #27-177T). The project involves supplying and installing all materials required for the building shell, including interior partitions, windows, and doors on a foundation to be provided by others. Cabinets are excluded from the scope of work, though panelized or prefabricated construction is accepted as an alternative. Sealed bids are due by 11:00 AM on September 22, 2026, at the Town of Westport Controller's Office, with bid opening via ZOOM at 11:30 AM the same day. A non-mandatory site walkthrough is scheduled for Wednesday, September 9, 2026, at 10:00 AM, and written questions must be submitted by 4:00 PM on September 14, 2026. Construction is to commence 10 calendar days after written authorization to proceed and must be completed within 180 calendar days of commencement. Work to be performed by others under separate agreement includes all concrete and foundation work, construction fence installation, erosion control measures, cultic units and underground piping, painting, temporary electrical service, demolition, and site work.
The bid must be accompanied by a bid bond equal to 15 percent of the total bid amount, including both base bid and alternates. Upon award, the successful bidder must furnish performance and payment bonds, each in the amount of 100 percent of the contract price within 10 calendar days of receiving the Notice of Award. One alternate price is included in the bid: installing owner-supplied reclaimed barn siding in lieu of cedar siding. The base bid is divided into line items covering general conditions and temporary sanitary facilities, carpentry (including framing, sheathing, windows, doors, and siding), roofing (including moisture protection, gutters, and flashing), and additional base bid items. The Town is exempt from federal taxes and Connecticut sales and use taxes; these taxes must not be included in the bid price. The contractor must obtain workers compensation insurance with employer's liability limits of at least $500,000 per accident, commercial general liability insurance with limits of $1,000,000 per occurrence and $2,000,000 aggregate, commercial automobile insurance of $1,000,000, and umbrella or excess liability insurance of $5,000,000 each occurrence and aggregate. Liquidated damages of $200.00 per calendar day apply for failure to complete the work within the contract time. Monthly progress payments will be made based on completed, in-place unit quantities and agreed-upon percentages of completion for lump sum items, with the Owner retaining 5 percent for a one-year maintenance period following final completion.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell
August 17, 2026
Town of Westport logo with a stylized blue and white W above the word Westport and the word Connecticut below.
Town of Westport Board of Selectmen
Kevin Christie, First Selectman
Department of Public Works
Laurence Roberts, Director of Public Works
Keith S. Wilberg, PE, LS, Town Engineer
Engineering Division
110 Myrtle Ave, Room 210
Westport, CT 06880
(203) 341-1120
IRS ID #06-6002128
Town of Westport
Index
Town of Westport Bidding and Contract Requirements
Scope of Work Notice to Bidders 00200 - Information for Bidders 00300 - Proposal 00401 - Bid Bond
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 1/145 tel:+12033411120
00402 - Qualifications of Bidder 00403 - Non-Collusive Bid Statement 00404 - Agreement 00405 - Payment Bond 00406 - Performance Bond 00500 - General Conditions 00700 – Supplementary Conditions 01010 - Introduction to Technical Specifications 01530 – Dust Control 01600 – Restoration
Division 1 - General Requirements
01 23 00 Alternates 01 33 00 Submittals and Substitutions.
01 42 00 Applicable References 01 45 00 Quality Control 01 56 00 Temporary Barriers & Enclosures 01 74 19 Cleaning 01 75 00 Starting & Adjusting 01 77 00 Project Closeout
Division 2 – Site & Existing Conditions
See Civil Drawings & Specifications
Division 6 – Wood and Plastics
06 10 00 Rough Carpentry 06 40 00 Casework 06 16 53 Wall & Roof Sheathing
Division 7 – Thermal & Moisture Protection
07 21 00 Building Insulation 07 31 00 Asphalt Shingles 07 84 00 Firestopping 07 92 00 Sealants
Index – 1
Division 8 – Openings
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 2/145
08 14 00 Wood Doors 08 36 13 Sectional Doors 08 71 00 Door Hardware 08 71 23 Sectional Door Operator
Division 9 - Finishes
09 21 00 Gypsum Board System 09 30 13 Tile 09 67 23 Epoxy Coating 09 81 60 Sound Insulation 09 90 00 Painting
Division 10 – Specialties
10 14 00 Signage Index – 2
Scope of work RFP 27-177T Building shell
Scope of work
RFP 27-177T
Building shell
1. Scope of work
Supply and install all material as required for the building shell, including all interior partitions, on a foundation provided by others.
All windows and doors are to be included Cabinets are not included Panelized or prefabricated construction is an accepted alternative. Specifications on materials proposed must be submitted with the bid.
The following work will be provided by others under a separate agreement with the owner.
All concrete and foundation work Installation of the construction fence Installation of all erosion control measures including the silt fence Installation of all cultic units and associated underground piping for the roof drains All painting Temporary electrical service All demolition All site work
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 3/145
Town of Westport, Connecticut Notice to bidders
Westport logo
WESTPORT, CONNECTICUT
OFFICE OF THE CONTROLLER
Town Hall, 110 Myrtle Ave.
Westport, Connecticut 06880
(203) 341-1080
Town of Westport, Connecticut
Notice to bidders
RFP 27-177T
Sealed bids for:
Wakeman Farm Town Barn Building Shell will be received by the Town of Westport until
11:00 AM, September 22, 2026 at
Westport Town Hall Controller’s Office, Room 313 110 Myrtle Avenue Westport, CT 06880
No bids will be received after the hour specified above. Bid documents may be downloaded from the Town’s website:
www.westportct.gov/bids
The Town will hold a non-mandatory walkthrough at the site on Wednesday, September 9, 2026 at 10:00 AM
Questions in regards to the bid shall be submitted in writing to bwatson@westportct.gov by 4:00PM September 14th.
The Bid Opening will take place via ZOOM at 11:30 AM after the bid deadline. Bidders may request a ZOOM invitation by e-mailing Berit Watson at bwatson@westportct.gov,
(203) 341-1047.
The Town of Westport reserves the right to waive any defects and informalities in the bidding or in any bid, to reject any or all bids for any reason whatsoever, and to accept that bid deemed to be in the best interest of the Town of Westport.
Berit Watson Westport Purchasing Officer
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 4/145 http://www.westportct.gov/bids mailto:bwatson@westportct.gov
Wakeman farm barn Westport CT
RFP-27-177T
Building shell
00200 Information for bidders
Bids will be received by The Town of Westport (herein called the "Owner"), at the Office of the Controller, Room 313 Town Hall - 110 Myrtle Avenue, Westport, Connecticut, 06880 until:
11:00 AM, September 22, 2026
No bids will be received after the hour specified above. The Bid Opening will take place via ZOOM at 11:30 AM after the bid deadline. Bidders may request a ZOOM invitation by e-mailing Berit Watson, Westport Purchasing Officer, at bwatson@westportct.gov, (203) 341-1047.
Each Bid must be submitted in a sealed envelope, addressed to The Town of Westport, Office of the Controller, Room 313 at 110 Myrtle Avenue, Westport, Connecticut. Each sealed envelope containing a Bid must be plainly marked on the outside as:
RFP #27-177T Wakeman Farm Town Barn
Building shell
The bid envelope should also bear on the outside the name of the Bidder, the Bidder's address, and license number if applicable. If forwarded by mail, the sealed envelope containing the Bid must be enclosed in another envelope addressed to the Owner at the Office of the Controller, Room 313, Town Hall, 110 Myrtle Avenue, Westport, Connecticut, 06880.
All Bids must be made on the required Bid form. All blank spaces for Bid prices must be filled in, in ink or typewritten, and the Bid form must be fully completed and executed when submitted. Only ONE hard (paper) copy of the Bid form is required, and ONE electronic copy (CD or memory stick).
The Owner may waive any informalities or minor defects or reject any and/or all Bids. Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof. Any Bid received after the time and date specified shall not be considered. No Bidder may withdraw a Bid within 90 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder.
Bidders must satisfy themselves of the accuracy of estimated quantities in the Bid Schedule by an examination of the site and a review of the Contract Drawings and Specifications including Addenda. After Bids have been submitted, the Bidder shall not assert that there was a misunderstanding concerning the quantities of Work or of the nature of the Work to be done.
Purchases made by the Town of Westport are exempt from payment of Federal Taxes and Connecticut Sales and Use Taxes, and such tax must not be included in the bid price of any items or materials permanently incorporated into the work or furnished to the Town under the contract.
The Contract Documents contain the provisions required for the construction of the Project. Information obtained from an officer, agent, or employee of the Owner or any other person shall
Wakeman farm barn Westport CT
RFP-27-177T
Building shell
00200 Information for bidders not affect the risks or obligations assumed by the Contractor or relieve the Bidder from fulfilling any of the conditions of the contract.
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 5/145 tel:+12033411047
Each Bidder must include completed Qualifications of Bidder and Non-Collusive Bid Statement forms with his Bid. The low Bidder is required to submit completed Qualifications of Subcontractors, and non-collusion Affidavit of Subcontractor forms within ten (10) days of the Bid.
Each Bid must be accompanied by a Bid Bond payable to the Owner for fifteen (15) percent of the total amount of the Bid, including both the base bid amount and all alternates. As soon as the Bid prices have been compared, the Owner will return the bonds of all except the three lowest responsible Bidders. When the Agreement is executed the bonds of the two remaining unsuccessful Bidders will be returned. The Bid Bond of the successful Bidder will be retained until the payment bond and performance bond have been executed and approved, after which it will be returned. The surety on the Bid Bond must be a corporate surety licensed to sign surety bonds in the State of Connecticut and also listed by the United States Treasury Department in its latest list as a qualified surety acceptable to the United States Government. No bid bond will be accepted if the amount is less than 15% of the total estimated bid, including both the base bid and all alternates, or if the amount exceeds the limit for which the United States Treasury Department has qualified the surety for any one bond. A certified check may be used in lieu of a Bid Bond.
A Performance Bond and a Payment Bond, each in the amount of 100 percent of the Contract Price, with a corporate surety approved by the owner, will be required for the faithful performance of the contract. The surety on the bond must meet the requirements stated under Bid Security except that the amount of the bond may exceed the limit for which the United States Treasury Department has qualified the surety if the excess is reinsured with surety companies that are qualified on the United States Treasury Department list for an amount equal to the amount of the reinsurance. Written evidence of how any excess suretyship has been placed by the surety signing the bond must accompany the bond.
Attorneys-in-fact who sign the Bid Bonds or Payment Bonds and Performance Bonds must file with each bond a certified and effective dated copy of their power of attorney.
The party to whom the contract is awarded will be required to execute the Agreement and obtain the Performance Bond and Payment Bond within ten calendar days from the date when Notice of Award is delivered to the Bidder. The Notice of Award shall be accompanied by the necessary Agreement and bond forms. In case of failure of the Bidder to execute the Agreement, the Owner may at his option consider the Bidder in default, in which case the Bid Bond accompanying the proposal shall become the property of the Owner.
The Owner, upon receipt of acceptable Performance Bond, Payment Bond, and Agreement signed by the Contractor shall sign the Agreement and return to the Contractor an executed duplicate of the Agreement within a 10-day period. The returned executed Agreement by the Owner to the Contractor shall be accompanied with a Notice to Proceed.
The Owner may make such investigation as he deems necessary to determine the ability of the Bidder to perform the Work, and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such
Wakeman Farm Barn Westport CT
RFP-27-177T
Building Shell
00200
Information for bidders
Bidder is properly qualified to carry out the obligations of the Agreement and to complete the Work contemplated therein.
A conditional or qualified Bid will not be accepted.
The Owner reserves the right to reject the use of the Bidders subcontractor if the evidence submitted by, or investigation of, such subcontractor fails to satisfy the Owner that such subcontractor is properly qualified to complete the work contemplated herein. Rejection of the Bidders subcontractor shall not relieve the Bidder of any requirements of the Bid or this Contract nor provide grounds for the Bidder to request compensation for his use of an alternate qualified subcontractor.
All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout.
Each Bidder is responsible for inspecting the site and for reading and being thoroughly familiar with the Contract Documents. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation in respect to his Bid.
The low Bidder must supply the name and addresses of major material suppliers and subcontractors when requested to do so by the Owner.
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 6/145
Procedure for determining the lowest responsible, qualified bidder:
The Town shall determine the “Lowest Responsible Qualified Bidder” on the basis of the Bidder’s submission of the lowest “Total Base Bid”; responsiveness of the Bidder’s proposal; demonstration of a history of ability and integrity necessary to perform the required work; and certification of the Bidder’s performance of the required work in accordance with the contract documents.
In the event of any discrepancies between this Information for Bidders and other sections of the contract documents, this Information for Bidders shall govern.
End of Section
Note about transcribed forms: this format exists to remove accessibility barriers, but some recipients prefer the original printed format. If you'd like help moving your entries into the original form, please use the live assistance options in the sidebar or contact the author.
00300
Proposal The Board of Selectman Town Hall Westport, Connecticut
Project: Wakeman Farm Barn Town RFP # 27-177T Building Shell
The undersigned declares he/she has carefully examined the Information for Bidders, Form of Proposal, Plans, Specifications, Addenda listed below, any other contract documents, and the site of work for the above project and hereby proposes to furnish all plant, labor, materials and equipment and perform all work necessary to complete the project in strict accordance with the requirements of the contract documents.
Bid security
Accompanying this proposal is security for 15% of the contract bid upon, in the form of a bid bond in the amount of:
The names and addresses of all partners, officers or parties interested in the foregoing bid are as follows:
Name Address Phone # Email Name row 1 Address row 1 Phone number row 1 Email row 1
Name row 2 Address row 2 Phone number row 2 Email row 2
Name row 3 Address row 3 Phone number row 3 Email row 3
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 7/145
Notice address and bidder contact information
The undersigned hereby designates at his office to which all notices and letters may be delivered or mailed.
Signature of bidder Contact information
Name of Corporation, Firm or Individual
Addenda acknowledgment
In signing this Bid, I agree that I have received all the Bid Documents entitled dated in the Invitation to Bid, List of Drawings and Addenda numbered and dated as follows:
Addendum No. Dated mm/dd/yyyy Addendum No. Dated mm/dd/yyyy
Addendum No. Dated mm/dd/yyyy Addendum No. Dated mm/dd/yyyy
1. Base bid:
The Base Bid shall include the cost of materials, labor, equipment, overhead, profit and taxes necessary to complete the work to the Owner’s satisfaction. This includes, but is not limited to, temporary work, submittals, subcontractors, and other efforts required to affect the work. It also includes all materials, labor, PR-1
00300
Proposal and equipment for incidental work associated with the installation of the item, such as hardware, welding, curing and protection, and any other item implicit to the proper installation of the item subject to the acceptance by the Owner. The cost in the Base Bid shall include the quantities reflected in the Bid Documents.
Base bid
General Conditions & temporary sanitary facilities ($)
Carpentry, including framing, sheathing, windows, doors and siding ($)
Roofing, including moisture protection, gutters and flashing ($) Additional base bid item ($)
Total base bid ($)
Enter dollar amounts in numbers only.
The following costs shall be added to all change orders that increase the cost of the project:
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 8/145
Construction will commence 10 calendar days after written authorization to proceed and will be completed 180 calendar days after commencement.
2. Alternate prices:
The following Alternate Prices are not included in the Base Bid:
Alternate #1
Install owner supplied re-claimed barn siding in lieu of the cedar siding specified
Add/Deduct Dollars ($)
3. Conditions of submittal:
In submitting this bid, I agree as follows:
1. To hold open my bid for 120 days after bid opening.
2. To enter into and execute a contract, if awarded on the basis of this bid, according to the Agreement listed in the Bidding Documents.
3. To accomplish the work in accordance with the Contract Documents.
4. To begin work within ten (10) calendar days of receipt of Notice to Proceed, NTPC1.
5. To substantially complete the Work within the Contract Time.
6. By submission of this bid, each Bidder and each person signing on behalf of any Bidder certifies, and in case of a joint bid, each party thereto certifies, as to its own organization, under penalty of perjury, that to the best of knowledge and belief:
1. The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor.
PR-2
00300 Proposal
6.2 Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or to any competitor; and
6.3 No attempt has been made or will be made by the Bidder to induce any other person, partnership, or corporation to submit or not submit a bid for the purpose of restricting competition.
End of Section
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 9/145
PR-3
Wakeman Farm Barn Westport CT
RFP-27-177T
00401
Bid Bond
Town of Westport Westport, Connecticut
Know all men by these presents
That we, Principal name Town of principal County of principal
State of Connecticut, as principal, and
Surety corporation name State of surety incorporation
Organized and existing under the laws of the State above, and duly authorized to transact a surety business in the State of Connecticut (hereinafter called the “Surety”), as Surety, are held and firmly bound unto the Town of Westport, as Obligee, in the sum of:
Bond sum in words Bond sum in figures ($)
Lawful money of the United States of America, for the payment of which, well and truly to be made to the Obligee, we bind ourselves, our heirs, successors and assigns, jointly and severally, firmly by these presents.
Condition of this obligation
The condition of this obligation is such that, whereas the Principal has submitted herewith to the Town of Westport, a Proposal dated:
Proposal date mm/dd/yyyy
Attached, which is:
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 10/145
Wakeman Farm Town Barn
RFP #27-177T
Now therefore,
a. If such Proposal is rejected; or in the alternative,
b. If such Proposal is accepted and the contract is awarded to the Principal, and the Principal enters into a written agreement when required by the Obligee, with such surety bonds as shall be acceptable
Wakeman Farm Barn Westport, CT
00401
RFP-27-177T
Bid Bond to the agreement and for the payment of all labor and material used in the performance of the work, then this obligation shall be null and void; otherwise the same shall remain in full force and effect, and the Principal and Surety hereto agree to pay to the Obligee all damages sustained by the agreement, including, but without limiting the generality of the foregoing, the difference between the amount of the Principal's Proposal submitted herewith and the amount for which the Obligee may contract with another party to perform the work covered by such Proposal if the latter amount is in excess of the former, subject, however, to the following conditions:
1. The liability of the Principal to pay to the Obligee the damages sustained by the Obligee as a consequence of the Principal's failure to enter into the agreement is not limited to the amount of this bond, and
2. The obligation of the Surety hereunder shall be the full amount of the Principal's liability, reduced by any amount paid by the Principal on account of such liability, but not more than the amount of this bond in any event.
3. The Surety, for value received, hereby stipulates and agrees that the obligation of said Surety and its bond shall in no way be impaired or affected by any extension of the time within which the Town of Westport may accept such bid; and such Surety does hereby waive notice of any such extension.
Wakeman Farm Barn Westport CT
RFP-27-177T
00401
Bid bond
In witness whereof, we have set our hands and seals this
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 11/145
Execution date
Day of A.D. 20
Principal signatures
Witness signature
Witness
Principal signature
Principal (L.S.)
Witness signature
Witness
By
By: (L.S.)
(If the Principal is a Corporation or Partnership, so indicate, as well as title of officer signing this bond on its behalf.)
Surety signatures
Witness signature
Witness
Surety signature
Surety (L.S.)
Witness signature
Witness
By
By: (L.S.)
Wakeman Farm Barn Westport CT
RFP-27-177T
00401
Bid Bond Note: If an individual signs as agent for a Surety Company, he must also submit a Power of Attorney enabling him to act on behalf of the Surety Company, as well as a statement of its financial condition, and a copy of the corporate resolution authorizing the issuance of bonds.
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 12/145
RFP-27-177T
00401
BID BOND
ACKNOWLEDGEMENT OF PRINCIPAL
State of County of SS Date
Enter as shown on the form.
Personally appeared For signer(s) and sealer(s) of the foregoing instrument and acknowledged the same to be free act and deed, before me.
Commissioner of the Superior Court Notary Public My Commission Expires
ACKNOWLEDGEMENT OF SURETY
State of County of SS Date
Enter as shown on the form.
Personally appeared For signer(s) and sealer(s) of the foregoing instrument, Word before free act and deed
Blank field after instrument
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 13/145 being thereunto duly authorized, and acknowledged the same to be free act and deed, and the free act and deed of said corporation, before me.
Commissioner of the Superior Court Notary Public My Commission Expires
Wakeman Farm Barn Westport CT
RFP-27-177T
00402
Qualifications of Bidder Wakeman Farm Town Barn
RFP #27-177T
The Bidder is required to submit on the following pages the information required in regard to qualifications for the Work.
(Use back of this sheet if necessary)
Bidder qualifications
A. The location, character, cost, date and names of engineers or officials of similar work previously constructed by the undersigned are as follows:
B. The equipment which will be available for performing the work under this contract is as follows:
Own equipment Rented equipment
Word before free act and deed 9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 14/145
C. The undersigned has failed to complete satisfactorily the following contracts, including also those in which the surety has participated. (If there have been no contracts which the bidder has failed to complete satisfactorily, including also those in which the surety has participated, the bidder shall definitely so state.)
Bidder identification Name of bidder Address
Wakeman Farm Barn Westport, CT
RFP-27-177T
00403 Non-collusive bid statement
Wakeman Farm Town Barn
RFP #27-177T
All bidders are required to sign a Non-Collusive Bid Statement with all public bids as follows:
1. The bid has been arrived at by the bidder independently and has been submitted without collusion with, and without any agreement, understanding, or planned common course of action with any other vendor of materials, supplies, equipment, or services described in the Advertisement for Bids, designed to limit independent bidding or competition, and
2. The contents of the bid have not been communicated by the bidder or its employees or agents to any person not an employee or agent of the bidder or its surety on any bond furnished with the bid, and will not be communicated to any such person prior to the official opening of the bid.
Bidder information Name of bidder
Address
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 15/145
Address continued
Signature
Title Date mm/dd/yyyy
Wakeman Farm Barn Westport CT
RFP-27-177T
00404 Agreement
Wakeman Farm Town Barn RFP #27-177T
Agreement parties and date
This Agreement, made this day of , 20 , by and between THE TOWN OF WESTPORT, a municipal corporation in the COUNTY OF FAIRFIELD and the State of Connecticut (hereinafter called the "Owner") and
Contractor legal name Contractor legal name (continued, if needed) doing business as a (an individual), or (a partnership), or (a Corporation) (hereinafter called the "Contractor") organized and existing under the laws of the State of Connecticut.
WITNESSETH: That for and in consideration of payments and agreements hereinafter mentioned:
1. The Contractor will commence and complete the construction of:
Wakeman Farm Town Barn
RFP #27-177T
within 180 consecutive calendar days of receipt of the Notice to Proceed. Any exceptions to this must be noted in the bid proposal.
2. The Contractor will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the project described herein.
3. The Contractor agrees to perform all of the Work described in the Contract Documents for the sum arrived at by multiplying the Unit Prices of the respective items in the Bid Schedule by the total quantities of the items completed and accepted, subject to additions and deductions as
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 16/145 provided in the General Conditions.
4. The term "Contract Documents" means and includes the following:
Advertisement for Bids Information for Bidders Proposal Agreement
Wakeman Farm Barn Westport CT
RFP-27-177T
00404 Agreement
General Conditions
Special Provisions
Specifications
Contract Drawings
Addenda as herein enumerated:
No. Dated 20
No. Dated 20
No. Dated 20
Wakeman Farm Barn Westport, CT
RFP-27-177T
00404 Agreement
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 17/145
5. The Owner will pay to the Contractor in the manner and at such times as set forth in the General Conditions such amounts as required by the Contract Documents.
6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.
Wakeman Farm Barn Westport CT
RFP-27-177T
00404 Agreement
In witness whereof, the parties hereto have executed, or caused to be executed by their duly authorized officials, 4 copies of this Agreement, each of which shall be deemed an original on the date first above written.
Contractor execution
(Seal)
Attest:
Attest signature
Attest name or title
Contractor
By (L.S.)
Name
Title
Date mm/dd/yyyy
Town of Westport execution
(Seal)
Attest:
Attest signature
Attest name or title
Town of Westport
By (L.S.)
Name
Kevin Christie, First Selectman
Date mm/dd/yyyy
Approval as to form
Approved as to form:
Assistant Town Attorney signature
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 18/145
Asst. Town Attorney
I certify that the foregoing Contract has been examined and found to conform to the requirements of Chapter 11 of the Town Charter.
Wakeman Farm Barn Westport CT
RFP-27-177T
00404
Agreement
Controller mm/dd/yyyy
Date
Note about this form: this form is shown as a record of what was originally submitted. The fields display the recorded entries and are not interactive.
Wakeman Farm Barn Westport CT
RFP-27-177T
00405
Payment Bond
Town of Westport Westport, Connecticut
Know All Persons by These Presents
Bond information
That we, of the City/Town of , County of
, and state of Connecticut; as Principal, and
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 19/145
, as Surety, are held and firmly bound unto the Town of Westport, hereinafter called Owner in the sum of:
in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors and assigns, jointly and severally, firmly by these presents.
The condition of this obligation is such that, whereas the Principal has entered into a certain written contract with the Owner, dated the day of , A.D., 20 , (“Contract”) a copy of which is hereto attached and made a part hereof for the construction of:
Wakeman Farm Town Barn
RFP #27-177T
Now therefore, if the Principal and each of its Subcontractors shall promptly make payment to persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the work provided for in such Contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such work, and all insurance premiums on said work, and for all labor, performed in such work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
Wakeman Farm Barn Westport CT
RFP-27-177T
00405 Payment bond Provided, further, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the work or to the specifications.
Provided, further, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
Every person furnishing material or performing labor in the performance of the contract, either as an individual, as a subcontractor, or otherwise, shall have the right to sue on this bond.
In witness whereof
We have set our hands and seals this day of , 20 .
Witness 1
Witness signature
Principal
Name of principal
Witness 2
Witness signature
Principal signature block
By
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 20/145
Print name Print name Print name
Print title
Witness 3 Witness signature
Print name
Surety Name of surety
Wakeman Farm Barn Westport CT
RFP-27-177T
00405 Payment bond
Witness
Witness signature
Print name
Signer
By Print name
Print title
Note: Date of bond must not be prior to date of contract. If contractor is a partnership, all partners should execute bond.
Important: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Connecticut.
Wakeman Farm Barn Westport, CT
RFP-27-177T
00406
Performance Bond
Town of Westport
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 21/145
Westport, Connecticut
Know all persons by these presents
That we, Principal name City/Town Locality County
State as Principal, and
Surety name City/Town Locality County
State as Surety, are held and firmly bound unto the Town of Westport, hereinafter called Owner in the sum of:
Bond amount written out Bond amount ($) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors and assigns, jointly and severally, firmly by these presents. The liability of the Surety under this bond shall in no event exceed the bond amount set forth above or in any additions, riders or endorsements properly issued by the Surety.
Contract details
The condition of this obligation is such that, whereas the Principal has entered into a certain written contract with the Owner, dated the
Day Month Year
(“Contract”) a copy of which is hereto attached and made a part hereof for the construction of:
Wakeman Farm Town Barn
Request for Proposal #27-177T
Now therefore, if the Principal shall well and truly keep, and perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and during any additional guaranty period after the original term of the Contract, and if he shall satisfy all claims and demands incurred under such Contract, and shall fully indemnify and
RFP-27-177T
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 22/145
00406
Performance Bond Save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect.
Provided, further, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the work or to the specifications.
Provided, further, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
Wakeman Farm Barn Westport CT
RFP-27-177T
00406
Performance bond
Execution statement
In witness whereof, we have set our hands and seals this day of , 20 .
Principal witnesses Witness
Print name
Witness Print name
Principal [Insert name of principal], Principal
By
Print name Print title
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 23/145
Surety witnesses
Witness Print name
Witness Print name
Surety
[Insert name of surety], Surety
By
Print name Print title
Note: Date of bond must not be prior to date of contract. If contractor is a partnership, all partners should execute bond.
Important: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the State of Connecticut.
Wakeman Farm Barn Westport CT
RFP-27-177T
00500
00500 General conditions
Table of contents
Article title Page
1. Definitions GC-1
2. Agreement and Contract Documents GC-1
3. Shop Drawings and Submittals GC-1
4. Work Area, Materials Storage, Temporary Services and Facilities GC-2
5. Inspection, Testing and Certificates of Conformance GC-2
6. Substitutions GC-2
7. Surveys, Layout of Work GC-2
8. Permits, Ordinances, and Regulations GC-3
9. Supervision by Contractor GC-3
10. Protection of Work, Property, Persons GC-3
11. Night and Sunday Work GC-3
12. Blasting and Explosives GC-3
13. Job Meetings GC-3
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 24/145
Article title Page
14. Changes in the Work GC-3
15. Changed Conditions GC-4
16. Changes in Contract Price GC-4
17. Time for Completion and Liquidated Damages GC-4
18. Suspension of Work, Termination and Delay GC-4
19. Measurement and Payments to Contractors GC-5
20. Partial Use of Site Improvements GC-6
21. Acceptance of Final Payment as Release GC-6
Wakeman Farm Barn Westport CT
RFP-27-177T
00500
General conditions
22. Insurance GC-6
23. Contract Security GC-7
24. Assignments GC-7
25. Indemnification GC-7
26. Separate Contracts GC-8
27. Private Utility Lines GC-8
28. Work by Others GC-8
29. Subcontracting GC-8
30. Engineer's Authority GC-8
31. Land and Rights of Way GC-8
32. Guaranty GC-8
33. Taxes GC-8
34. Provisions Required by Law Deemed Inserted GC-9
35. Safety Provisions GC-9
36. Wage Rates GC-9
00500
General conditions
1. Definitions
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 25/145
Addenda - Written or graphic instruments issued prior to the execution of the Agreement which modify or interpret the Contract Documents, Contract Drawings and Specifications, by additions, deletions, clarifications or corrections.
Agreement - The written agreement entered into between the Owner and the Contractor covering the Work to be performed, including without limitation the Contract Documents.
Change order - A written order to the Contractor authorizing an addition, deletion or revision in the Work within the general scope of the Contract Documents, or authorizing adjustment in the Contract Price or Contract Time.
Contract – The Agreement, including without limitation the Contract Documents.
Contract documents – The documents listed as “Contract Documents” in the Agreement.
Contract drawings – A part of the Contract Documents consisting of the plans for Work.
Contract price - The total monies payable to the Contractor under the terms and conditions of the Contract Documents.
Contract time - The number of calendar days stated in the Contract Documents for the completion of the Work.
Contractor - The person, firm or corporation with whom the Owner has executed the Agreement.
Engineer - The Westport Town Engineer.
Field order - A written order effecting a change in the Work not involving an adjustment in the Contract Price or an extension of the Contract Time, issued by the Engineer to the Contractor during construction.
Notice of award - The written notice of the acceptance of the Bid from the Owner to the successful Bidder.
Notice to proceed - Written communication issued by the Owner to the Contractor authorizing him to proceed with the Work and establishing the date of commencement of the Work.
Owner - The Town of Westport
Project - The undertaking to be performed as provided in the Contract Documents.
Resident project representative - The authorized representative of the Owner who is assigned to the Project site or any part thereof.
Special provisions - Modifications, additions and clarifications to the Contract Documents.
Specifications - A part of the Contract Documents consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards and workmanship.
Work - All labor necessary to produce the construction required by the Contract Documents, and all materials and equipment incorporated or to be incorporated in the Project.
Written notice - Any notice to any party of the Agreement relative to any part of the Agreement in writing and considered delivered and the service thereof completed, when posted by certified or registered mail to the said party at his last given address, or delivered in person to said party or his authorized representative on the Work.
2. Agreement and contract documents
The Contract Documents and all addenda shall form the Agreement, and provisions thereof shall be as binding upon the parties hereto as if they were herein fully set forth.
The Owner will furnish the Contractor, without charge, five copies of the Contract Documents, including Specifications and Contract Drawings. Additional copies will be furnished at nominal cost to the Contractor, upon request.
In case of conflict between the Contract Drawings and Specifications, the Specifications shall govern. Figure dimensions on Contract Drawings shall govern over scale dimensions, and detailed drawings shall govern over general drawings. Any discrepancies found between the Contract Drawings and Specifications and site conditions, or any inconsistencies or
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 26/145 ambiguities in the Contract Drawings or Specifications, shall be immediately reported to the Engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work done by the Contractor after his discovery of such discrepancies, inconsistencies or ambiguities shall be done at the Contractor's risk.
The Contractor may be furnished additional instructions and detail drawings by the Engineer as necessary to carry out the Work required by the Contract Documents. The additional drawings and instructions thus supplied will become a part of the Contract Documents.
3. Shop drawings and submittals
The Contractor shall provide three (3) copies of all shop drawings and submittals as required by the Specifications. The Engineer will retain two (2) copies of all approved shop drawings and submittals, and return one to the Contractor. Shop drawings and submittals are to be submitted as detailed in the Special Provisions, and/or sufficiently in advance of requirements, to provide the Engineer time for review and correction if necessary. The Engineer's review
GC-1
00500
General conditions
Additional content from previous item (3): of shop drawings and submittals shall not release the Contractor from responsibility for deviations from the Contract Documents.
Certificates of conformance must be submitted on all material and/or equipment that will become the property of the Owner. Portions of the Work requiring shop drawings or submittals shall not begin until after review by the Engineer. Any submittals not following this procedure will be rejected.
4. Work area, materials storage, temporary services and facilities
The Contractor shall provide and pay for all materials, labor, tools, equipment, water, light, power, transportation, supervision, temporary construction of any nature, and all other services and facilities of any nature whatsoever necessary to execute, complete, and deliver the Work within the specified time.
The Contractor shall confine his work/storage area to the limits as designated or approved and shall be responsible for the security of the work/storage area. Storage of materials or establishing temporary facilities on private property shall be solely up to the Contractor and he shall assume all responsibility and liability for same. Upon completion of the Agreement, the Contractor shall remove all equipment and materials except as otherwise specified and restore the site to its original condition.
5. Inspection, testing and certificates of conformance
The Owner reserves the right to require testing of any and all materials, equipment or samples delivered to the job site. Such testing shall be done by an independent testing laboratory at the expense of the Contractor. Any material so sampled and found not to meet the requirements of these specifications shall be rejected and the entire shipment removed from the site at the Contractor's expense. Furthermore, the Owner reserves the right to then require each material to be manufactured and tested in accordance with the standard specifications, (e.g. AWWA, ANSI, etc.), cited hereafter.
In addition to other requirements specified, the Contractor shall furnish to the Engineer, in the manner as directed, notarized certificates of conformance for all materials to be furnished under this Agreement. The notarized certificates of conformance shall state that the material to be furnished under this Agreement meets the specification requirements.
When directed, each shipment of material shall be accompanied by the manufacturer's notarized certificates of conformance, certifying that the materials meet the requirements of the specifications.
All materials and equipment used in the construction of the Project shall be subject to adequate inspection in accordance with generally accepted standards. Neither observations by the Engineer nor inspections, tests or approvals by persons other than the Contractor shall relieve the Contractor from his obligations to perform the Work in accordance with the requirements of the Contract Documents.
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 27/145
The Engineer, the Owner and their representatives will at all times have access to the Work. The Contractor will provide proper facilities for access, inspection, and observation of the Work. If any Work is covered contrary to the written request of the Engineer, it must, if requested by the Engineer, be uncovered for his observation and replaced at the Contractor's expense.
If the Engineer considers it necessary or advisable that covered Work be re-exposed, due to suspicion of defective work, the Contractor will uncover, expose or otherwise make available for observation, inspection or testing as the Engineer may require, that portion of the Work in question, furnishing all necessary labor, materials, tools, and equipment. If it is found that such Work is defective, the Contractor will bear all the expenses of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction. If, however, such Work is not found to be defective, the Contractor will be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction and an appropriate Change Order shall be issued.
6. Substitutions
References to brand names or catalogue numbers in the Contract Documents are for the purpose of defining the performance or other salient requirements of materials and equipment. The Contractor may request to substitute materials or equipment of equal substance and function. If in the opinion of the Engineer, such material or piece of equipment is of equal substance and function to that specified, the Engineer may approve its substitution and use by the Contractor. Any cost differential shall be deductible from the Contract Price and the Contract Documents shall be appropriately modified by Change Order. The Contractor warrants that if substitutes are approved, no major changes in the function or general design of the Project will result. Incidental changes or extra component parts required to accommodate the substitute will be made by the Contractor without a change in the Contract Price or Contract Time.
7. Surveys, layout of work
The Engineer shall furnish initial land surveys and establish all base lines for locating the principal component parts of the Work together with a suitable number of bench marks adjacent to the Work as shown on the Contract Drawings.
The Contractor shall perform all layout work necessary for the satisfactory execution of the construction as shown on the Contract Drawings and all costs in connection therewith shall be included in the Contract Price(s).
The Contractor shall be held responsible for protecting and safeguarding all control points and bench marks set by the Engineer and his own forces. Any replacement or re-establishment of control points and bench marks set by the Engineer, shall be at the expense of the Contractor.
GC-2
00500
General conditions
8. Permits, ordinances, and regulations
Permits and licenses of a temporary nature necessary for the prosecution of the Work shall be secured and paid for by the Contractor. The Contractor will be required to obtain a Road Opening permit from the Town of Westport. All fees will be waived.
Permits, licenses and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the Owner, unless otherwise specified. The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the Work as drawn and specified.
9. Supervision by contractor
9/8/26, 7:43 PM Print - Specifications & Project Manual for Wakeman Farm Town Barn Town of Westport Request for Proposal #27-177T Building Shell about:blank 28/145
The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .