Primary Road List.xls

XLS spreadsheet 69 KB Posted

Attached to
MOWING - HORRY COUNTY 2019-2023
Solicitation number
5400016811
Issued by
Horry County, South Carolina

About this file

Primary Road List Summary for Horry County, South Carolina

This document is a Primary Road List for Horry County, South Carolina, detailing roadway maintenance requirements for the 2019-2023 mowing contract opportunity. The list encompasses all primary routes within Horry County, including US highways (17, 378, 501, 701), South Carolina highways (9, 22, 31, 90, 179, 319, 410, 544, 707, 905), business loop routes, connector routes, and numerous secondary rural roads designated as R and RS routes. The spreadsheet identifies specific road segments by route number, type, beginning and ending mile points, and categorizes maintenance activities across routine mowing, brush mowing, brush management, vegetation mowing, and bridge and guardrail management.

The document quantifies maintenance requirements across four pages with a county total of 1,933.28 acres requiring routine mowing and 662,045 linear feet of guardrail requiring maintenance. Individual road segments are broken into sub-totals by functional classification, with primary routes accounting for 1,675.12 acres, rural roads (R routes) accounting for 66.70 acres, and secondary fields and ramps accounting for 191.46 acres. The listing provides detailed acreage allocations for routine mowing (Typical 1 and Typical 2 mowing types), brush management, vegetation mowing, and bridge/guardrail footage, enabling contractors to calculate labor, equipment, and material requirements for the multi-year contract period covering 2019-2023.

View the file

Other files

File Type Posted
Solicitation-5400016811.pdf PDF
Notice Regarding Award.docx DOCX document
Amendment #1.pdf PDF
Horry Lot Summary.xls XLS spreadsheet
Secondary Road List.xls XLS spreadsheet
Horry Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PrimaryPAGE1

2019 ROADS LIST - PRIMARY ROUTESPAGE 1 OF 4
ROUTE TYPECOUNTY
PRIMARYHORRY 2019
RouteRouteAuxBeginEndRoutineRoutineBrushBridgeGuardrail
TypeNo.MileMileMowingMowingMngmt.Vegetation(Feet)
(US, SC)PointPoint(Acres)(Acres)(Acres)Mowing
Typical 1Typical 2(Acres)
SC9BUS2.707.4715.79
SC9BUS9.7815.0116.19
SC9012.1619.2061.1326910
SC9023.0239.64143.95570
SC9000.0022.0264.0610
SC17900.000.891.29
SC31904.9813.2117.094175
SC41000.002.236.44
SC90500.8625.6172.004414
US1700.008.86128.873908
US17020.2821.100.26
US17021.5423.8817.02212
US17030.7033.639.885490
US17034.3935.883.03
US17CON0.000.568.151003
US17BUS0.000.400.97
US17BUS4.976.011.26
US17BUS7.007.111.33
US17BUS17.4019.005.82
US37800.008.3726.029613
US501BUS1.984.606.3516157
US50107.8118.02129.95530
US501019.3630.9633.7526723
US70100.0011.6333.8316526
US701017.3233.4649.642641
US701034.5839.4919.37317
SC2200.0028.20410.18218860
SC22029.3029.600.73
SC3100.0024.33353.45262075
SC31024.3328.0921.2628877
SC544CON100.00100.861.12
SC544CON0.000.501.16
SC54400.0013.849.433376
R551500.000.200.48
R551600.000.210.51
R551700.000.751.83
R551800.000.280.67
R551900.000.090.21
R552000.000.130.32
R552100.000.130.16
R552200.000.140.17
SUB-TOTAL0.001675.120.000.00632387

PrimaryPAGE2

2019 ROADS LIST - PRIMARY ROUTESPAGE 2 OF 4
ROUTE TYPECOUNTY
PRIMARYHORRY 2019
RouteRouteAuxBeginEndRoutineRoutineBrushBridgeGuardrail
TypeNo.MileMileMowingMowingMngmt.Vegetation(Feet)
(US, SC)PointPoint(Acres)(Acres)(Acres)Mowing
Typical 1Typical 2(Acres)
R552300.000.250.30
R552400.000.340.42
R552500.000.320.77
R552600.000.180.43
R552700.000.150.35
R552800.000.220.54
R552900.000.33.79.
R553000.000.190.45
R553100.000.270.66
R553200.000.340.82
R553300.000.280.67
R553400.000.200.49
R553500.000.461.12
R553600.000.150.36
R553700.000.591.42
R553800.000.631.52
R553900.000.310.76
R554000.000.400.96
R554100.000.350.86
R554200.000.360.86
R554300.000.320.78
R554400.000.220.53
R554500.000.240.58
R554600.000.410.98
R554700.000.190.46
R554800.000.220.53
R554900.000.200.48
R555000.000.310.75
R555100.000.380.91
R555200.000.210.51
R555300.000.330.80
R555400.000.260.63
RS652800.000.150.18
R555500.000.290.71
R555600.000.140.34
R555700.000.220.53
RS555800.000.360.87
R557100.000.441.07
R557200.000.330.79
R557300.000.150.36
R557400.000.170.40
SUB-TOTAL0.0026.950.000.000

PrimaryPAGE3

2019 ROADS LIST - PRIMARY ROUTESPAGE 3 OF 4
ROUTE TYPECOUNTY
PRIMARYHORRY 2019
RouteRouteAuxBeginEndRoutineRoutineBrushBridgeGuardrail
TypeNo.MileMileMowingMowingMngmt.Vegetation(Feet)
(US, SC)PointPoint(Acres)(Acres)(Acres)Mowing
Typical 1Typical 2(Acres)
R557500.000.230.55
R557600.000.300.73
R557700.000.150.37
R557800.000.300.72
R100.001.002.43
R200.000.691.67
R300.001.042.52
R400.000.551.34
R500.000.230.55
R600.000.230.55
R700.000.380.92
R800.000.350.85
R900.000.661.60
R1000.000.741.79
R1100.000.721.75
R1200.000.671.63
R1300.000.360.87
R1400.000.240.57
R1500.000.270.66
R1600.000.340.81
R1700.000.240.59
R2000.000.380.93
R2100.000.591.43
RSpur652800.18
R506100.000.40130
R506300.000.410.421466
R506400.000.540.542060
R517400.000.1980
R517500.000.260.25734
R558000.000.390.221940
R558100.000.300.242121
R558200.000.310.201745
R558300.000.300.211841
R558400.000.430.242070
SC70700.0011.6311.422321
SUB-TOTAL0.0039.750.000.0016508

PrimaryPAGE4

2019 ROADS LIST - PRIMARY ROUTESPAGE 4 OF 4
ROUTE TYPECOUNTY
PRIMARYHORRY 2019
RouteRouteAuxBeginEndRoutineRoutineBrushBridgeGuardrail
TypeNo.MileMileMowingMowingMngmt.Vegetation(Feet)
(US, SC)PointPoint(Acres)(Acres)(Acres)Mowing
Typical 1Typical 2(Acres)
US-17 RAMP (S1407-KINGS RD to WB SC-22)0.000.320.38
US-17 RAMP (SB US17 to WB SC22)0.000.130.16
SC31 NEW RAMPS AT SC-544 & SC-70710.14
SC31 SC544 FIELDS6.00
SC31 US501 FIELDS5.00
SC31 WATERTOWER RD3.582580
SC31 S-1315 FIELDS7.0010570
SC31 SC9 FIELDS6.00
SC22 US501 FIELDS29.96
SC22 SC319 FIELDS11.60
SC22 US701 FIELDS13.90
SC22 SC905 FIELDS11.75
SC22 SC90 FIELDS45.30
SC22 SC31 FIELDS28.74
SC22 US17 FIELDS11.95
SUB-TOTAL0.00191.460.000.0013150
COUNTY TOTAL PRIMARY ACRES / GUARDRAIL0.001933.280.000.00662045

File details come from the government source that posted it. Updated .