PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls

XLS spreadsheet 38 KB Posted

Attached to
Professional Hydrogeological & Well Services
Solicitation number
26-SQ-65SR
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form for Volusia County, Florida, related to Contract No. C-2014 and ITB No. 25-B-##XX for Professional Hydrogeological and Well Services. The form requires bidders to identify all subcontractors proposed to perform scope of work and to document the dollar value and percentage of work assigned to each entity. The county seeks consultant services to evaluate twenty-six production wells, design and oversee permitting and construction or repair of new and existing wells and associated appurtenances, conduct hydrogeological studies and ground water modeling, perform aquifer performance testing, and support water supply planning and permit compliance monitoring across nine water treatment facilities. Bidders must complete designated green-shaded cells with dollar values for prime contractor and subcontractor work, ensuring the total work allocation equals 100 percent and matches the total bid price submission. Failure to complete and return the form may result in a non-responsive bid determination.

The prime contractor bears responsibility for verifying that all proposed subcontractors maintain appropriate licenses. The form will be used to determine local bid preference in accordance with Section 2.8, D of the solicitation. Any changes to proposed subcontractors during project completion require prior approval from the County Project Manager, though the county will not allow modifications to the total submitted base bid pricing. The form accommodates various anticipated subcontractor disciplines including electrical, HVAC, plumbing, landscaping, and other trades, with additional blank rows available for disciplines not pre-listed.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .