Prime and Subcontractor Construction Breakdown.xlsx

XLSX spreadsheet 147 KB Posted

Attached to
Z2DA--666-27-102 Lightning Protection Update B71N
Solicitation number
36C25926Q0880
Issued by

About this file

This is a construction cost estimate template formatted as a Prime and Subcontractor Construction Breakdown spreadsheet using the 16-division MasterFormat classification system. The template is structured to capture detailed labor and materials costs for construction projects, with separate line items for quantity, unit cost, and total cost calculations across four estimate alternatives (A, B, C, D). The divisions covered include General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Utilities, and Transportation. Each division section includes fields for local market conditions adjustments and small business utilization percentages, with summary calculations for subtotal, overhead, profit, bonds, and project total.

The template provides a standardized framework for estimators to organize construction costs by trade and building system, facilitating comparison between prime contractor and subcontractor bids. All cost fields are currently set to zero dollars, indicating this is a blank form ready for population with project-specific pricing data. The spreadsheet appears designed to support the Sheridan VA Medical Center lightning protection system upgrade project (Building 71N), which requires contractor estimates for repairs and upgrades to meet NFPA 780 and UL96A standards at the Sheridan, Wyoming Veterans Affairs Medical Center facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMATION

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NEW PROJECTNO DESIGNPRELIMINARY
COMPLETEDDESIGN
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMNOTESTOTAL
ABCD
DIVISION 0-SPECIAL SECTIONS$ - 0
DIVISION 1-GENERAL REQUIREMENTS$ - 0
DIVISION 2-EXISTING CONDITIONS$ - 0
DIVISION 3-CONCRETE$ - 0
DIVISION 4-MASONRY$ - 0
DIVISION 5-METALS$ - 0
DIVISION 6-WOOD AND PLASTIC$ - 0
DIVISION 7-THERMAL AND MOISTURE PROTECTION$ - 0
DIVISION 8-DOORS AND WINDOWS$ - 0
DIVISION 9-FINISHES$ - 0
DIVISION 10-SPECIALTIES$ - 0
DIVISION 11-EQUIPMENT$ - 0
DIVISION 12-FURNISHINGS$ - 0
DIVISION 13-SPECIAL CONSTRUCTION$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0
DIVISION 22-PLUMBING$ - 0
DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING$ - 0
DIVISION 26-ELECTRICAL$ - 0
DIVISION 27-COMMUNICATIONS$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0
DIVISION 31-EARTHWORK$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0
DIVISION 33-UTILITIES$ - 0
DIVISION 34-TRANSPORTATION$ - 0
SUB-TOTAL$ - 0
OVERHEAD@$ - 0
PROFIT@$ - 0
BONDS@$ - 0
PROJECT TOTAL:$ - 0

&A

&D

Div 0 Special Sections

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 0 Special Sections
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 1 General Requirements

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Divison 1 General Requirements
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

Div 2 Existing Conditions

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 2 Existing Conditions
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 3 Concrete

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 3 Concrete
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 4 Masonry

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 4 Masonry
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 5 Metals

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 5 Metals
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&A

&D

Div 6 Wood & Plastic

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 6 Wood & Plastic
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&A

&D

Div 7 Thermal & Moisture Protec

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 7 Thermal & Moisture Protection
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 8 Doors & Windows

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 8 Doors & Windows
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 9 Finishes

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 9 Finishes
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions10.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 10 Specialties

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 10 Specialties
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 11 Equipment

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 11 Equipment
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 12 Furnishings

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 12 Furnishings
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 13 Special Construction

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 13 Special Construction
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Division 14 Conveying Equipment

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 14 Conveying Equipment
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 21 Fire Suppression

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 21 Fire Suppression
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 22 Plumbing

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 22 Plumbing
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 23 HVAC

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 23 Heat, Ventilating, and Air Conditioning
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 26 Electrical

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 26 Electrical
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market ConditionsSmall Business Utilization$0
SECTION TOTAL:$0

&D

Div 27 Communications

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 27 Communications
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 28 Electronic Safety & Secu

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 28 Electronic Safety & Security
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 31 Earthwork

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 31 Earthwork
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization$0
SECTION TOTAL:$0

&D

Div 32 Exterior Improvements

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 32 Exterior Improvements
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 33 Utilities

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 33 Utilities
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

Div 34 Transportation

DATE
SHEET NO.OFSHEETS

PROJECT NO. LOCATION PROJECT NAME TYPE OF ESTIMATE

NO DESIGNPRELIMINARY
COMPLETEDDESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S)DRAWING NO.
FINALOTHER
DESIGN(SPECIFY)
CODESYSTEM/SUBSYSTEMLABORMATERIALS
ABCDQUANTITYUNIT$/UNITTOTALQUANTITYUNIT$/UNITTOTALTOTAL
Division 34 Transportation
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
$0.00$0.00$0
Adjustments:Local Market Conditions0.00%Small Business Utilization0.00%$0
SECTION TOTAL:$0

&D

File details come from the government source that posted it. Updated .