Pricing__Sheet_REV1.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Vegetation Management Consulting and Inspections
- Solicitation number
- PR8201
- Issued by
- Florida
About this file
The provided document is a Pricing Sheet for the Orlando Utilities Commission (OUC) Vegetation Management Consulting and Inspection Services contract. The procurement seeks professional services for utility vegetation management, including trimming inspection, verification, integrated vegetation management plan development, tree risk assessment, expert-witness testimony, and educational workshops. The contract opportunity was posted on May 1, 2025, with a submission deadline of March 20, 2025, targeting vendors with specialized expertise in utility vegetation management.
The pricing sheet details hourly rates for various professional roles, including Arborist/Forester Technicians, Certified Arborists, Urban Foresters, and Expert Witnesses. Rates include overhead costs, background checks, per diems, equipment, supplies, and travel expenses. A mobilization fee is included for crew travel to and from the OUC system, with reimbursement for a single mobilization per inspection cycle. OUC requires a mandatory 2-hour orientation class at the Pershing office location before each electric utility distribution/transmission vegetation inspection cycle, with reimbursement for orientation hours but not travel time. Overtime is defined as hours beyond the standard 40-hour work week, requiring prior written approval from OUC.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet Price Schedule
Provide per hour pricing in USD $. List any additional costing that is required for invoicing.
| Hourly Rate* | Overtime Rate*/** | |
| Arborist / Forester Technician | ||
| Certified Arborist (CA) | ||
| Registered Consulting Arborist (RCA) | ||
| Certified Arborist Utility Specialist | ||
| Urban Forester/Forester | ||
| Expert Witness Testimony | ||
| Administrative | ||
| Other |
| Inspection Mobilization fee: inclusive of crew travel to OUC system at start of project, and travel from OUC system at the end of the project. OUC shall reimburse the vendor for a single mobilization per inspection cycle. |
| Inspection Mobilization Lump Sum: |
Please note that OUC requires a 2 hour Orientation class at the Pershing office location prior to the commencement of each electric utility distribution/transmission vegetation inspection cycle. OUC shall reimburse vendor for the hours for the orientation class, but not travel to/from the class.
* Hourly Rates: Include overhead costs, background checks to become badged as an OUC contractor, per diems (inclusive of lodging), equipment, supplies, computers, mileage, and tolls.
** Overtime: OUC assumes 40 hours per week as a regular crew work schedule. Any hours beyond 40 per week shall be approved in writing by OUC prior to the vendor working those additional hours in a week.
File details come from the government source that posted it. Updated .