Sol_140L6422R0001_Amd_0002.pdf
PDF 126 KB Posted
- Attached to
- BURRO CREEK WATER SYSTEM RV DUMP STATION RENO
- Solicitation number
- 140L6422R0001
About this file
This document contains an amendment to a solicitation for water system and recreational vehicle dump station renovations at the Burro Creek Campground. The Bureau of Land Management Arizona State Office seeks to replace water lines, repair the water tank to make it potable, and perform other renovations. The solicitation is a small business set-aside under NAICS code 237110 with a $39.5 million size standard. The amendment provides responses to contractor questions, clarifying that the campground will remain open during construction but some facilities may be restricted, contractors can stay in an RV space without fees, and fire protection and a generator are required. It also specifies construction details such as unpaved gravel roads, well water availability, and septic tank connections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6422R0001_Amd_0001.pdf | ||
| Project_Specifications.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document | |
| Wage_Determinations.pdf | ||
| Final_Construction_Plans.pdf | ||
| Sol_140L6422R0001.pdf | ||
| Pricing_Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L6422R0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LZA
PHOENIX AZ 85004
ONE N. CENTRAL AVE, SUITE 800
BLM AZ-STATE OFC ADMN SVCS(AZ951)
12/07/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/15/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. The purpose of this amendment is to provide the Government reposnes to Contractor questions.
B. All other terms and conditions remain unchanged.
Period of Performance: 04/01/2022 to 09/01/2022
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christopher Jordan
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1. Will campground be closed while repairs are taking place?
The campground will not be closed. The Notice to Proceed will not be issued until April 1, 2022. Typically, around April 1 is when campground is usually empty or close to empty.
2. If campground is open during renovations, what facilities will require water to operate?
Facilities will not have access to water. Since the project is to replace the water lines and other various things the water would need to be shut off for you to work and complete project.
3. If campground is open, will BLM be restricting access to parts of the camp while work is taking place?
There is unrestricted access. Phasing of project may be required.
4. Are contractors allowed to stay in an RV space at the campground with reservation and payment of fees?
Contractors are allowed to utilize campground (not camp host spot). Contractors are not required to pay fees during duration of project.
5. Is there Potable water at the campground?
Water is not potable. Part of this project is to repair the tank and make it potable.
6. Are permits required or is all work being completed on BLM land?
Work is on BLM Land. Contractor to pull ADEQ permit with approved plans.
7. Is water line being replaced under Burro Creek Campground Rd? How large is the conduit under the road, can it accommodate an additional 2” water line?
A water line is to be replaced utilizing the conduit to go under the Burro Creek Campground Rd.
Yes, the water line can fit through it.
8. Will hydrants need to have constant water while repairs are taking place?
No, water should be shut off for construction to be completed.
9. Does the GC need to provide portable water truck in case of fire emergency?
Contractor to provide fire protection which can include fire extinguishers. Water trucks are not required for fire emergency use.
10. What areas of the facility can be used for storage of materials and equipment?
TBD. Contractor to work with COR and field personnel to determine adequate spots.
11. Are road surfaces paved or packed gravel?
Road surfaces at the campground that will be trenched to replace lines are gravel.
12. If paved roads what are specifications for patching trenched locations across pavement?
No paved roads to be trenched.
13. Is Burro Creek Campground Road BLM owned and paved by BLM or is it a county road paved by the county?
BLM Road and paved by BLM.
14. Will there be a place for excavation spoil to be placed?
TBD. Contractor to work with COR and field personnel to determine adequate spots.
Contractor’s responsibility to haul and dispose of trash material.
15. Will crews be able to utilize the well for construction water?
North well can be pumped into the water tank. Contractor can utilize that tank with proper connections to fill water trucks to complete all work at the campground. Once contractor starts work at the tank, then the tank can’t be utilized as the tank repair is part of the project.
South well can be utilized for construction water only with proper connections. No water tank available at South well.
Contractor to provide generator power to utilize wells.
16. Is the well water safe to drink (potable water)?
Water is not potable. Part of this project is to repair the tank and make it potable.
17. Do the septic tanks need to be pumped out?
Contractor’s responsibility to make proper connections to septic tanks per plans and specs.
Contractor to do what is needed to make those connections.