Pricing_Worksheet.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
BURRO CREEK WATER SYSTEM RV DUMP STATION RENO
Solicitation number
140L6422R0001
Issued by

About this file

This pricing worksheet and solicitation request proposals for renovations to the Burro Creek Water System and recreational vehicle dump station. The Bureau of Land Management Arizona State Office is seeking bids to support required renovations, including site clearing, excavation, concrete, utilities and other construction work. Offerors should provide unit pricing for line items such as pipe installation, cleanouts, yard hydrants, and tank disinfection. The solicitation is set aside for small businesses under NAICS code 237110 with a size standard of $39.5 million. Proposals are due by the date specified in solicitation number 140L6422R0001.

View the file

Other files

File Type Posted
Sol_140L6422R0001_Amd_0002.pdf PDF
Sol_140L6422R0001_Amd_0001.pdf PDF
Project_Specifications.pdf PDF
Past_Performance_Questionnaire.doc DOC document
Wage_Determinations.pdf PDF
Final_Construction_Plans.pdf PDF
Sol_140L6422R0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schdule

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

BURRO CREEK WATER SYSTEM AND RV DUMP STATION RENOVATIONS
KINGMAN FIELD OFFICE
CONTRACTOR BID SCHDULE
Solicitation No:
Date:
CSIDescriptionTotal
01Mobilization/Demobilization$
02Existing Conditions$
03Concrete$
31Earthwork$
33Utilities$
Subtotal$
General Contractor Fees
General Contractor Overhead$
General Contractor Profit$
Sub Total$
Bonds and Insurance$
Sub Total$

Project Total $

&"Arial Narrow,Regular"Project Summary &"Arial Narrow,Regular"&P

Item Details (No Unit Price)

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

BURRO CREEK WATER SYSTEM AND RV DUMP STATION RENOVATION
KINGMAN FIELD OFFICE
CONTRACTOR BID SCHDULE
Solicitation No.:
Date:
01General ConditionsQuantityUnitCost / UnitTotal
1Mobilization/Demobilization1LS$$
2Sanitary Facility - General Public4EA$$
Total$
02Existing ConditionsQuantityUnitCost / UnitTotal
1Selective Demolition1LS$$
2Cleaning and Patching1LS$$
Total$
03ConcreteQuantityUnitCost / UnitTotal
16" Concrete Waste Drain Pad9SY$$
24" Concrete Sidewalk - Lower Restroom7SY$$
34" Concrete Sidewalk - Lower Day Use4SY$$
4Rock Retaining Wall and Footer94LF$$
54" Concrete Pad at Yard Hydrants18SY$$
Total$
31EarthworkQuantityUnitCost / UnitTotal
1Site clearing1LS$$
2Unclassified Excavation25CY$$
3Pipe Bedding and Initial Backfill532CY$$
Total$
33UtilitiesQuantityUnitCost / UnitTotal
13/4" HDPE Pipe151LF$$
21" HDPE Pipe380LF$$
32" HDPE Pipe3980LF$$
44" SDR 35 PVC Pipe1274LF$$
51" Backflow Preventer1EA$$
64" Cleanout assembly16EA$$
7Yard Hydrant9EA$$
8RV Dump Station Rinse Tower1EA$$
92" Gate Valve and Box11EA$$
101" Gate Valve and Box10EA$$
113/4" Valve and Box2EA$$
122"x2"x3/4" Tee2EA$$
132"X2"X1" Tee10EA$$
142"x2"x2" Tee5EA$$
15Self-Closing Foot Operated Cover2EA$$
162-inch Sch 80 PVC40LF$$
17PVC UV Jacketing40LF$$
18Reinstall Hatch w/ EPDM Double Bulb Lid Seal1LS$$
1924 Mesh Vent Screen2EA$$
2020 GA Roof Decking185SF$$
2120 GA Center Cone Cover28SF$$
22Reinstall 1.25"X1.25"X12 GA Angle Iron w/ EPDM Gasket48LF$$
23Tank Disinfection1LS$$
Total$
Construction Cost Sub-Total$

&"Arial Narrow,Regular"Item Details &"Arial Narrow,Regular"&P

File details come from the government source that posted it. Updated .