This is a Principal Items of Work document for the Margaret South AML Reclamation Project in Alabama. The project encompasses abandoned mine land (AML) reclamation activities focused on addressing environmental and safety hazards associated with legacy mining operations. The scope of work includes detailed specifications for remediation tasks, site stabilization, and restoration activities necessary to restore the affected land to a safe and productive condition. The document outlines the technical requirements, methodologies, and standards that contractors must follow to complete the project successfully. Specific quantities and timelines for individual work items are detailed within the document to guide bidders in preparing comprehensive and competitive proposals.
The document serves as a critical reference for potential contractors bidding on the Margaret South AML Reclamation Project, establishing the baseline expectations for work quality, performance standards, and deliverables. By clearly defining the principal items of work, the document enables bidders to accurately estimate costs, allocate resources, and develop realistic project schedules. This standardized approach to specifying work requirements facilitates fair competition among bidders while ensuring that the selected contractor possesses the necessary expertise and capacity to execute the reclamation project in accordance with Alabama's environmental regulations and project objectives.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Margaret South AML Reclamation Project Principal Items of Work
Description of Work "Lump Sum" Items Unit(s) Qty. Unit Price Extended Price Mobilization LS 1 @ $ = $ Stormwater Erosion Control Management LS 1 @ $ = $ Clearing Acres 14 @ $ = $ Unclassified Excavation Cu. Yd. 46,000 @ $ = $
"Variable Quantity" Items Unit(s) Qty. Unit Price Extended Price Dam Backfill & Compaction Cu. Yd. 12,500 @ $ = $ Silt Fence, Type A Lin. Ft. 5,200 @ $ = $ Wattles (20" Dia.) Lin. Ft. 1,000 @ $ = $ Terraces Lin. Ft. 2,150 @ $ = $ Terrace Erosion Control Blanket Lin. Ft. 2,150 @ $ = $ Contour Erosion Control Blanket Lin. Ft. 3,050 @ $ = $ Non-woven Filter Fabric Sq. Yd. 5,900 @ $ = $ ALDOT No. 24 Limestone Tons 60 @ $ = $ ALDOT No. 57 Limestone Tons 510 @ $ = $ ALDOT No. 8910 Limestone Tons 110 @ $ = $ ALDOT No. 825-B Limestone Tons 245 @ $ = $ Riprap, Class I Limestone Tons 3,470 @ $ = $ Riprap, Class II Limestone Tons 200 @ $ = $ Concrete Grout Cu. Yd. 50 @ $ = $ Pipe, 18" Dia. Corr. PE (N-12) WT/IB Lin. Ft. 40 @ $ = $ Pipe, 30" Dia. Corr. PE (N-12) WT/IB Lin. Ft. 140 @ $ = $ Anti-seep Collar (30" Dia. Pipe) Each 2 @ $ = $ Pond Outlet Control Structure Each 1 @ $ = $ Pond Skimmer (8" Dia.) Each 1 @ $ = $ Detention Pond Baffles Lin. Ft. 700 @ $ = $ Erosion Control Power (PAM) Pounds 140 @ $ = $ Erosion Control Floc Blocks Each 10 @ $ = $ Dolomitic Lime Tons 89 @ $ = $ Commercial Fertilizer (13-13-13) Tons 6 @ $ = $ Seeding Acres 14 @ $ = $ Temporary Seeding Acres 35 @ $ = $ Mulching Tons 45 @ $ = $
* Note: Vendor must list the pricing for each principal items of work and their total contract bid price below. The total bid price must also be listed on the Unit Price, Line 1 of the Request for Bid. Failure to provide and attach copies of the principal items of work pricing as outlined above may result in the rejection of your bid.
Subtotal, Lump Sum Items
Bid Proposal Form Page 1 of 2
Margaret South AML Reclamation Project Principal Items of Work
Description of Work "Variable Quantity" Items Unit(s) Qty. Unit Price Extended Price Temporary Mulching Tons 56 @ $ = $ Gate Installation Each 1 @ $ = $
Contractor
By: Date:
Subtotal, Variable Quantity Items
Total Contract Bid Price (For evaluation of bids only)
** THE TOTAL CONTRACT BID PRICE MUST BE ENTERED IN THE UNIT PRICE IN ALABAMA
BUYS
Bid Proposal Form Page 2 of 2
Principal Items of Work Form
File details come from the government source that posted it. Updated .